Tender For corrigendum : supply of plug cpc 13-9 (reference chart no.40027876 alt. kc) as per drg.no. 40026394 alt d specn: str no. del/el/str/010 rev. 0.0 to pl no. 18360208 [ warranty period: 30 months after the date of delivery ]]
Tender For corrigendum : supply of vertical hydraulic damper [part no.17660543] as per drg.no. 17660543 [ warranty period: 48 months after the date of delivery ] ]
Tender For corrigendum : supply of spare part kit z001+z005 fastmig pulse 450 sp600512, make-kemppi/esab/lincoln [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of scotch danger -caution tape as per drg.no. as per drg.no. 29610904 alt nil specn: clw spec.no.clw/es/3/0161/a to pl no. 29610904 [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of refrigerant valve- hot gas by pass regulator kvc 12 034l0143range-0.2-6 barmake-danfoss, emerson, tecumseh. [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of heavy duty dry basic ramming mass spec:as per rwp specification no. rwp/m/specn-1/114/2024 alt nil[quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : supply of over coat (doctor type) for ladies with two front pockets size as per plw specification no. plw/m/ safety/ specn- 38 (rev.-01) date: 21.05.2026. [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : supply of brass pipe fittings for e-70 brake system cat no.s/9/0025 s/11/0025 as per drg.no. 29230147 alt f specn: clw/ts/99/cf/5 alt.9 [ warranty period: 24 months after the date of delivery ] ]
Tender For corrigendum : supply of cover-ost cover plate as per drg.no. 8058255 alt eb as per specn. misc:723 [ warranty period: 30 months after the date of delivery ] ]
Tender For corrigendum : i) design, manufacture, supply of one (01) number of 10 tonnes electric overhead travelling crane along with lifting magnet suitable for scrap handling and all accessories conforming attached leading parameters. ii) installation, commissioning of one (01) number of 10 tonnes electric overhead travelling crane. iii)removal of existing dsl conductor system and supply, installation and commissioning of new down shop lead conductor system of 336 meter. iv) spares (as indicated in leading parameters). v) training of staff. [ warranty period: 24 months after the date of delivery ] ]