Tender For supply of screened dry sand 12 kg in weight duly packed & stitched in each bag waterproof with lamination..waterproof stitched bags with lamination material of bag can be plastic or gunny. [ warranty period: 30 months after the date of delivery ]
Tender For work-electrical work- (a) provision of 20 unit type-ii staff quarters in police colony at ddu 4) (b)- provision of 20 unit type-ii staff quarters in new central colony at ddu (c)_ provision of 20 unit type-ii staff quarters in loco colony at ddu under special repair se/ph/ddu
Tender For launching/erection, assembling and transportation of composite girder/open web girder and psc girder/slab for super structure of major bridges, linking of track on bridge, supply & fabrication of pathway materials, and other allied works from 51.80 km to 64.6 km between triveniganj and jadia in connection with construction of araria-supaul new line in samastipur division of e.c.railway.
Tender For supply of knuckle pivot pin. material & specification: rdso specification no. rdso/2011/cg-03 (rev-03 ) with amendment slip 1 of july.24 [ warranty period: 84 months after the date of delivery ]
Tender For supply of repair kit for m48 schedule prag polymer air dryer consisting 46 items 88 nos.as per " annexure- a " [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of bolt hex head for wag-9 loco as per annexure attached. specification :- clw spec. no. clw/ms/3084 with latest to is:1364 8.8 as per is-1367 (pt- 3) gr. a to is 1367 (pt-ii). [ warranty period: 30 months after the date of delivery ]
Tender For work-schedule: upgradation of power supply system including improvement of illumination with emergency light under ts-1 and ht section in ddu.
Tender For supply of etp connector plug 3 pole as per emd part no 8459984 and dlw part no 18360063 with pins. [ warranty period: 30 months after the date of delivery ]
Tender For supply of electronic load ammetr, for demu/dpc drg. no.dti-071, model-ss-701, make -samadhan system or equivalent. [ warranty period: 30 months after the date of delivery ]