Tender For construction of balance work of single line bg tunnel no. 6 main tunnel ( length-1746 m), escape tunnel ( length-1542 m) and cut and cover (length- 250 m) and slope protection work from portal p1 side and other ancillary works between ch. 45750.0 m to ch. 50746.0 m in pherima-piphema section in connection with dimapur-kohima new bg line project.
Tender For supply of dell entry level desktop computer with warranty 3 year make: dell, model: (dell vostro 3030sff) or similar. [ warranty period: 36 months after the date of delivery ]
Tender For supply of buffet set including 4nos. 8ltr. and 6nos. 10ltr. capacity steam pans, 10nos. serving spoon, 2nos smalltoung, 2nos. bigtoung, 4nos. ss tray,4nos buffet pvc standing table. ]
Tender For engineering, procurement & construction of "design, supply, erection & commissioning of tunnel ventilation, electrical and mechanical system and 33kv/11kv sub-station, fire fighting system equipments at tunnel no. 1 in connection with dimapur - kohimal new bg line project. (3.5 km)
Tender For request for proposal (rfp) for appointment of general consultant (gc) for design engineering works of general manager, nf railway (construction), maligaon
Tender For conducting dgps/total station survey, checking/fixing of centerline on ground with reference to various gcp during work execution, hydrological survey and fixing of reference pillars at various locations in phase iii in between stations pherima & zubza in connection with the construction of new bg line from dhanasiri to zubza.
Tender For detailed geotechnical investigation of railway embankments and associated structures between ch. km 116.100 and km 124.830 for the jiribam-imphal new bg line project.
Tender For corrigendum : supply & testing of type 1+2+3 ac surge protector 3-phase+n (at input) of make: citel or similar isi approved make. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply & testing of 15kv galvanic isolation transformer 1ph-1ph (class h) make: krycard or similar isi approved make. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of battery iron rack, interlinks cables lugs for holding 40nos 12v 42ah battery [ warranty period: 30 months after the date of delivery ]