Tender For shifting and lying of 3cx95 sqmm copper conductor cable along with related equipment for installation of new lhd at 400 ft level at gumgaon mine.
Tender For single core e-beam irradiated cross linked thin walled flexible elastomeric cable with copper conductors of size 6 sq.mm(84 x 0.31mm), voltage grade 1.8/3.0 kv conforming to rdso specification no. elrs/spec/elc/0019 (rev.4) of february 2018 or latest. note: firm to supply the cables in red, yellow, blue & black colours in equal quantities. [ warranty period: 30 months after the dateof delivery ]
Tender For auction sale of scrap of 33kv pts,scrap of 220kv cb,scrap of 220 kv ct,scrap of 400kv cvt,scrap of ms chain link fencing along with barbed wire and ms angle,scrap 220kv ct,scrap of empty oil drums,scrap of-various faulty 3 phase motors,scrap of 220 kv pt,scrap of 400 kv ct,scrap of battery charger,scrap of 132 kv ct,scrap of 220 kv ct,scrap of 220 kv center break isolators,scrap of empty oil drums/barrel,scrap of (main & stand by) 10 kva ups without battery set,scrap of lead acid battery cell,scrap of empty oil drums,scrap of 2 v 200 ah battery cell,scrap of 33 kv ct,scrap of acsr conductor,scrap of aaac conductor,scrap of g i tower angle
Tender For corrigendum : stringing of ht line with covered conductor 650mts fitting and erecting one 100kva transformer 1 no fitting and erecting ht apole 26 nos
Tender For construction and stringing of new covered conductor feeder along existing feeder including 6pole structure under electrical section manapally.
Tender For auction sale of insulated conductor scrap,lt s/core cable scrap,lcc scrap with alluminium,cast alluminium scrap,all alluminium scrap,tin tapper scrap
Tender For corrigendum : supply of thin walled e-beam irradiated /chemical curing flexible cable size 35 sqmm with copper conductor working voltage above 750v & upto 1.8/3.0 kv grade, as per rdso spec. no. elrs/spec/elc/0019 rev.4 of feb 2018 or latest. specn: rdso spec. no. elrs/spec/elc/0019 rev.4 of feb 2018 or latest. [ warranty period: 30 months after the date of delivery ]