Tender For replacing the damaged doors and windows of the control room, providing of required pvc rain water pipes, reconstruction of damaged dummy pillars on terrace, construction of damaged portion of the compound wall and a drainage sump near the old control room, providing of spiral staircase to terrace floor, sunshades and a water storage tank, casting of new cover slabs over the cableducts, providing of grills to the windows, repairs to the existing gents toilet, providing of vitrified tiles at damaged portion to the first floor of the control house and other miscellaneous works at 220kv ss tekkali in srikakulam district (2nd call)
Tender For bid to ras supply of tab cetrizine 10 mg , tab avil 25 mg , tab ondansetron 4 mg , cough sills lozenges , band aid , thomas splint , cock up splint , ankle brace various sizes large and xl , lumbosacral belt various sizes large and xl , finger splint , ear drop candibiotic , syrup sorbilin 100ml , tab cheston cold , tab zerodol mr , wrist braces with thumb support , cervical collar , knee brace various sizes small large and xl , arm sling , shoulder immobilizer or sling , crape bandage 10 cm , crape bandage 15 cm , elbow braces , sitz bath , hot water bottle , dettol liquid 1 point 3 littre , ecg jelly , oint annovate 20 gm
Tender For corrigendum : supply of hoses for use in pv351 e drill d d ? g? g - hose assy -front jack , part no- 57610487 or equivalent , hose assy -rear jack , part no- 57610479 or equivalent , hose assy-rear jack , part no- 57610297 or equivalent , elbow , part no- 57690091 or equivalent , elbow hose , part no- 52209848 or equivalent
Tender For procure, supply and installation of equipment and instruments for uvce-furniture & hostel equipments - gas pipe line 1, price escalation, miscelleneous and rounding off, two tier bunker cot, five feet aluminum foldable ladder 1, office chair and table, officealmirah, almirah1, metal perforated chair, reading table, table for director, executive table with side table, staff chair, staff table, comfortable study metal folding chair with cushion, wooden desktop library table, white board, computer table 1, computer chair 1, wooden podium 1, notice board 1, visitor chair, electronic podium, table for lab station, spoon crates, glass crates, plate rack crates, dish quick 20 ltrs, dish care rinse 20 ltrs, plate storage rack, dishlanding table chute, jet spray, pre-wash loadingtable, dishwasher, soiled plate drop off table, floor drain plate, floor drain plate non skidable, plate trolly, ground cleaning machine, flate form trolly, working table24x60x34, hot bainmari counter, canopy, service counter, rice,dal,sugar,atta bin, onion, potato coconut bin, ss pallets 4 feet, plate washing sink, vessel store rack with 4 shelf, atta mixer, pipe size 2 square tube 16 gage, working table, chapathi table, masala table, ss. glass coffee, ss glass, ss plates, five hundred lph ro water plant, alu.rice strainer, mane, ss kurptybigg -48, ss kurpty, ms huttu, alu.paratha, ss atta strainer, ms scrapper, ss saucepan medium 8 inch, ss saucepan nosbig9, ss utensils, alu cooker prestige, alu cooker, ss sout, ss rice sout, ms hoolijardi, ms jara, ms kadai 1, ms kadai, ss tea strainer, ss tea drum, ss kolga, alu kolga12kg capacity, ss bucket, alu kolga10kg capacity, alu kolga15kg capacity, alu dabari5kg capacity, alu dabari10kg capacity, alu dabari 20kg capacity, automatic roti machine(500), automatic roti machine, gas pipe line, system erection charges with necessary supports and fasteners, vcd micro mesh air filter4boxes, ac grill set, system, volume damber, gi ducting1, freshairblowermotor3hp3phase(sound less), idly box supporting table, steam idly box, samber cooker, rice cooker, steamequipment27kwsteamgenerator(27kwsteamboiler), chapatti platform, dosa platform, single burner biryani stove, centri fungal blower, gi ducting, exhaust hoodwall type, electricssware-18% (4doorfridge), one hundred and twenty oneflange ball wall three fourthinch, steam line(steam pipe line), single burner cooking range
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For tiruppur corporation_z4_gf_maintenance and special repaire work and providing and fixing of equipments tools and plants to the micro compost centre at shanthapettai ii in ward no 52 - supply and fixing of sanitary napkin destroyer machine machine with storage capacity of 100 napkins per day with dimension of 220mm x 220mm x 360mm of wall mounting style no 1 pcs etc.,, supply and fixing of plastic crates of dimension 460mm * 520 mm with isi standard etc.,, supply and fixing of plastic barrels of measuring 800 litres with lid for storing of enzymes with isi standard etc.,, supply and fixing of plastic dustbin of measuring 250 litres for storing dry waste on segregation etc.,, supply and fixing of pest controller of 64w with 360 inser killer etc., complete as per lowest quotation., providing safety gloves and apron for the workers with isi standards etc.,, supply and installation of viberator separator capacity of 1 ton/hr with power 2hp motorand measuring of size 3*6 feet and the installation to the required place as per instruction of departmental officers etc complete., supply of powing tools and segegrator for the ground work of mcc compost tank with isi standard and proper measuring length according to the requirement., supply of industrial making trolly as per standard sixw using of lead purpose etc.,, plain cement concrete 1:4:8 [one cement, four m-sand and eight course aggregates] using 40mm size hard broken/machine crushed granite stone jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification., supplying and fixing in position white glazed earthenware oriya type indian water closet of size 580mm x 440mm of approved quality with p (or) s trap confirming to is:2556 - part xii with sand cushion and forming flooring around the closet using 40mm broken brick jelly in lime concrete 1:2:5 mix (one lime, two m-sand and five brick jelly) 100m thick and finishing the top to the required slope and including giving necessary connection to the cast iron soil pipes / pvc pipes by dismantling the brick masonry, reinforced concrete roof / floor slab and making good the disturbed portion to original condition without any leakage etc., complete complying with standard specification., paving the floor with 8mm thick joint free rectified glazed ceramic flooring tiles of all colours in all floors over a base layer of cement mortar 1:3 [one cement and three m-sand] 20mm thick laid in-situ and pointed with the same coloured cement neatly, including polishing with electric polishers to a high degree so as to make it perfectly smooth and showing etc., complete complying with standard specification., plastering with cement mortar 1:5 mix (one cement five p-sand), 12mm thick in all floors using clean screened m-sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification., painting two coats with approved cement paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface and curing etc., complete as per standard specification., finishing the top of flooring with a layer of cement concrete 1:3 [one cement and three stone jelly] ellis pattern 20mm thick using 10mm thick and below gauge hbg stone (no sand to be added) and the surfaces rubbed smooth with current etc., complete complying with standard specification., wring with 2 x1.5 sqmm (22/0.3) pvc insulated sc unsheathed cu conductor of 1100v grade in suitable pvc rigid pipe concealed in wall and ceiling with pvc accessories in flush with wall with 3mm thick hylum sheet cover with tw switch box and 5a f.t switch with continous earth wire connection of 14 swg tc wire for making good of the concealed portion with