Get complete information related to latest Accelerator Switch Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Accelerator Switch Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Accelerator Switch Tenders.
Tender For complete assembly of fiat bogies with air spring in secondary suspension except sub-assemblies (pressing of traction lever, traction centre, roll link, control arm, anti roll bar fork and bracket assembly) for different variants of lhb division of icf
Tender For supply of one coach set of metal bonded rubber items for vb/ts coaches to m/s gmt drawing nos, 1) centre pivot bearing- to gmt drg.no. 41057501, rev-00 - 2 nos 2) stabilizer link- to gmt drg.no. 65087601, rev-01 - 4 nos 3) traction bar/metal rubber bush- to gmt drg.no. 65081502, rev-03 - 4 nos 4) lateral buffer- to gmt drg.no. 62093501, rev-01 - 4 nos 5) bump stop- to gmt drg.no. 62049602, rev-04 - 8 nos 6) axle guide bearing- to gmt drg.no. 64064102, rev-00 - 8 nos 7) spring pad- to gmt drg.no. 62093401, rev-00 - 8 nos 8) motor suspension bush/ spherical jointto gmt drg.no. 64064201, rev-04 - 4 nos 9) motor suspension pad- to gmt drg.no. 63052101, rev-03 - 4 nos. items are to be manufactured as per m/s ec engineering's rubber-metal elements specification no mt18br2 001468-03. special condition : suitable packing to be done to avoid damage during transit, there will be minor modification in design. firm may be advised to collect final drawing before manufacturing.
Tender For supply of push pull rod ( traction bar) for wap7/wag9 as per clw drawing. no. 1209.01.113.006, alt.6 or latest consisting of 3 items as follows:1. flange should be as per clw drawing no. 1209.01.113.007, alt-7 or latest. 2. tube welding as per clw drawing no.1209.01.313.008, alt-5 or latest. 3. traction bar (push pull rod) flange hole size should be as per rdso smi no- rdso/2006/el/0241 (rev 0) dated 24.10.06 or latest dpt & mpt testing to be done as per rdso letter no.el/3.1.35/12 dated 15.09.2017