Tender For implementation of mitigation measures (rock bolting, shortcreting and grouting) to prevent boulder fall and seepage in existing 8 nos. tunnels (tunnel no. 3, 4, 11, 14, 23, 25, 29 & 32) in kr line under traffic block conditions under the jurisdiction of assistant divisional engineer/lakshmipur road on koraput-rayagada line of waltair division.
Tender For supply of 2mp ir bullet camera , nvr 16ch with 1hdd slot , surveillance hard disk 8tb , 43 inch led monitor full hd , network switch poe 8 plus 2 sfp , sfp module , 6 core armored cable , hdpe pipe 25mm , pigtail duplex lclc , ofc junction box , pole for cctv with grouting , cat 6 outdoor cable , 9u rack , 4u outdoor rack , led flood light , ups 1 kva online with 2 battery , 2 core electric wire 2mm , installation
Tender For execution of repairing work like nozzle grouting concrete floor cutting and braking concrete slab cutting etc work for architectural and finishing work of santragachi station for south eastern railway in west bengal
Tender For strengthening by grouting to slab structures at rd 2475 m, 2645 m, 3735 m, 5100 m, 5415 m, 5715 m, hpc 6000, hpc 6435, sc 6907, sc8857, sc 9405, sc 9760 m, hpc 10290 m, vrb cr 13520 m, vrb cr 13660 m, vrb 17630 m, 22630 m, cr 23000 m ,super passage
Tender For repair to water leakages from the rising main (m.s. pipe) and valves on rising mains also repair to d.c.1 with concrete grouting of gogaon lis tah dist-gadchiroli
Tender For supply, fabrication and erection in position; bolted and/or welded structural steel works at all levels; including all built-up sections /compound sections made out of rolled sections and / or plates intrusses; rafters; purlins; wind ties; coloumns; portals; platforms; staircases; (excluding chequered plates, swing ladders, foundation bolts and gratings) ladders; stoppers; brackets sag rods; supports for equipment and accessories; hand railings posts cutting to required size as per approved drawings; straightening if required bolting/ welding of joints (including sealing the joints of the box sections with continuous welding wherever specified) finishing edges by grinding; fixing in line and level with temporary staging and removal of same after erection; grouting with ordinary grout or non-shrink grout as specified; including preparation of detailed fabrication drawings, cost of painting as specified below, complete in all respect as directed by engineer-in-charge.