Get complete information related to latest Additive Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Additive Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Additive Tenders.
Tender For corrigendum : expression of interest non-committal for conducting trial of coal additive combustion additive for minimization of unburnt loss of ignition in fly ash and bottom ash and slagging in boiler for 30 days
Tender For supply of ch version poly vinyl chloride hutch without flap outer dimention (600x400x32 0 mm), inner dimention (565x365x315 mm),(lxbxh).colour blue ,iso 9001:2008 certified. [ warra nty period: 30 months after the date of delivery ]
Tender For providing and fixing of 110 mm unplasticized poly vinyl chloride (upvc) pipe line (quality specification: schedule 40, isi mark, heavy duty, white colour) around 260 meter.
Tender For providing and fixing of 110 mm unplasticized poly vinyl chloride (upvc) pipe line (quality specification: schedule 40, isi mark, heavy duty, white colour) around 260 meter.
Tender For supply of flexible poly vinyl chloride (pvc) flooring sheets size:- 7000 mm x 1620 mm x 2 mm thick with pvc electrode 2 mm dia x 15000 mm long per set, to rdso's specn. no.r dso/2006/cg-12( rev-1) of august 2008 with 5 amendments last amendment slip no.5 of ma y 2019 & corrigendum no. 1 of june 2015. colour as per rdso's sample code no. ac flg-01 shelf life 24 months. [ warranty period: 84 months after the date of delivery ]
Tender For supply of flexible poly vinyl chloride (pvc) flooring, sheet of heterogeneous type in length of 14000 mm, width 1620 mm and thickness 2mm, colour, shade and pattern as per rdso approved sample no.nac flg-02 for non-ac coaches circulated vide rdso's letter no. mc/cb/flooring/cg-12 dated 21.01.16 along with 2 mm dia pvc electrode of same shade and length confirming to rdso specification no. rdso/2006/cg-12 (rev-01) of aug 08 with 4 amendments- :last amendment no.4 issued in august 2018 & corrigendum no. 1 of june 2015).