Tender For corrigendum : supply of fabrication and erection work e e - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bot
Tender For corrigendum : supply of internal and external cleaning work of both boilers , internal cleaning work of both air heaters , both boilers roof to bagasse elevator and boiler no 2 side wall and complete boiler house cleaning work , internal cleaning work of wet scrubber and chimney of both boilers , dismentling of both economizer taking its below on ground and cleaning with hydraulic testing and fitted at site
Tender For auction sale of feeder table motor,mill head stock,bagasse elevator gear box,air circuit breaker,primary gear box,primary gear box-gn 32 of power turbine ape
Tender For c.s. item on conversion and supply basis and forged steel item - c.s coupling having material as per is:1030 grade 280-520w for mill size 30"x60" as per drg. no. supply basis, conversion basis, machining charge, cast steel crown pinion having material is:2708 grade-iii-b for mill size 30"x 60" as per drg. kcp-mh-70 and texmaco mh-32supply basis, conversion basis, machining charge, c.s.trash plate having material as per is:1030 and grade-iii-b as per drg. kcp-mh-13-ii and texmaco mh-13-isupply basis, conversion basis, machining charge, teeth cutting/grooving of trash plate, as per drg., c.s.trash beam as per is-1030/is 2708 as per drg. kcp-mh-84-r and texmaco mh-36supply basis, conversion basis, machining charge, forge steel tail bar for taxmaco and kcp mill having material c-40/8 as per drg. mh- 6 & mh-56supply basis, conversion basis, forge steel pinion for transmission gear of taxmaco mill as per drg. no. mh 39,material en-24,tensile strength70-80 kg./sqcm, hardness 200-220 bhn, c.s.bearing housing for taxmaco mill as per drg no mh-17-b for side roller housing supply basis, conversion basis, c.s.bearing housing for k.c.p.mill as per drg no mh-79for side roller housing supply basis, conversion basis, c.s.bearing housing for k.c.p.mill as per drg no mh-31for top roller housingsupply basis, conversion basis, c.s.bearing housing for k.c.p.mill as per drg no mh-79 for bottom roller housingsupply basis, conversion basis, c.s.gear coupling for c/f machine as per drg.no.bh-14 (duly case hardness), c.s. pinion for cane unloader as per drg, cu- 16teeth-17, teeth -18, c.s.sprocket 2" pitch (both pilot bore)(i) no of teeth 18 , boss dia 3", (ii) no of teeth 36 , boss dia 6", c.s.sprocket for boiler rotary feeder pitch- 25.0 mm,no of teeth 21, od -180mm. p.b -25 mm, as per drg. blr-73/1, c.s.sprocket/gear for bagasse elevator (pilot bore) pitch 50.8 mm,no of teeth 50, od 842.70mm. pcd 808.7mm,teeth thickness 28mm, boss- 270x130 mm, as per drg. mh-75, cs sprocket (pilot bore) as per drg.blr-62 pitch 50.8 mm, no.of teeth-14 pcd 226.49mm, od 258.8mm, for bagasse elevator drive, static coller of 25 mm thick duly hard faced of 5 mm thick layer . total thick 30 mm after hard facing for taxmaco & kcp mill as per drawing no. mm 105(i) m.s. material, (ii) c.s.material, sprocket of inter carrier od 280 mm,no.of teeth 45.pitch 19.5 mm, c.s. sprocket (duplex) for inter carrier, as per drg. mh-72, teeth 12, od-302mm, pcd- 290mm, rd-242 mm, pitch-75mm, b1 100mm, b2 75mm, s.s. wear plate is 304 quality, as per drg. mh-60(i) length 435 mm x width 370 mm x thick 15 mm, (ii) length 385 mm x width 330 mm x thick 15 mm, c.s.tresh beam bracket as per sample /drg. mh-90 (texmaco), c.s.eccentric pin trash bar adjusting device as per drg. mh-133/2024-25, c.s. trash beam adjusting connecting rod for taxmaco mill, as per drg. mh- 297, c.s. bridge wheel for cane unloader as per drg. cu25 (1),, trolly wheel for cane unloader as per sample /drg. cu-26-ii, pinion gear set for cane unloader as per sample /drg, c.s. pinion (gear) for rbc cross carrier pitch 41 mm. teeth 25 , type of teeth in valute (spur) module 12.7 mm width 125 mm .od 343 mm, bore 2" dia as per drg. mh-200716, clutch shaft for mill. as per drg. mh-76 , en-8for taxmaco mill -sl.no.2, for kcp mill - sl.no.1, cs worm for crystilizer wheel od 290 mm, bore 81 mm.pitch 80 mm complete as per drg. mh-39-r, groving of c.s. trash plate as per drg., idler wheel gear for cane unloader., no of teeth 68, od-420 mm, module-6, pitch- 18.84 mm, pcd-408 mm, as per drg. no. cu-25 (i), pinion for cane unloader no. of teeth- 33, od-210 mm, pcd-198 mm, pitch- 20 mm, module-6 as per drg. no. cu-16-r, pinion for cane unloader no. of teeth- 18, od-200 mm, pitch- 35 mm, bore- 50 mm, width-115 mm, module-6, teeth depth-25 mm as per drg. no., break stand complete for cane unloader, size-10", cs sprocket of rbc, as per drg. blr 32/93, od- 646mm, pcd-573mm, rd-497mm, nos of teeth 12, pitch-150.00mm, chain sprocket for int
Tender For corrigendum : supply of internal and external cleaning work of both boilers , internal cleaning work of both air heaters , both boilers roof to bagasse elevator and boiler no 2 side wall and complete boiler house cleaning work , internal cleaning work of wet scrubber and chimney of both boilers , dismentling of both economizer taking its below on ground and cleaning with hydraulic testing and fitted at site
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f
Tender For supply of spares for bagasse elevator chain link - purchase of spares for bagasse elevator chain link note : 1) material required with material composition test certificate.