Get complete information related to latest Air Condition Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Condition Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Condition Spares Tenders.
Tender For bid to ras providing of custom bid for services - custom bid for services - hrm assisting in preventive maintenance-1.0 assisting in preventive maintenance in hrm mechanical , the following works are to be carried out through-out the contract period , 2) preventive maintenance jobs based on daily monitoring basis: , a) daily monitoring of all hydraulic pipelines and attending the leakage (fitting changing, damaged , "o" ring changing, pipeline crack welding, etc.). , b) dally monitoring of sm top housing servo valve stand to identify moog & servo valve block , seating 'o' ring damage to avoid oil leakage. , c) daily monitoring of sm equipment like side guide, pinch roll hydraulic cylinder, feed/table roll , rotation, non-rotating rolls for jamming / bearing damage, air leakage identification and arresting. d). daily monitoring of internal cooling valve system condition, removal of steam locking in pipeline , and damaged hose (water) changing. , 2) assisting in mill equipment downtime / delays: , during equipment downtime/delays in hrm mechanical area, proposed man power shall be utilized to restore the mill at the earliest possible time. they will also be utilized for carry out observation / inspection points noted during rolling time to ensure equipment availability. , 3) area jobs (re-heating furnace, roughing mill, steckel mill, down coiler) a) re-heating furnace jobs , 1) rhf charging/discharging gear box connecting drive shaft flange bolts checking/changing. 2) rhf charging/discharging door chain guide roll greasing & chain greasing. , 3) rhf charging/discharging arm gearbox oil level checking & coupling bolts checking. , 4) rhf charging/discharging arm liner bolts tightness checking & replacement. , 5) rhf zone valves (gas & air) servicing & greasing. , 6) any other jobs assigned by qa/ea. , b) roughing mill jobs , 1) rm approach roller table rolls, front and rear mill table rolls, gear coupling welding. , 2) rm edger lower & upper fixed beam fixations changing. , 3) rm edger upper and lower fixed beam worn out portions build up by welding & grinding. , 4) rm main drive spindle balancing guide block fixation checking. , 5) rm main screw down screw clutch spring tension adjusting, cleaning & lubrication. , 6) rm uj joint cover bolts & flange bolts checking & changing. , 7) rm work roll cooling nozzle flushing and changing. , 8) rm work roll wiper pad changing. , 9) cobble pusher arms alignment., 10) cobble pusher extended platform repair work like uprooted support beam, web welding in case of , break down along plate pushing. , 11) crop shear gap/overlap adjusting locks servicing. , 12) crop shear side guide line plate groove welding. , 13) crop shear side guide repositioning during t bar hitting. , 14) any other jobs assigned by oa/ea , c) steckel mill jobs , 1) sm dust removal apron position / welding , 2) sm entry & exit retractable roller table roll cooling pipe checking, damaged pipe changing, both , side vertical apron groove welding, coupling welding. , 3) sm entry/exit side guide cross spray damaged nozzle changing and damaged/uprooted nozzle , block changing/welding. , 4) sm entry/exit cross spray diaphragm valve servicing/changing. , 5) sm entry/exit deflector rolls bearing housing fixation tightening and shim addition. , 6) sm entry/exit flap and bottom plate assembly fixation tightening and elongated bolts changing. 7) sm guide synchronizing shaft fixations checking / changing. , 8) sm main drive shaft cooper bearing fixation tie rod fixation, gulding block bolts tightening , 9) sm pinch roll de-scaler roll to hydraulic cylinder lock checking and welding/changing. , 10) sm pinch roll split apron repositioning & base stool welding. , 11) sm roll cooling flushing by removing all nozzles from zone i & ii & fixing back. , 12) sm wobbler liner plate bolts, wobbler to uj bolts tightening and uj to drive spindle flange bolts , tightening.. , 13) sm work roll
Tender For supply of airconditioning spares applicable for beml make hemms working at ilbl ocp lkpa - ftg hastag6 male 90 deg, part no. rd569440p, as per specification document. , ftg hastag12 male 90 deg, part no. rd582630p, as per specification document. , ftg hastag8 straight splicer, part no. rd570570p, as per specification document. , ftg hastag10 straight splicer, part no. rd570580p, as per specification document. , compressor clutch, part no. rd512515op, as per specification document. , fillter air, part no. rd580760p, as per specification document. , expansion, part no. rd568680p, as per specification document. , filter, part no. rd562400p, as per specification document. , receiver drier, part no. rd570640p, as per specification document. , blower motor, part no. rd212063p, as per specification document. , expansion valve, part no. rd595130, as per specification document. , switch binary, part no. rd595770p, as per specification document. , receiver drier, part no. rd594190, as per specification document. , fan motor assembly, part no. rd590763p, as per specification document. , motor blower assy 24v, part no. rd585831p, as per specification document. , relay 24v, part no. rd566930, as per specification document. , switch - rocker black, part no. rd589670p, as per specification document. , filter - recirc, part no. rd590771p, as per specification document. , motor double blower, 24 v, part no. rd588380p, as per specification document. , filter foil framed, part no. rd3212640p, as per specification document. , core - combi htr-evap, part no. rd3213410, as per specification document. , fan _ motor assy-10 in dia 24 v, part no. rd587031, as per specification document. , coil-condenser, part no. rd476320, as per specification document. , reciver drier, part no. rd5109440p, as per specification document. , evaporator core assy, part no. rd213700p, as per specification document. , blower motor assly., part no. rd5129331p, as per specification document. , switch rotary 3spd 25amp, part no. rd5109340, as per specification document. , fan _ motor assy 24v, part no. rd586276p, as per specification document. , condenser, part no. rd453780p, as per specification document. , evaporator assembly, part no. rd234130p, as per specification document.
Tender For bid to ras supply of as per boq - aircondition system , two way oil filter wrench , 3 jaw universal oil filter , open spanner set taparia , wall drill bit 8mm
Tender For corrigendum : supply installation and commissioning of lab. equipment for mechanical engg dept - separating & throttling calorimeter with mini boilerfeatures: determining the vapour content usingo a separating calorimeter with cyclone water separatoro a throttling calorimeter with vapour depressurization using an h-s diagramspecifications:supplied vapour temperature: 240 c pressure: 10barsafety valve: 10barmeasuring ranges temperature: 0 400 c pressure (inlet): 0 16bar pressure (outlet): -150 100mbar230v, 50hz, 1 phase230v, 60hz, 1 phase120v, 60hz, 1 phasedimensions and weight: l x w x h: 800x 800 x 1700 mm weight (approx.): 110 kg, steam turbine power plant setupfeatures steam power plant and its components start-up, operation and shut down of a steam power plant closed steam-water circuit with feed water treatment among others, determining:o boiler efficiencyo mechanical/thermal efficiency of the turbineo condenser efficiencyo specific fuel consumption of the plantspecificationsteam generator steam output: 200kg/h at 11bar fuel consumption: 12l/h heat-up time: 8min pressure: 13barsuper heater power: 7kwsingle-stage axial turbine with curtis wheel and hydraulic speed regulator power: max. 1,5kw at 3000min-1water-cooled condenser cooling capacity: 98kw transfer surface: 2,5m2measuring ranges temperature: 9x 0 400 c, 2x 0 100 c flow rate: 0 167l/min (cooling water) pressure: 3x 0 16bar, 1x 1bar torque: 0 20nm speed: 0 4000min-1400v, 50hz, 3 phases400v, 60hz, 3 phases, 230v, 60hz, 3 phasesdimensions and weight l x w x h: 3500x 2500 x 2250 mmweight (approx.): 2250 kg, rotary air compressor test benchfeatures: to study all components/accessories used in rotary air compressor. to study & determine isentropic work, actual work volumetric efficiency, isentropic efficiency & free air delivery at different delivery pressure. to plot volumetric efficiency/isentropic efficiency against delivery pressure & comment on the nature of the plot.observations can be taken by air compressed in storage& free condition. instrumentation: sensors with digital displays software for data acquisition via usbspecifications: vane compressor rotary compressor, driven by 3 hp motor. calibrated orifice meter with water manometer to measure air intake. energy meter to measure input of the meter. pressure gauge to measure discharge pressure. control valve at delivery side. stop clock.dimensions and weight: l x w x h: 1500x 1500 x 1250 mmweight (approx.): 320kg, marcet boiler test apparatusfeatures: recording the vapour pressure curve of water presentation of the relationship between pressure and temperature in a closed system temperature and pressure measurementspecification:bourdon tube pressure gauge: -1 24bartemperature limiter: 200 csafety valve: 20barheater: 2kwboiler, stainless steel: 2lmeasuring ranges temperature: 0 200 c pressure: 0 20bar230v, 50hz, 1 phase230v, 60hz, 1 phase120v, 60hz, 1 phasedimensions and weight: l x w x h: 800x 600 x 600 mmweight (approx.): 45 kg, rope brake dynamometerpower 0.5 kwvoltage 220 vphase single phasefrequency 50 hzmaterial stainless steelwheel size 45 cm, cam analysis apparatus capacity 7. 5 hpphase 3 phasespeed 1500 rpmfrequency 50 hzmaterial stainless steel 304color blue, slip gauge set steel sets with high wear resistance.47 & nabl calibrationslip gauge set steel sets with high wear resistance. high level accuracy and reliability of measuring results are guaranteed by precise calibration. provided with nabl traceability if required. sets of m46, m87, m112. metric/imperial., bevel protectorblade length 150mm w/60, 40degree edges, required stand and type, sine bar range 200mm for checking concentricity, run out of sharpness taken & degree checking, digital outside micrometerspecification range 0-25mm, digital vernier caliperspecification range 0-150mm/6 , radius gaugeradius gauge 1-7mm, surface plate granite a grade 24 x 36 inch in a class granite, mechanical comparator analog type with dia
Tender For comprehensive annual maintenance contract of total 13nos. of split type ac and 2 units duct ac installed at control room, turbine floor and generator hall at lph and chief office, hospital and guest houses located at talakalale and kargal 577421, sagar talluk, shimoga dist,karnataka.the scope of contract shall be to keep the airconditioners in normal working condition. attending to all breakdown and preventive maintenance of acs at lph, talakalale, kargal office,ib & hospital without any delay.the contractor shall supply and install the parts found defective for satisfactory maintenance of acs without any delay during the contract period as per the schedule list of spares. the contractor shall note down the equipment & accessories that are in service in present system.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract.compressors shall be replaced only when the existing compressor is found irreparable.spares to be provided for maintaining continuity of work.the successful service provider has to maintain ready stock of requisite spares in good condition throughout the comprehensive annual maintenance contract period to facilitate immediate replacement of defective parts.preventive maintenance for airconditioners.preventive maintenance shall be provided at least once in 3 months during prime shift hours of coverage at no extra cost. the firm shall monitor the performance of the systems, monitoring and cleaning, topping up of refrigerant gas, greasing of moving and running equipment, cleaning of filters etc., and give a report to the executive engineer(o&m)lph division head, kpc ltd.,breakdown maintenance for airconditioners-the agency should attend to all the breakdown call promptly & immediately.however in extreme case, if the spares not available immediately, repair shall be carried out within 2 weeks. efforts shall be made to rectify the system within 2 weeks. during the contract period the firm shall supply and install all parts found defective for satisfactory maintenance of airconditioners at no extra cost. it is the responsibility of the firm to bring all components to working condition. any leakage of gas in the piping/system shall be attended by the agency. filling up of refrigerant gas is also included in the scope of work. all repairs/rewinding/services related to the airconditioning system, electrical circuits, stabilizers, compressors or motors and all the accessories connected to ac system etc., are covered under comprehensive annual maintenance contract. all the spares and compressors are under the responsibility of the firm during contract period.replacement of defective parts-the firm shall supply and install all parts found defective during the comprehensive annual maintenance contract period in respect of acs at their own cost. original spares and compressors shall be used during contract period. in case of suitable replacement not available for defective components of aircondition plant the firm shall undertake to provide a higher version components at no extra cost and the defective parts and components shall be handed over to kpcl.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract. compressors shall be replaced only when the existing compressor is found irreparable.
Tender For corrigendum : supply of airconditioning spares for hemms - refrigerant gas part no r134a , compressor oil 250ml sp15 part no rd571030p , hose 50 ft part no rd55006600p , hose 50 ft part no rd55008600p , hose 50 ft part no rd55010600p , 8 female 90 dig part no rd568400p , ftg 6 male 90 deg part no rd569440p , 10 male straight part no rd569510p , 8 female 90 dig charging put part no rd572250p , 10 female 90 dig charging port part no rd572310p , 90 female o ring part no rd576410p , 6 male straight part no rd578050p , compressor part no rd5107250p , receiver drier part no rd5111880p , hose part no rd55012600p , receiver drier part no rd594190 , fan motor assy 24 part no rd590763 , air filter part no rd3202490p , fillter air part no rd580760p , expansion valve part no rd595130 , motor blower assy 24v part no rd585831p , receiver drier part no rd570621p , relay 24v part no rd56693op , fan motor assy 24v part no rd586276p , switch binary part no rd595770p , thermostat part no rd5453124 , ftg 12 male straight part no rd569790p , expansion valve part no rd56868op
Tender For repairing of aircondition system of dumper sl. no. d-90021, cil no.11863, and d-90025,cil no. 11864, model bh-100 tonne at kathara colliery.
Tender For (a) repairing of aircondition system of dumper sl. no. d-90028, cil no. 11865 and d-90105, cil no. 12218, model bh-100 tonne at kathara colliery.
Tender For supply of clean room operation and maintenance - air handling units , chillers sixty tr , hot-water generators , chilled water pumps , hot water pumps , pan humidifiers , rotary dehumidifiers and packed aircondition , process chilled water with plate heat exchanger pumps tank , ro plant , scrubber with blower and acid tank , bms system with computer and user interface , fire alarm system with smoke and heat detectors , pa system , cctv system , interiors with 10000 sft of different isos , air showers , garment closet with hepa , access control , earth pits , wet stations , cda and nitrogen generator with two compressors , gas manifold with uhp piping , electricals with two panels for all hvac fire alarm system pa and cctv , packed airconditioners , all gas liner water piper and cda