Web Analytics Made Easy - StatCounter

Air Compressor Hiring Tenders

Get complete information related to latest Air Compressor Hiring Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Compressor Hiring Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Compressor Hiring Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :36277782 Due date: 21 Jun, 202421 Jun, 2024 NA
Tender For supply of supply, ict, fixed ops & fixed camc of 600 scmh emd online cng compressor for north & east regions , supply, ict and fixed ops & fixed camc of 600 scmh emd online cng compressor for south & west region , supply, ict and fixed ops & fixed camc of 600 scmh ged online cng compressor for north and east regn , supply, ict and fixed ops & fixed camc of 600 scmh ged online cng compressor for south and west regn

CTN :36212139 Due date: 12 Jun, 202412 Jun, 2024 NA
Tender For procurement of cng booster compressor (2 years arc) - 400 scmh electric motor driven cng booster compressors, design, engineering, manufacturing, supply (including packaging and forwarding, insurance, handling, loading and unloading at port and delivery & unloading at clients store / site of skid mounted 22 kw electric motor driven hydraulic cng compressor package of average 400 sm3 / hr capacity at suction pressure of 30 kg/cm2 and discharge pressure 255 kg/cm2 (variable suction pressure range 30 to 200 kg/cm2) the package shall be inclusive of: a) string test of complete compressor package with air/nitrogen along with electric motor and accessories at packagers factory. b) special tools & tackles (list and price of each tools and tackles to be furnished by the bidder separately in price bid) c) design, engineering, manufacturing, supply (including packaging and forwarding, insurance, handling and unloading at clients store /site of air compressor of capacity approx 1.5 kw, discharge pressure approx 7 kg/cm2g , min 100 water litre air receiver and air dryer along with all accessories and auxiliaries.location-wise (tentative) quantities:cachar, hailakandi & karimganj ga- 5 nos.kamrup & kamrup metropolitan ga- 11 nos.stores/sites: silchar and guwahati, unit inland transportation upto delivery location and other costs incidental to delivery of goods, installation, commissioning, testing (item no 2.0 of mr), installation, commissioning & field performance test of compressor package including air compressor system at site(item no 2.1 of mr), total amount for supply,freight,installation,testing & commissioning (inclusive of taxes) based on quoted price, services for operations (item no 3.0 of mr), operation charges for 1st year i.e. during warranty period for 2 nos shifts(each shift of 8hrs) for cachar, hailakandi & karimganj ga (5 machines x 12 months x 2 shifts = 120 machine shift months)note: the quoted rate for one machine shift month must be equal to or more than 0.50% of rate of item no. 1.1 quoted by the bidder., operation charges for 2nd year for 2nos shift (each shift of 8hrs) for cachar, hailakandi & karimganj ga (5 machines x 12 months x 2 shifts = 120 machine shift months)note: the quoted rate for one machine shift month must be equal to or more than 0.55% of rate of item no. 1.1 quoted by the bidder., operation charges for 3rd year for 2nos shift (each shift of 8hrs) for cachar, hailakandi & karimganj ga (5 machines x 12 months x 2 shifts = 120 machine shift months)note: the quoted rate for one machine shift month must be equal to or more than 0.61% of rate of item no. 1.1 quoted by the bidder., operation charges for 4thyear for 2nos shift (each shift of 8hrs)for cachar, hailakandi & karimganj ga (5 machines x 12 months x 2 shifts = 120 machine shift months)note: the quoted rate for one machine shift month must be equal to or more than 0.67% of rate of item no. 1.1 quoted by the bidder., operation charges for 1st year i.e. during warranty period for 2 nos shifts(each shift of 8hrs) for kamrup & kamrup metropolitan ga (11 machines x 12 months x 2 shifts = 264 machine shift months)note: the quoted rate for one machine shift month must be equal to or more than 0.50% of rate of item no. 1.1 quoted by the bidder., operation charges for 2nd year for 2 nos shift (each shift of 8hrs)for kamrup & kamrup metropolitan ga (11 machines x 12 months x 2 shifts = 264 machine shift months)note: the quoted rate for one machine shift month must be equal to or more than 0.55% of rate of item no. 1.1 quoted by the bidder., operation charges for 3rd year for 2nos shift (each shift of 8hrs) for kamrup & kamrup metropolitan ga (11 machines x 12 months x 2 shifts = 264 machine shift months)note: the quoted rate for one machine shift month must be equal to or more than 0.61% of rate of item no. 1.1 quoted by the bidder., operation charges for 4thyear for 2nos shift (each shift of 8hrs) for kam

CTN :36198613 Due date: 06 Jun, 202406 Jun, 2024 NA
Tender For supply of hpcl booster compressor wb rj bh jh - schedule 1 wb ga design engineering manufacturing inspection testing supply of flp motor driven hydraulic variable suction cng booster compressor with avg flow capacity of 400 scmh , schedule 1 wb ga lcv unloading post with coriolis mass flow meter 4inch dial size pressure gauge , schedule 1 wb ga installation and commissioning at site along with field performance acceptance test , schedule 1 wb ga operation charges for 1st year ie during warranty period , schedule 1 wb ga operation charges for 2nd year ie after warranty period , schedule 1 wb ga comprehenesive maintenance charges for 1st year after completion of warranty period , schedule 1 wb ga comprehensive maintenance charges for 2nd year ie after completion of 1st year post warranty , schedule 1 wb ga comprehensive maintenance charges for 3rd year ie after the completion of 2nd year post warranty , schedule 1 wb ga comprehensive maintenance charges for 4th year ie after the completion of 3rd year post warranty , schedule 2 rj ga design engineering manufacturing inspection testing supply of flp motor driven hydraulic variable suction cng booster compressor with avg flow capacity of 400 scmh , schedule 2 rj ga lcv unloading post with coriolis mass flow meter 4inch dial size pressure gauge , schedule 2 rj ga installation and commissioning at site along with field performance acceptance test , schedule 2 rj ga operation charges for 1st year ie during warranty period , schedule 2 rj ga operation charges for 2nd year ie after warranty period , schedule 2 rj ga comprehenesive maintenance charges for 1st year after completion of warranty period , schedule 2 rj ga comprehensive maintenance charges for 2nd year ie after completion of 1st year post warranty , schedule 2 rj ga comprehensive maintenance charges for 3rd year ie after the completion of 2nd year post warranty , schedule 2 rj ga comprehensive maintenance charges for 4th year ie after the completion of 3rd year post warranty , schedule 3 bh jh ga design engineering manufacturing inspection testing supply of flp motor driven hydraulic variable suction cng booster compressor with avg flow capacity of 400 scmh , schedule 3 bh jh ga lcv unloading post with coriolis mass flow meter 4inch dial size pressure gauge , schedule 3 bh jh ga installation and commissioning at site along with field performance acceptance test , schedule 3 bh jh ga operation charges for 1st year ie during warranty period , schedule 3 bh jh ga operation charges for 2nd year ie after warranty period , schedule 3 bh jh ga comprehenesive maintenance charges for 1st year after completion of warranty period , schedule 3 bh jh ga comprehensive maintenance charges for 2nd year ie after completion of 1st year post warranty , schedule 3 bh jh ga comprehensive maintenance charges for 3rd year ie after the completion of 2nd year post warranty , schedule 3 bh jh ga comprehensive maintenance charges for 4th year ie after the completion of 3rd year post warranty
 Loading, Please wait...

Connect us via What's Up