Web Analytics Made Easy - StatCounter

Air Motor Spares Tenders

Get complete information related to latest Air Motor Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Air Motor Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Air Motor Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :39010788 Due date: 10 Feb, 202510 Feb, 2025 6.12 Crore
Tender For procurement of nemf kits for main engines sparesof wjfacs - paper pack centrifugal spinner filter, gasket, fuel filter, gasket kit (8690920032), filter element, oil filter (element), sealing ring, gasket kit, gasket, insert (crank case breather), diaphgarm, carbon scrapper ring, air filter, cylinder liner set b11, sealing ring 150x7.3, gasket, piston, oil control ring st w6, conrod bearing size 0-0, taper facecomp.ring, top compr.ring st w6, con.rod brg.upper half, con.rod brg.lower half 0-0, valve spring, tube injector, bushing, push rod, turbine wheel, comp.wheel zr 195, flap, pressure hose, wiring harness for on-engine sensor, shaft wtr pmp hi temp clg circuit, coolant pump shaft, pressure sensor, impeller for sea water pump, volute, hp pump, fuel delivery pump, vent plug, hand pump, diaphragm, gasket, ball 16mm, gasket, repair kit, screw, nut, ring snap, bolt m20 1.50x103.0 lg 18 conrod, control block, tube asm cyl head fuel return, pressure sensor, pressure sensor +/- 70m bar, pressure sensor 15 bar, pressure sensor 10bar, pressure monitor 2.2 bar, pressure sensor, speed sensor br4000 nw, speed sensor, belt engine driven bilge pump, speed transmitter dm52, cable, temperature sensor pt100/110mm, microswitch, pressure sensor 6 bar(sw), coolant level sensor, conrod bearing stage 0-0 a, tube floating 84i turbo/cse, plug-in pipe, insert, bearing bushing, bolt cylinder head, connector 20/16, tube fuel monitor hp pump a-bank(lb)sply, plug-in pipe, tube fuel monitor hp pump b-bank(rb)sply, valve sequential turbo exhaust, intercooler cooler charge air a-bank lb, intercooler right, stop, spring torsion, bush, pin spring, diverter valve, 4/2-way valve, nozzle lube oil spray, impeller, sea water pump, impeller, thermocouple, damper element, pressure sensor, temperature sensor pt1000, pressure sensor, washer a cop, washer a, piston, tube vent b-bank top block, tube deaeration 90 d eg, tube vent a-bank top block, tube vent b-bank fro nt, tube vent a-bank fro nt, tube vent deaeration block to tee, tube a-bank to deaeration junc block, tube b-bank 151.91 to deaeration junc, tube vent b-bank car rier hsg (deaeration), tube vent a-bank carrier hsg deaeration, tube vent a-bank rear to carrier hsg, tube vent a-bank frt to deaeration blk, tube vent to rear deaeration block, tube vent a-bank to rear deaeration blk 1, tube vent a-bank frt to deaeration blk 2, pipe elbow, tube dual passage charged air cooler, plug, hp line, compensating ring, locking ring, actuating cylinder, plate, plate, plate, cylinder head complete, camshaft, union, oil line 12-16v4000 set w6, oil line 12-16v4000 set w6, air starter motor of main engine, repair kit, spacer sleeve, silencer, fuel line, centrifugal oil fl tr, oil return line (5551802628), flange, fuel filter, valve spring outer, conrod bearing stage 0-0 b, screw, level monitor, woodruff key, cover for set w6

CTN :39010792 Due date: 10 Feb, 202510 Feb, 2025 6.53 Crore
Tender For procurement of nemf kits for main engines sparesof wjfacs - paper pack centrifugal spinner filter, gasket, fuel filter, gasket kit (8690920032), filter element, oil filter (element), sealing ring, gasket kit, gasket, insert (crank case breather), diaphgarm, carbon scrapper ring, air filter, cylinder liner set b11, sealing ring 150x7.3, gasket, piston, oil control ring st w6, conrod bearing size 0-0, taper facecomp.ring, top compr.ring st w6, con.rod brg.upper half, con.rod brg.lower half 0-0, valve spring, tube injector, bushing, push rod, turbine wheel, comp.wheel zr 195, flap, pressure hose, wiring harness for on-engine sensor, shaft wtr pmp hi temp clg circuit, coolant pump shaft, pressure sensor, impeller for sea water pump, volute, hp pump, fuel delivery pump, vent plug, hand pump, diaphragm, gasket, ball 16mm, gasket, repair kit, screw, nut, ring snap, bolt m20 1.50x103.0 lg 18 conrod, control block, tube asm cyl head fuel return, pressure sensor, pressure sensor +/- 70m bar, pressure sensor 15 bar, pressure sensor 10bar, pressure monitor 2.2 bar, pressure sensor, speed sensor br4000 nw, speed sensor, belt engine driven bilge pump, speed transmitter dm52, cable, temperature sensor pt100/110mm, microswitch, pressure sensor 6 bar(sw), coolant level sensor, conrod bearing stage 0-0 a, tube floating 84i turbo/cse, plug-in pipe, insert, bearing bushing, bolt cylinder head, connector 20/16, tube fuel monitor hp pump a-bank(lb)sply, plug-in pipe, tube fuel monitor hp pump b-bank(rb)sply, valve sequential turbo exhaust, intercooler cooler charge air a-bank lb, intercooler right, stop, spring torsion, bush, pin spring, diverter valve, 4/2-way valve, nozzle lube oil spray, impeller, sea water pump, impeller, thermocouple, damper element, pressure sensor, temperature sensor pt1000, pressure sensor, washer a cop, washer a, piston, tube vent b-bank top block, tube deaeration 90 d eg, tube vent a-bank top block, tube vent b-bank fro nt, tube vent a-bank fro nt, tube vent deaeration block to tee, tube a-bank to deaeration junc block, tube b-bank 151.91 to deaeration junc, tube vent b-bank car rier hsg (deaeration), tube vent a-bank carrier hsg deaeration, tube vent a-bank rear to carrier hsg, tube vent a-bank frt to deaeration blk, tube vent to rear deaeration block, tube vent a-bank to rear deaeration blk 1, tube vent a-bank frt to deaeration blk 2, pipe elbow, tube dual passage charged air cooler, plug, hp line, compensating ring, locking ring, actuating cylinder, plate, plate, plate, cylinder head complete, camshaft, union, oil line 12-16v4000 set w6, oil line 12-16v4000 set w6, air starter motor of main engine, repair kit, spacer sleeve, silencer, fuel line, centrifugal oil fl tr, oil return line (5551802628), flange, fuel filter, valve spring outer, conrod bearing stage 0-0 b, screw, level monitor, woodruff key, cover for set w6 - quantity - 6081 | msme exemption - yes | startup exemption - no

State Government

CTN :38373215 Due date: 05 Feb, 202505 Feb, 2025 1.09 Lacs
Tender For corrigendum : scope of workscope of work: - (at firms workshop):-1. dismantling of pump and internal checking of pump to analyse the defects.2. checking of impeller, cleaning of impeller and other internal parts.3. checking of stator and rotor can, replacement of ss seamless cans.4. proper fitting of impeller and balancing of impeller.5. checking of stator and rotor windings, rewinding of the same as per requirement.6. checking of bearing, voltage coils, rewinding of coils with class #h# insulation.7. replacement of defective internal parts, components, such as bearings, sleeves, washers, etc.8. testing of motor pump and painting of the body.9. successful trial of pump.10. material & service guarantee shall be applicable for 12 months from the o/h of pump.11. rewound stator shall be tested for winding resistance and compared with original.12. winding resistance of individual phase should not have more than 2% deviation to other phases.13. ir value of motor shall be recorded, before and after completion. complete test report with type of instrument used to be submitted at the time of handing over of the motor.14. motor assembly should be carried out by contractor so that no any damage to overhang portion of winding happen otherwise contractor shall be responsible and will have to repair again.terms and conditions: -1. all man power, t&p, consumables etc. shall be arranged by the firm.2. the firm have to make his own arrangement for transportation of defective pumps from the site to firm's workshop. similarly, the repaired pumps shall be delivered to our site.3. completion period: 5 days for to and fro transportation and 10 days for repairing work. total 15 days.4. payment term: 100 % payment shall be made within 45 days after completion of work satisfactorily on actual work done basis.5. contractual period: 18 months.6. the firm shall submit the gst invoice for payment of service through ra bill. however, release of bills of work as well as supply, the repaired / serviced pumps shall be run on trial for at least 01 hours continuously.7. penalty: penalty will be imposed @rs.1000/-per day or part thereof due to delay in work but limit to 10 % of order value if delay in completing the work.8. in the case of work at site/ plant premises.9. all safety precautions & safety rules shall be followed by the contractor, also necessary safety appliances like gloves, masks, helmet, shoes etc. shall be available to their labour during execution of work.10. if any labour of contractor meets with an accident because of not using the safety appliances, in such cases, if any fine/penalty is imposed on the occupier/factory manager of the power station, than the payment of amount of such fine/penalty or all legal compliance shall be meet out by the contractor.se (turbine)1x500 mw, cspgcl, kwb
 Loading, Please wait...

Connect us via What's Up