Tender For supply of bill of quanitities d d - nozzle waterfall stainless steel corrosion resistant , 10 hp motor 7.5 kw copper winding speed 1440 to 1500 rpm , floor lights led in group fixtures 12 to 18w waterproof ip67 to ip68 , focus light big high intensity outdoor led flood light , tiles for wall ramp pool thickness 8 to 10 mm water absorption anti skid tiles , landscaping , evolution of crest custom designed architectural , elephant logo decorative sculpture frp stone , brass letter solid brass letters thickness 1.5 to 3 mm height 6 to 12 inches , electrical fixtures and circuit work , plumbering fixtures and fitting wok
Tender For corrigendum : work of replacement of bus ring and connector assembly for attending the high temperature problem of generator stator phase & neutral leads and complete testing of stator rotor winding of 75 mw ukai hps unit no. 2.(wt-5069 emd-hps)
Tender For 1. "small repairs/servicing/ cleaning/ overhauling of 10 nos. traction alternators (m/s medha make) of 1600 hp demu power car of mechanical workshop, izatnagar for the period of 02 years (as per scope of work)". 2. re-winding /rehabilitation and basic overhauling of 01 no. traction motor (m/s cgl make, type-1016) of 1600 hp demu power car of mechanical workshop, izatnagar for a work period of 02 month (as per scope of work)
Tender For repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; filtration of mot lube oil of total capacity 40 kl by using clean oil filtration trolley of minimum 200 lpm capacity at raps 6 for detail refer boq item.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; inspection of raps 6 turbine in minor overhauling turbine of ukrainian energy machine ukraine bearings turbine blades governing system equipment oil flu.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; dismantling and assembly of generator ukrainian energy machines in raps 6 for detail refer boq item no 3 in scope of work and 1 bid lumpsum qty is equ.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; miscellaneous jobs like mot or tot cleaning seal oil lube oil gasket lld line diaphragm replacement etc in raps 6 minor overhauling for detail refer bo.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; deployment of oem experts for stage inspection in minor bsd at raps 6 covering turbine generator and governing system jobs for detail refer boq item no.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; generator rotor thread out in decoupling alignment and coupling in raps 6 minor overhauling for detail refer boq item no 6 in scope of work and 1 bid l.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; deployment of vibration or balancing experts at raps 6 minor overhauling before shutdown for detail refer boq item no 7 in scope of work and 1 bid lum.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; deployment of vibration or balancing experts at raps 6 minor overhauling during startup for detail refer boq item no 8 in scope of work and 1 bid lump.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; in situ dynamic balancing of tg in raps 6 major and minor bsd for detail refer boq item no 9 in scope of work and 1 bid lumpsum qty is equal to 1lumps.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - rr site 5 and 6; rectification of leak if any anomaly found during hydro test of stator winding for detail refer boq item no 10 in scope of work and 1 bid lumpsum qty i.
Tender For supply of repair of vechile switf dzire - overhauling of suspension system of vehicle including lathe work , dismantling old oil filter fuel filter , dismantling and repair self armature incl winding , supply and fixing following spare parts , complete replacement of foot mating of the vehicle , after completion of all above said maint work road testing of vehicle