Tender For supply of drone components : : - sm pc all in one 21.5 inch i5 12 gen , remote controller all in one rc simulator usb , ups 1 kva , fpv free rider game licensed fpv drone simulator software. , hdmi cable 5 mtr , extension bd 5-6 outlet , basic fpv training drone , fpv googles 5 inch display , rc for pfv drones 16 ers , propeller set 5 5 inch hq prop 5 x 3.5 inch , drone obstacles one set , drone fabrication kit , drone repairing and soldering kit , pid tuning stand , laptop for fpv i5 , fpv battery 22.2 v , cordless drill machine , battery charger , rechargeable cell 3.7aa , cell charger , connector wire accessories
Tender For supply of electricla spares and supplies - 3.7 kw motor rewinding, 4-way jb installation with support — 400w light for planning &, store area, led lights 400w installation with support — planning & store, area and other locaiton as advised, 4c × 4 sq.mm cable laying — mcc to commercial shed, loading/unloading boom-a lcs, conveyor boom-a motor,, bypass conveyor boom-a motor, bypass conveyor boom-b, motor, conveyor boom-b motor and other locaiton as advised, 3c × 2.5 sq.mm cable laying — mcc to commercial shed:, conveyor boom-a lcs, bypass conveyor boom-a lcs, loading &, unloading boom-b lcs, conveyor boom-b lcs, bypass conveyor, boom-b lcs and other locaiton as advised, 75 × 50 mm cable tray angle & support — commercial shed, loading & unloading boom, 4c × 16 sq.mm al cable laying — storage shed du new motor, and other locaiton as advised, 4c × 1.5 sq.mm cable laying — filling shed du new lcs, mcc for, new purging unit, valve changing shed to mcc for new valve, changing machine lcs, dpt shed to mcc for new valve, changing machine lcs, 4c × 2.5 sq.mm cable laying — mcc to 24-head carousel, earthing relay, mcc room to 48-head carousel earthing , to 12-, head carousel earthing, 2c × 1.5 sq.mm cable laying — lpg pump house jb to lcs &, instrument for lpg pump, 12p × 1.5 sq.mm cable laying — lpg pump house jb to jb, instrument for lpg pump, 4c × 4 sq.mm cable laying — lpg pump house to mcc for lpg, pump lcs, 4c × 4 sq.mm cable laying — filling shed to mcc for conveyor, dus, earth pit installation — commercial shed (earth digging, gi pipe, fitting, chamber making, gi busbar, chequer plate frame &, chequer plate), earthing strip laying 50 × 6 mm — commercial shed earth pit to, 47.5 kg filling scale, platform structure — dismantle, filling shed near 24-head, carousel, weight scale unit stand & base frame fabrication & installation, — commercial shed, 4c × 16 sq.mm cable laying — valve changing shed to mcc for, new valve changing machine motor, dpt shed to mcc for new, valve changing machine motor, storage shed to mcc for new, du motor, lpg pump house telephone shifting & cable laying, cable tray 75 × 50 mm laying with angle support — commercial, shed, valve changing shed, storage shed, ms plate 1500 mm × 1500 mm × 6 mm modification &, installation — commercial shed hydraulic jack, lightning arrestor height extension for lps (tt gantry rooftop /, filling shed top), new lightning arrestor installation for lps (filling shed &, commercial shed top), earthing strip dismantling & shifting 50 × 6 mm for earthing grid, msv area / lpg pump house manifold & msv manifold /, planning room / storage shed), earthing strip installation 25 × 3 mm for pipe-end flange (receipt, station fencing — all areas / tt parking area fencing / pump, house manifold & msv manifold), hydrant monitor height extension — dismantling and, installation, pipe cutting and welding with flange (tt parking, area / commercial shed loading and unloading), hydrant monitor structure and platform with railing shifting,, fabrication and installation (tt parking area), hydrant monitor railing fabrication and installation (near, counting platform / near lpg pump house / msv area), gi fencing fabrication and installation (3 m × 2 m) — near, counting platform, earthing strip laying with clamp & fabrication 25 × 3 mm (lpg, pump house shed roof to bottom and other locaiton as advised), water pipe 1" line installation with fitting (commercial shed, composite cylinder area), ovcm vent pipe 1" line modification with flange joint (filling, shed), sprinkler pipe 2" line cleaning & modification with flange joint, (msv top area), commercial shed evacuation — vent pipe 1" line modification &, installation with flange joint, conveyor and gi pipe dismantling work — length 45 mtr., (commercial shed valve changing shed connecting platform), platform installation for valve opening of cylinder (filling shed), stand fabrication &
Tender For supply of construction of new earthpit,repair and revamp works of earth pits,supply and fabrication of frp earthpit cover plates,supply and laying of gi strip 50mmx6mm,supply of no.8 swg solid earthwire,fire proof partition,bird net,increasing the height of dg exhaust pipe,painting of 2 pole structure,supply and installation of breaker housing,supply of zinc anode,repairing of manual call point at sv station,repairing and installation of existing of old electrical pole,repairing of flp light fixtures,supply of flp hooter for acoustic telephone booth,40 watt led square light,sply instln of led light rating 20 w,sply erec of street light minimum 50 w,led,floodlight,60w,ip 65,led,flood light,120w,sply and fixg of light fixture tube,40w,sup of lgts 50 w,silica gel sply 1 kg eachkg,cork rbr,supply of bearing,supply of bearing,supply of bearing,supply of bearing,supply of bearing,supply of bearing,supply of tire for company vehicle,supply and installation of wiper machine
Tender For corrigendum : fabrication & supply of icf axle end cap for press machine in forged steel ms as per drawingno. mibw-20-0625- 001.,material en 24 case hardended to 36 hrc. one set consists of 02 end cap (item no 1 of mibw-20-0625-001) and 06 allen bolt ( item no 2 of mibw-20- 0625-001. [ warranty period: 30 months after the date of delivery ]
Tender For fabrication & supply of icf axle end cap for press machine in forged steel ms as per drawingno. mibw-20-0625- 001.,material en 24 case hardended to 36 hrc. one set consists of 02 end cap (item no 1 of mibw-20-0625-001) and 06 allen bolt ( item no 2 of mibw-20- 0625-001. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : fabrication work d d - places , replacing wornout runner base and installing a new runner base of cane carrier and baggage elevator and r b c , replacing wornout runner with new one of cane carrier and baggage elevator and r b c , removing wornout angle iron and t iron of the cane carrier and reinstalling it by straightening the crooked part , removing the wornout part of the suit from different places and fitting it with new one , chevron grooving of new rollers of the mill , chevron grooving of old rollers of the mill , remove the wornout partition plates of the juice box above and below the juice heater by 10 or 12 mm ms plate and install it , installing ribs at the top and bottom partitions of the juice heater , repairing save all of qurdbody , removing old wornout gutters installed at various places and installing it with new gutters , remove the old wornout save all from pan and quard and install it with new one , reinstalling the new umbrella fitted inside the pan by making a new one and removing the old one , replacement ribbon arm of the mascute receiving crystallizer , making new separator of a centrifugal machine , removing the wornout truff of the hopper and installing it with new one , making and installing new separators for continuous centrifugal machines , removing the tubes of quad juice heater and dynamic juice heater and expanding them by installing new tubes and giving their hydraulic testing satisfactory of size 42 mm , removing the tubes of pan installing new tubes and expanding them and giving hydraulic tesing with satisfactory trial of size 96 mm , removing the wornout flue gas ducting of both the boilers and installing it with newone making from new or old plates , removing the wornout front and roof plate at boiler number 1 and 2 and installing with a new plate , removing the damaged boiler damper and installing a new one , making bagasse suit and installing. , replacement of juice over flow box of clarifier , making and installing bed of motor and pumps at various places as per requirement , replacement 6 inch dia cooling pipe of sulfur furnace , removing the monitor casing of a machine from old machine and installing it and giving its a trial , making amd replacing manholes at various places , making and replacing the enternals of cather of the pan. , making and replacing the new hood of cane cutter , removing the old bottom plate of the lowest compartment of the clarifier and placing a new plate on it after placing an angle trap as per the instructions and giving a satisfactory water trial , reinstalling the stirrer of the clarifier and giving a satisfactory trial , removing the shaft of a pug mill and replacing the old bushes on both sides and fitting new ones , removing and refitting the shaft of a brown sugar magma mixer and installing with new bush , reinstalling the trufff of connecting rod of the hopper , making and installing new catcher strainer , removing the old rail line of the trolley of the unloader and fitting the new rail line satisfactorily and doing water level , reinstalling the old rail line of the unloader s bridge and fitting it and checking water level etc , removal of old and weak channels of 3 inches to 10 inches diameter installed at various places and installation of new ones as per requirement , cutting and straightening old plates installed at various places as per requirement , removal of old and wornout scrubber installed on sulfur furnace and making and replacing with 8 or 10 mm plate and making all the connections , removing the trufff plate including support corroded shell and top cover plate of the top chamber of the clarifier and fitting the new plate and giving it s a water proof trial , re-installation alignment and //bid details 2 / 47 trial of hopper driving end , making and installing the top cover of the centrifugal machine , making an arm and installing it on the shaft of pug mill , making and installing scrubber and bottle jackets of sulfur f
Tender For additive manufacturing or 3d printing machine based on continuous fiber reinforcement printing technology combined with continuous filament fabrication technology