Tender For supply of new flow computer field mounted orifice meter type , supply of hmi system for metering for configuration of minimum 300ios , supply of power supply module , supply of flow computer accessories-pnumatice items , supply and laying of power supply cable , supply and laying communication au cable , installation and commissionning of flow computer
Tender For supply, installation, testing and commissioning of 5 kwp 3 phase on grid solar power panel with net metering system each at tura head post office under meghalaya division.
Tender For supply installation testing and commissioning of rooftoop solar ongrid hybrid net metering 5kw power plant system under chhatna 1 gram panchayet office under chhatna panchayet samity under bakura fund 5th sfc
Tender For corrigendum : supply, installation and commissioning of 114 nos. of water injection metering system and wiring up to rtu at unmanned platform of mh asset
Tender For supply of liquid metering system mass flow meters - supply price for mr item sl. no. 1.0001 , supply of mandatory spares for mr item sl. no. 1.0001 , freight charges for mr item sl. no. 1.0001 and sl. no. 4.0001 , supply price for mr item sl. no. 1.0002 , supply of mandatory spares for mr item sl. no. 1.0002 , freight charges for mr item sl. no. 1.0002 and sl. no. 4.0002 , supervision charges for group i , training charges for group i , post warranty maintenance contract charges for 3 years for group i , supply price for mr item sl. no. 1.0003 , supply of mandatory spares for mr item sl. no. 1.0003 , freight charges for mr item sl. no. 1.0003 and sl. no. 4.0003 , supply price for mr item sl. no. 1.0004 , supply of mandatory spares for mr item sl. no. 1.0004 , freight charges for mr item sl. no. 1.0004 and sl. no. 4.0004 , supply price for mr item sl. no. 1.0005 , supply of mandatory spares for mr item sl. no. 1.0005 , freight charges for mr item sl. no. 1.0001 and sl. no. 4.0005 , supply price for mr item sl. no. 1.0006 , supply of mandatory spares for mr item sl. no. 1.0006 , freight charges for mr item sl. no. 1.0001 and sl. no. 4.0006 , supervision charges for group ii , training charges for group ii , post warranty maintenance contract charges for 3 years for group ii
Tender For the metering panels needs replacement and panel room need to be relocated to an easily accessible location.a new electrical cable from transformer to the new panels need to be laid and new earthing system to be installed.