Get complete information related to latest Autoclaves Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Autoclaves Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Autoclaves Tenders.
Tender For bid to ras providing of custom bid for services - custom bid for services - hrm assisting in preventive maintenance-1.0 assisting in preventive maintenance in hrm mechanical , the following works are to be carried out through-out the contract period , 2) preventive maintenance jobs based on daily monitoring basis: , a) daily monitoring of all hydraulic pipelines and attending the leakage (fitting changing, damaged , "o" ring changing, pipeline crack welding, etc.). , b) dally monitoring of sm top housing servo valve stand to identify moog & servo valve block , seating 'o' ring damage to avoid oil leakage. , c) daily monitoring of sm equipment like side guide, pinch roll hydraulic cylinder, feed/table roll , rotation, non-rotating rolls for jamming / bearing damage, air leakage identification and arresting. d). daily monitoring of internal cooling valve system condition, removal of steam locking in pipeline , and damaged hose (water) changing. , 2) assisting in mill equipment downtime / delays: , during equipment downtime/delays in hrm mechanical area, proposed man power shall be utilized to restore the mill at the earliest possible time. they will also be utilized for carry out observation / inspection points noted during rolling time to ensure equipment availability. , 3) area jobs (re-heating furnace, roughing mill, steckel mill, down coiler) a) re-heating furnace jobs , 1) rhf charging/discharging gear box connecting drive shaft flange bolts checking/changing. 2) rhf charging/discharging door chain guide roll greasing & chain greasing. , 3) rhf charging/discharging arm gearbox oil level checking & coupling bolts checking. , 4) rhf charging/discharging arm liner bolts tightness checking & replacement. , 5) rhf zone valves (gas & air) servicing & greasing. , 6) any other jobs assigned by qa/ea. , b) roughing mill jobs , 1) rm approach roller table rolls, front and rear mill table rolls, gear coupling welding. , 2) rm edger lower & upper fixed beam fixations changing. , 3) rm edger upper and lower fixed beam worn out portions build up by welding & grinding. , 4) rm main drive spindle balancing guide block fixation checking. , 5) rm main screw down screw clutch spring tension adjusting, cleaning & lubrication. , 6) rm uj joint cover bolts & flange bolts checking & changing. , 7) rm work roll cooling nozzle flushing and changing. , 8) rm work roll wiper pad changing. , 9) cobble pusher arms alignment., 10) cobble pusher extended platform repair work like uprooted support beam, web welding in case of , break down along plate pushing. , 11) crop shear gap/overlap adjusting locks servicing. , 12) crop shear side guide line plate groove welding. , 13) crop shear side guide repositioning during t bar hitting. , 14) any other jobs assigned by oa/ea , c) steckel mill jobs , 1) sm dust removal apron position / welding , 2) sm entry & exit retractable roller table roll cooling pipe checking, damaged pipe changing, both , side vertical apron groove welding, coupling welding. , 3) sm entry/exit side guide cross spray damaged nozzle changing and damaged/uprooted nozzle , block changing/welding. , 4) sm entry/exit cross spray diaphragm valve servicing/changing. , 5) sm entry/exit deflector rolls bearing housing fixation tightening and shim addition. , 6) sm entry/exit flap and bottom plate assembly fixation tightening and elongated bolts changing. 7) sm guide synchronizing shaft fixations checking / changing. , 8) sm main drive shaft cooper bearing fixation tie rod fixation, gulding block bolts tightening , 9) sm pinch roll de-scaler roll to hydraulic cylinder lock checking and welding/changing. , 10) sm pinch roll split apron repositioning & base stool welding. , 11) sm roll cooling flushing by removing all nozzles from zone i & ii & fixing back. , 12) sm wobbler liner plate bolts, wobbler to uj bolts tightening and uj to drive spindle flange bolts , tightening.. , 13) sm work roll
Tender For corrigendum : tender for supply of belt pulley , auxiliary contactor , thermal relay 2 , 5/4a , raw plate , cip 40 400w/230v/50hz/65deg) , delay relay , friction block , contact no+nc , suction strainer , delay relay , delay relay , distance ring , contactor 3rt2028-1al20 , fan , distance sheet , jp5 pump - repairing kit , contactor 32a 48vac 50/60 hz , contactor 50a 48vac 50/60 hz , auxiliary contactor , field gasket , pneumatic 3-way valve , dn 25 , distance ring , contact nc , heating system , rectangular ring , field gasket , contactor (3rt2027-1al20) 230vac , o-ring , level ring 79 mm , temperature transmitter , temperature switch , pressure relief valve , socket 19.05 mm (3/4inch) , o-ring , packing , o ring seal , gasket , seal ring 444202330 , o ring , gasket , o ring , relay overload 6.0 to 9.3a , seal ring , spring , wear gasket , o ring , buffer , bearing w/o bushing , washer intermediate , o ring , pin , relay overload 13.2 to 20.0a , seal ring long , spanner for oil drain , worm wheel with pin , packing , o ring rub3034-71 dia8.6x391.4 mmart3909900d260172 , bearing ball 6205 , flexible coupling complete , bushing , bushing , seal ring , shaft of worm wheel , bushing , oil gauge glass , screw , protecting guard , ball bearing , tooth rim for flexible coupling , seal ring for coupling pulley , anti vibration mount type x-3 20 resistoflex make , o ring rub3034-71 dia6.3x38.7mm art64706drg260124 , pad friction complete for brake shoe , friction pad , friction pad , packing , pan tubular , o rinmg , worm , gasket , friction pad (2207) , socket 9/16inch (1/2inch) , gasket gravity disc/lock ring , seal ring , seal ring , ball bearing , o ring , ring wear , o ring , o ring , worm wheel , lock washer , bushing , pipe inlet , packing , screw buffer , spring , ring joint rulen gasket , nut for feed tube , protecting plate , handle , mv10 2way solenoid valve , nozzle , friction coupling , pad with screw for friction block , ball bearing , pneumatic change over 3 way valve , worm 50 c/s for mopx207 , nut for control paring disc , distributor cover , spring for operating slide for mopx207 , spring , buffer for spring casing for mopx207 , ball bearing housing for mopx207 , ball bearing , round nut km6 , coupling pulley complete for3191m/ , spring washer 1/2inch , ion coupling , friction pad with screws , major service kit (mopx 207) , gasket , push button red , worm wheel , washer lock , glass disc , seal ring for tachometer , extractor tool for level ring , height adjusting ring , gasket , worm wheel shaft with conveyor pulley , socket 21 mm (1/2inch) , valve plug for operating slide for mopx207 , gasket , paring disc cpl , dcu-41x pcb card shockgrade , lock washer mb6 , rectangular ring , spanner socket , axle buffer complete , coil
Tender For corrigendum : providing of custom bid for services - running, and maintenance of hvac, including free replacements, and repairs as listed below, consisting of 1. chiller unit: 2 2. air handling unit:6 3. exhaust air unit including bibos:13 4. testing, running and maintenance of all bibo units including free replacement of hepa filter bags. 5. maintenance and repairs of supply and exhaust motor: 6+13 6. hot water actuator with valve, chiller water actuator, humidifier heater (4), hot water generator, and hot water pump. 7. filters primary filter, fine filter, hepa filter for ahu. 8. free replacement of belts, or other small components, hepa filter bags, primary, fine and hepa filters 9. repair and servicing of the chillers that includes top-up of coolant and oil as required. 10. servicing and repairs of pass boxes including periodic uv lights replacements. maintenance, and running of electrical, ups system , repair, running and maintenance of three double door autoclaves and killtank , operation, maintenance of type ii b-2 bsc 5 units, operation, maintenance of individually ventilated cages (ivc) of mice (4racks and one ahu) and guinea pigs (two racks and two ahu) , operation and maintenance of building management system (bms) , routine maintenance of ro water plant , routine maintenance of the plumbing system , conduct annual validation , submission of monthly monitoring reports ,