Get complete information related to latest Auxiliary Reservoir Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Auxiliary Reservoir Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Auxiliary Reservoir Tenders.
Tender For supply of drain cock assembly for auxiliaryreservoir 200 liters to rdso drg. no.sk-98 003, alt.nil or latest conforming to rdso specn. no.02 amendment-4 with appendix-c. [ wa rranty period: 30 months after the date of delivery ]
Tender For supply of stainless steel air reservoir (20 ltrs) for demu coach to drg. no. icf/sk3-0-5-008, alt-b or latest for item 1 to 14 *icf drg. no. icf/sk3-0-5-008, alt-b *mat. spec.: as per drawing. **it seems that ab ove item is a part of air suspension control equipments for air spring assembly system with icf/lhb type bogie as per rdso spec. no. c-k 407 (rev. 4) [ warranty period: 30 months after the date of delivery ]
Tender For supply of auxiliaryreservoir 150 liters as per drg no. rsd-6337-073 item no. -02 alt-5 or sketch- k10 52. material and specification as per drawing. [ warranty period: 30 months after the date of delivery ]
Tender For supply of drain cock assembly for auxiliary reserv [drain cock assembly for auxiliaryreservoir 200 liters to rdso drg. no.sk-98003, alt.nil or latest conforming to rdso specn. no.02 amendment-4 with appendix-c.]
Tender For supply of auxiliaryreservoir - 200 ltrs. capacity together with drain cock assembly a nd its accessories conforming to rdso spec. no, 02-abr-02, amendment no. 4 of septembe r 2016, appendix - c to rdso drg no : rdso sk- 96081 alt : 5. [ warranty period: 36 months aft er the date of delivery ]
Tender For supply of auxiliaryreservoir 200 liters for air brake, to drawing/specification rdso spec. 02-abr -02, appendix-c, amendment no-4, rdso-sk-96081, alt no-5, item no-1 to18 in assembled condition. [ warranty period: 30 months after the date of delivery ]
Tender For supply of auxiliaryreservoir suspension strap drawing no.:- contr-9405-s/15, alt-10, ite m no-13 [ warranty period: 30 months after the date of delivery ]
Tender For balance work of construction, testing and commissioning of r.c.c. elevated service reservoir of 40 kl capacities & staging 12 mt. at michgaon including providing and fixing of ci double flange pipe, double flange specials & di double flange soft seated sluice valve including construction of suitable r.c.c. valve chamber & providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia upvc class 6/10 kg/sqcm pipe, 63/75 mm dia class 6 kg/sqcm hdpe pipe with suitable joints, valve specials and all fittings including all allied civil works, supplying & installation of energy efficient isi marked required capacity single phase, 50 hz, 220v, deep well submersible pump stainless steel body, suitable for 4"/6" tube well with control panel starter suitable for submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe, ss/nylon wire rope connection cable including electric connection from cspdcl, construction of brick masonry switch room , construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (f.h.t.c) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under single village of piped water supply scheme under jal jeevan mission for village michgaon, aamakodo, pitemeta, chawargaon block manpur district- mohla manpur a.chowki
Tender For balance work of construction, testing and commissioning of r.c.c. elevated service reservoir of 40 kl capacities & staging 15 mt. at jhitiya, 50 kl capacities & staging 12 mt at khadkhadi, 40 kl capacities & staging 12 mt at munjal including providing and fixing of ci double flange pipe, double flange specials & di double flange soft seated sluice valve including construction of suitable r.c.c. valve chamber & providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia upvc class 6/10 kg/sqcm pipe, 63/75 mm dia class 6 kg/sqcm hdpe pipe with suitable joints, valve specials and all fittings including all allied civil works, supplying & installation of energy efficient isi marked required capacity single phase, 50 hz, 220v, deep well submersible pump stainless steel body, suitable for 4"/6" tube well with control panel starter suitable for submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe, ss/nylon wire rope connection cable including electric connection from cspdcl, construction of brick masonry switch room , construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (f.h.t.c) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under single village of piped water supply scheme under jal jeevan mission for village munjal, jhitiya, khadkhadi block chowki district- mohla manpur a.chowki