CTN :45427478
11 Jun, 2026
NA
Tender For tender for supply of equipment / material , design, erection, testing & commissioning for sop to improvement of distribution system of various lwss in eletrical section silh under esd hpsebl majheen, ed jawalamukhi. - supply part of aug. 11/0.4 kv 100 to 250 kva distribution sub-station, cable 3.5 x 240 sq. mm, lt distribution panel box for 250 kva dtr, aluminium thimble 240 sq mm, capacitor bank 81 kvar for 250 kva dtr, danger plate, surge arrester, cted">transformer bed (civil work), chain link fencing, angle iron, gate etc. for
cted">transformer fencing, chemical earth, aaac 7/4.26 sq. mm, chain pully 3 ton, supply part of
ct-pt unit,
ct pt combined unit (pt:11 kv/110 v
ct: 200/5 a), 3-ph, 4-wire tri ve
ctor meter (pt - ratio -/110 v, pvc multistrand 2.5 sq mm copper wire, 1 inch dia gi pipe for concealing, bend joint/elbow, st pole 9 mtr long with base plate, muffs with concerete filling, x-arm: [channel iron (100x50x6 mm), length : 2800 mm x 4 nos], x-arm: [channel iron (75x40x4.8 mm), length : 2800 mm x 4 nos] for supporting do fuse unit & go switch, x-arm [channel iron (100x50x6 mm), length : 460 mm x 2 nos for supporting main channel of
cted">transformer, ms angle iron (50x50x6 mm), length : 2800 mm x 1 nos, ms angle iron 50x50x6 mm), length : 950 mm x 2 nos, ms angle iron (50x50x6 mm), length : 2800 mm x 4 nos, ms angle iron (50x50x6 mm), length : 460 mm x 2 nos, go switch handle supporting : [ channel iron (75x40x6 mm), length:460 mm, go ab switch unit (11kv, 400a, 25 ka ) triple pole o/d type, d.o fuse unit, surge arrester, 9 kv station class (porcelain type), discs insulator sets (comprising 1 no. disc: ^^(porcelain, bs, 12 kv, 90 kn) including dead end clamps etc.), stay set complete, stay wire, pipe earthing set, gi wire (6 swg) earth wire, half clamp (m.s. flat 50x6 mm), full clamp ( m.s flat 50x6 mm), nuts and bolts of various sizes (galvanised / coated), aluminium thimble, copper thimble, danger plate, barbed wire, aluminium paint., red oxide, ere
ction part of aug. 11/0.4 kv 100 to 250 kva distribution sub-station, ere
ction charges & transportation charges complete in all respe
ct of aug. 11/0.4 kv 100 to 250 kva distribution sub-station, ere
ction part of
ct-pt unit, ere
ction charges & transportation charges complete in all respe
ct of
ct-pt unit