Get complete information related to latest Bearing Cage Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Bearing Cage Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Bearing Cage Tenders.
Tender For repairing of scania p.380 registration no. jh10an-9492 and door no.03 at antst-jg ocp, lodna area, bccl. - repairing of scania p.380 registration no. jh10an-9492 and door no.03 at antst-jg ocp, lodna area, bccl. , repairing of scania p.380 registration no. jh10an-9492 and door no.03 at antst-jg ocp, lodna area, bccl. job to be done:-1- load body, hywa, dalla, switch, cartridge valve removing, repairing, o ring replacement fitting, load body dalla up & down problem rectifying.2- coolant bleed pipe removing and changing, fitting. 1 no.3- both side engine mounting removing & changing, fitting. 2 nos.4- dismantling, fitting complete clutch release bearing with bearing mounting changing, fitting.5- propeller shaft complete dismantling, fitting. 1 set.6- electronics lines with connector removing/repairing, checking, fitting., total impact of gst for the purpose of ctc
Tender For supply of piston with pin for 62 point 5 kva genr set , cylinder liner for 62 point 5 kva genr set , piston ring for 62 point 5 kva genr set , engine oil pump for 62 point 5 kva genr set , main and timing oil seal for 62 point 5 kva genr set , head gasket for 62 point 5 kva genr set , engine packing kit for 62 point 5 kva genr set , connecting rod for 62 point 5 kva genr set , main brg set of 5 pair for 62 point 5 kva genr set , cr brg set of 4 pair for 62 point 5 kva genr set , thrust washer for 62 point 5 kva genr set , valve guide for 62 point 5 kva genr set , valve seal for 62 point 5 kva genr set , push rod seal for 62 point 5 kva genr set , mobil filter for 62 point 5 kva genr set , diesel filter 2 pic 1 set for 62 point 5 kva genr set , turbo charger com assy for 62 point 5 kva genr set , air cleaner filter for 62 point 5 kva genr set , fip db element for 62 point 5 kva genr set , crank 3 set and cutting 5 set polish and bearing matching servicing for 62 point 5 kva genr set , head grinding fasing valve fitting 8 slot servicing for 62 point 5 kva genr set , radiator washing and cleaning for 62 point 5 kva genr set
Tender For supply of dyna roof colour sheet 22 ft , dyna roof colour sheet 12 ft , dyna roof colour sheet l type , dyna roof radgin 10 ft long , cotton , adopter , led display bd for engine oil system , black rigzin , led strip adr , cutting blade 4 , pink primer , bond light 180gm , reshine , bearing , wipes moten , flr set , mosier fitter , coil hose 10 mtr , ball valve , smps system charge , whee cylinder assy make tvs , master cylinder assy make tvs , status indicator , delta system mote digital flow indicator , digital temperature indicator and controller , protector 80a ac230v , rccb 4 pole , festo filter assy , piston assy , piston ring set , con rod bearing pair , cylinder head , set of joints , fuel filter element assy , primary element , thermostat element , vdo sensor assy , fuel feed pump , k clean 1 ltr , lab oil pressor sensor
Tender For supply of timing belt nos 01 , timing adjustable bearing nos 01 , water pump assemble each 01 , radiator cap nos 01 , timing belt cover nos 01 , hose connection with clip each 03 , engine oil 15w40 make servo castrol ltrs 05 , gear box stree differential lubricating oil sae 90 ltr 0 point 5 , brake fluid off 24 ltrs 0 point 5 , oil fuel filter element make mico each 03 , gear type oil pump each 01 , oil pump drive chain each 01 , stainer nos 01 , pressure release valve spring ball adjustable screw each 01 , hub greasing comple job 01 , hub oil seal nos 04 , grease castrol kg 01 , wheel balancing and alignment job 01 , servicing of cooling system and cleaning of radiator air , carbon plate set each 01 , brass bush set set of 04 nos set 01 , field coil set of 02 nos set 01 , air filter element each 01 , coolant bottle each 01 , inlet manifold and exhaust manifold packing nos 08 , half seat cover white cloth each 02 , velvet cloth acupressure type mat dari set of 04 nos set 01 , wheel cover set of 04 nos set 01 , steering cover each 01 , rexin cloth foot mat complete set in front and back seats set 01 , clutch and pressure plate assembly complete set 01 , clutch release bearing no 01 , clutch cylinder lower 01 , clutch cylinder upper 01 , clutch wire no 01 , accelerator cable no 01 , fuel hose pipe no 01 , replacement of ignition switch no 01
Tender For supply of bearing bush se kir , con rod brg std , main bearing , liner , ring , head gaskit , set off joint , set o ring , valve , guide , valve seal , tw , oil seal , thermostat valve , v belt cogged , machinery job works , engine opening fitting , radiator clearing charges , cly head job works , labour only for repairing of 500 kva generator with one oem engineer and helper all as per direction of engineerincharge
Tender For deequipping and destoring ofinfac t82 - 1 removal of fwd gun mount, qty-01. 1 no 2 removal of aft gun mount, qty-01. 1 no 3 blanking of fwd gun mount post, qty-01. 1 no 4 blanking of aft gun mount post, qty-01. 1 no 5 removal of small arms post- qty-02. 2 no 6 ra for removal of capstan. 1 no 7 blanking for weather proofing post removal of capstan. 1 no 8 removal of soft patches for both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 9 fitment of soft patches post removal of both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 10 removal/ degutting of both main engine and asd pump. 2 no 11 manufacturing of cradle (mat iron) and box (matwooden) for transportation of main engine.qty - 02. 2 no 12 manufacturing and fitment of dead weight and bilge plates. 1 no 13 removal of both main engine compensator bellow, qty 04. 4 no 14 removal of both main engine fuel water separator, qty 02. 2 no 15 removal/ degutting of both gearbox. 2 no 16 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of both gearbox. qty - 02. 2 no 17 manufacturing and fitment of dead weight and bilge plates for both gear box. 18 manufacturing and fitment of dead weight for both asd - 14 2 no 19 manufacturing and fitment of dead weight for both propellers. 2 no 20 removal/ degutting of ac plant and its auxiliary. list of auxiliaries:- (a) tev (thermostat expansion valve. (b) heat exchanger (condenser). (c) heat exchanger (chiller). 1 job 21 manufacturing and fitment of dead weight for ac plant. 1 no 22 decouple and removal/ degutting of fwd da 1 no 23 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of fwd da. 1 no 24 manufacturing and fitment of dead weight and bilge plates for fwd da. 1 no 25 decouple and removal/ degutting of aft da. 1 no 26 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of aft da. 1 no 27 manufacturing and fitment of dead weight and bilge plates of aft da 1 no 28 removal of hp pump of ro plant. 1 no 29 removal/ de-gutting of ro plant. 1 no 30 manufacturing and fitment of dead weight and bilge plates for ro plant 1 no 31 removal of soft patches for aft da and ro plant. 1 job 32 fitment of soft patches for aft da and ro plant. 1 job 33 removal/ de-gutting of mcs 5 control system with it s auxiliary. list of auxiliaries:- (a) lop 02 (b) junction box 02 (c) rcs 04 (d) ecs -02 (e) throttle lever 04 1 job 34 blanking of patches post removal of mcs 5 control system to maintain weather proofing. 1 no 35 removal/ de-gutting of asd steering control box with accessories and it s auxiliary. list of auxiliaries are as follows:- (a) steering trim indicator 02 (b) main control 1 job page 3 / 13 panel 01 (c) asd controller 01 (d) trim controller lever 02 36 blanking of patches to maintain weather proofing for asd control box system. 1 no 37 removal of halon bottle 2 no 38 removal/ de-gutting of both shaft & support bearing 2 no 39 manufacturing of cradle (mat iron) and box (wooden) for transportation shaft & support bearing. qty 02. 2 no 40 requirement of tractor & trailer for shifting of items from ship to center for 20 days. 20 days 41 transport requirement (01 tonner) for shifting of items from ship to center for serviceability checks, 40 days. 40 days 42 requirement crane with sling (15,10,05,02 and 01 ton) for 40 days 40 days 43 removal of radar vm display, atu and antenna. 3 no 44 removal of existing cables of radar vm. 3 no 45 blanking and fitment of patches to maintain weather proofing 1 no 46 ra for degutting and de-equipping of ecdis display, ups, processor unit and interface unit with removal of cables. 4 no 47 removal of wind speed sensor and its dispaly unit and cables 1 no 48 blanking and fitment of patches to maintain weather proofing 1 no 49 removal of mss mk ii system, antenna and cables. 2 no 50 mk ii blanking of patches to maintain weather proofing. 1 no 51 removal of 07 in number navigation and emergency light. 7 no 52 manufactu