Tender For corrigendum : supply of vehicle spare parts-- oil filter for bolero bs-vi , fuel filter bolero bs-vi , hub oil seal rear bolero bs-vi , oil filter for m m thar , hub oil seal front, rear for m m thar , air filter for m m thar , fuel filter for bolero camper , air filter for bolero camper , oil filter for bolero camper , rod spring bush metal type for bolero camper , shackle bush balencing rod for bolero camper , front hub oil seal inner for bolero camper , oil filter for tata 407 bs-vi , fuel filter for tata 407 bs-vi , r whell oil seal inner for tata 407 bs-vi , f wheel oil seal inner for tata 407 bs-vi , rod spring shackle pin bush for tata 407 bs-vi , clutuh cly repair kit for tata 407 bs-vi , rear wheel cyl repair kit for tata 407 bs-vi , master cyl r kit for tata 407 bs-vi , check not lock whasher for tata 407 bs-vi , oil filter -t712 bus , fuel filter t-712 bus , sleeve cyl repair kit for tata 1212 bs-vi , fuel filter -water supretor for tata 1212 bs-vi , f wheel oil seal outer, inner for tata 1212 bs- vi , r wheel oil seal outer, inner for tata 1212 bs-vi , clutch cyl repair kit for tata 1212 bs-vi , check not lock whasher for tata 1212 bs-vi , oil filter for tata 1212 bs-vi , oil filter for tata 1212 bs-iv , oil filter -tata-713 bp , insulation tape , lt wire 4-5mm , emery pepper , fog light bulb 12v , bulb 12v21w s-f , bulb 12v5w s-f , fuse 10,15,20,30 and 40 amp , wildign rod , anabond , val pin , omini patch big ) /bid number : gem/2025/b/6980615 * /dated: 11-12-2025 & & / bid document 1 / 34
Tender For bid to ras supply of repair of vehicle - steering oil pipe als , hood lifting ramp assy oh als , clutch plate repeating als , ball joint als , wheel alignment tata safari , wiper blade tata safari , uj cross maruti gypsy , front break pad maruti gypsy , found hub bearing maruti gypsy , hub seal maruti gypsy , circlip lock maruti gypsy , rear hub seal army bus , high pressure line brazing als , hose pipe als , mounting bolt als , clutch cable maruti ciaz , clutch master cylinder assy maruti ciaz , labour charge maruti ciaz , cabin lifting pump oh als , clutch booster als , door regulator assy maruti gypsy , side channel beading maruti gypsy , hose pipe maruti gypsy , reverse light switch maruti gypsy , front break cable royal enfield , side mirror royal enfield , self armature sx4 , solenoid switch sx4 , copper bush sx4 , brush carrier sx4 , wiper relay 2.5 ton , rotating gear 2.5 ton , pressure pipe als , reverse light switch als , head light bulb hero honda , rear door lock assy maruti gypsy , water pump assy als , thermostat valve als , door regulator assy als , u bolt army bus , hub seal als , door light switch maruti gypsy , clutch master cylinder assy als , self bush 2.5 ton , clutch master cylinder assy tata safari , clutch cable tata safari , labour charge tata safari , break light switch maruti gypsy , release bearing maruti gypsy , clutch plate new fitted maruti gypsy , pressure plate maruti gypsy , wiper motor gear 2.5 ton , temperature sensor als , battery lead als , ac compressor assy new fitted tata safari , ac clutch assy tata safari , ac gas filling tata safari , air compressor fitting and clutch fitting and checking and fitting all parts tata safari , glow box maruti ciaz , clutch cable royal enfield ) /bid number : gem/2025/b/6907572 * /dated: 21-11-2025 & & / bid document 1 / 45
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For supply of repair flt 5 ton 171071 -repair oblique maint of flt s no 171071 , parts of vehicle to be replaced , stop cable , fuel pipe intake and return pipe set , accelerator cable , fuel filter set , hose pipe set , air filter set , engine oil , exhaust bellow spring , coolant , grease , oil filter , rubber packing for engine cover , hub packing kit , shaft seal kit , hydraulic oil , brake fluid , hood cover with fixing arrangement , engine cover lift pump , brake shoes set complete , maintenance and labour work required , changing of engine oil brake fluid , brake bleeding , greasing of wheel hub and lifter chain , servicing of vehicle , repair of oil chamber complete , adjustment of clutch , caliberation of injector nozzle , taking and bringing back the vehicles to ge ep jodhpur and testing of vehicles upto the entire satisfaction
Tender For supply of repair of veh c c - replacement of spark plug of bajaj platina , replacement of indicators of bajaj platina , replacement of engine oil of bajaj platina make castrol , replacement of seat cover of bajaj platina , replacement of oil filter of bajaj platina , replacement of camshaft complete of bajaj platina , replacement of mirror of bajaj platina , replacement of air cleaner of bajaj platina , replacement of rear shocker absorber , making charges labour charges , replacement of speedometer assembly of bajaj platina , general service od engine at authorised workshop of bajaj platina , replacement of rear wheel hub of bajaj platina , replacement of brake shoes of bajaj platina , replacement of air filter of bajaj platina , replacement of accelator cable of bajaj platina , replacement of spark plug of hero hf deluxe , replacement of engine oil of hero hf deluxe make castrol , replacement of seat cover of hero hf deluxe , replacement of oil filter of hero hf deluxe , replacement of rr unit regulator rectifier of hero hf deluxe , replacement of mirror of hero hf deluxe , replacement of air cleaner of hero hf deluxe , replacement of gear shift spindle of hero hf deluxe , engine overhauling at authorised hero dealer workshop , general service od engine at authorised workshop of hero hf deluxe , replacement of clutch cable with clutch plates of hero hf deluxe , replacement of brake shoes of hero hf deluxe , replacement of chain sprocket kit of hero hf deluxe , replacement of centre stand of hero hf deluxe , replacement of crankshaft complete assembly of hero hf deluxe , replacement of main shaft 4th gear , taking the vehicle at repair centre , replacement of radiator of swift dzire , replacement of fog lamp of swift dzire , replacement of front suspension strut assembly right of swift dzire , replacement of timing belt of swift dzire , replacement of coolant of swift dzire , replacement of front drive shaft assembly left of swift dzire , replacement of oil filter of swift dzire , replacement of bearing front wheel of swift dzire , replacement of engine oil 10w30 of swift dzire , replacement of intercooler of swift dzire //bid details2 / 45