Tender For supply of working model of cooling system , working model of transmission system , working model of fuel system , working model of electrical system , cut section model of petrol engine 4 cylinder , cut section model of diesel engine 4 cylinder , cut section model of diesel engine 6 cylinder , cut section model of rear axle assembly , front axle with pull and push rod and tie assembly , gear box assembly , steering box assembly , brake chamber , e-1 brake valve , air filter , clutch cover assembly , clutch disc , gear box gears , top gear shaft , main shaft , counter gear , axle shaft , crown wheel with pinion , starter motor , alternator , msm and psl safety routines , ipde principle , stoping distance , following distance , curve handling , traffic sign boards , over head projector , slide projector , tv and vcr vcd , multimedia projector , magnetic board , air compressor , ponture kit with tyre lever , wheel brace , jack and tyre pressure gauge , trolley jack , grease gun , spanners a set each no. fix spanners, box spanners, pliers, screw drivers, screw spanners and hammer , battery charger , vision drum placed 20 feet 6 mts. from the person , trial set with frame , ishihara chart for color vision testing , near vision chart , weighing machine , height meter for measuring height
Tender For name of the work major overhauling of 02 nos kt1150 engines and 01 novt28 l engine cummin s make of san locomotives assisting for dismantling of kt1150 and vt28 l engines from the locomotives joint inspection of testing of overhauled engines shall be conducted between kpcl representative and firms representative joint inspection report of testing jirt after completion of re assembly shall be furnished to this office joint inspection of testing may be waived off at the discretion of the undersigned but the test report shall be furnished.removal and re installation of engine. this includes the complete procedure of safely removing the engine from the locomotive and, after completion of the necessary repair or overhaul work, re-mounting the engine back into the locomotive. all required tools, fixtures, lifting mechanisms, and safety measures shall be managed by the vendor.engine alignment process the alignment process involves precise positioning and securing of the engine to ensure correct interfacing with the locomotives drivetrain coupling systems, and support structures this includes, but is not limited to mounting of the engine onto the engine bed frame using proper alignment tools and calibrated instruments ensuring parallelism and angular alignment of the engine relative to the transmission or traction system verifying coupling concentricity and ensuring there is no misalignment that may lead to premature wear vibration or operational issues tightening of mounting bolts to specified torque values and rechecking alignment post tightening conducting necessary trial runs and adjustments if any to confirm proper functionality before final handover all the released items shall be returned in separate packing along with overhauled engines to kpcl
Tender For providing of customized amc/cmc for pre-owned products - leica hemopharm bloodcollectionmonitor; tube sealer bt200 special repair no 55301 and special repair no 99607; annual maintenance contract (amc); six-monthly; no