Tender For auction sale of scrap copper bus bar,scrap copper flats,scrap 100mva transformers copper winding coil with insulation(without oil),scrap copper control cable,scrap xlpe copper ug cable,scrap cts & pts & scrap c.v.t,scrap meters and relays,scrap all type of acsr counductors,scrap aluminium bus bars,aluminium armoured rod,scrap ug cable aluminium,scrap aluminium control cable,scrap pilc alluminium ug cable,scrap aluminium hardware, wave trap, y type clamps,scrap gi tower parts plates & cleats including nuts & bolts,scrap released hard wares, scrap gos set,scrap gi pipe,scrap ms tower parts angel iron plates & cleats, bolt &nuts,scrap breakers parts with insulators, panels and annunciators etc,scrap ground wire/earth wire,scrap empty barrels,scrap ug cable rims, scrap ms pipe,released scrap rail poles, 66kv mounting structure (rail poles),scrap compound poles, scrap rcc poles,scrap insulators,scrap ehv breakers porcelain limbs and its support insulators,sf-6 gas cylinder all size,scrap capacitor cell,scrap lightning arrestors,scrap surge counters/monitors,coupling device,scrap battery cells,scrap transformer oil,scrap t&p articles,sparefor100mva ge tran,spare for 100mva bhel make tran(without oil),scrap auxiliary transformers(5 kva) without oil etc,scrap 20mva power transformer at 220kv mrs, shivamogga (without oil),scrap6.3mva power tran at66/11kv thyavarechatnahalli(withoutoil)
Tender For ttps mech ii bm unit i ii iii attending breakdown works in unit i ii iii esp for the period from 01 04 2025 to 31 03 2026 - charges for removal of field shortage by snapping of field emitting electrodes and normalizing the field, charges for removal of field shortage by repositioning of displaced collecting plate at the top and normalizing the field., charges for removal of field shortage by repositioning the collecting plate at the bottom and tag welding the wornout portion of the collecting plate with a piece and normalizing the field., charges for reconditioning/replacing worn out/bent shock bar guides both front and rear wherever necessary, charges for replacing of defective shaft insulator by a new one after releasing of gear box and refitting on completion of work in one field., charges for releasing the rapping mechanism gear box, dismantling the coupling, transporting the gear box to office store and transporting the new or reconditioned gear box from store or office store to workspot and assemble the same, charges for cleaning of ash accumulated ash inside the esp hopper, charges for overhauling of defective rapping motor gear box and testing, charges for removal of the ash accumulated in the collecting and emitting rapping gear boxes, arresting of oil leakage if any, removal of oil spillage, top up of oil and removal of foreign material in that area in one unit esp, opening all the manhole doors in 7.5 mtr. and roof top of esp, mechanical cleaning and water washing the fields in esp including collecting plates, emitting electrode rapping mechanism and structures inside the esp and esp hoppers, and closing all the manhole doors including the cost of asbestos ropes for doors completely., charges for cleaning the stair case, collecting rapping mechanism platform, emitting rapping mechanism platform at unit i, ii & iii esp including consumables, charges for removal of the scrap materials and ash accumulated below and around id,fd and pa fans floor area of unit i, ii & iii & transporting and devolution of scrap materials to stores and disposal of ash including cost of consumables, charges for cutting and dismantling the existing wornout structurals supports, hand rails, platform & ladders etc., from unit esp and transporting the same to stores and devolution., charges for fabrication and erection of structuals supports, hand rails, platform & ladders etc., in unit esp