Get complete information related to latest Bronze Tubing Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Bronze Tubing Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Bronze Tubing Tenders.
Tender For tender for “work for thickness survey (de-metering) of boiler tubes of unit # 2 (210mw) & unit # 5(500mw) bhel boilers of htps, cspgcl, korba west.
Tender For work of radiography and interpretation of hp weld joints of boiler tubes during short shutdown of unit-6, ktps koradi on as-and-when-required basis.
Tender For supply & installation of water preheater tubes, end plates of 02 nos of 4tph boiler by dismantling existing wph tubes and end plates at udupi dairy uppoor, udupi
Tender For frh defective tubes replacement with fresh spool tubes of ss material fit up welding and applicable ndt at unit2 boiler of 2x660 mw udangudi stpp
Tender For corrigendum : providing of custom bid for services - 200151357 proposal for carrying out iosm and mpi testing for boiler tubes during overhauling (2026-2028) at ntpc korba
Tender For (1) for the work of cane carrier (2) for the work of removing ash from boiler house (3) for the work of moving bagasse (4) for the work of baling bagasse (5) for the work of sugar house (6) for the work of lime, sulphur and chemicals (7) for the work of sugar godown (8) for the work of preparing pressed mud/bio-compost fertilizer and transporting prepared fertilizer/pressed mud (9) for the work of spraying spent wash in bio-compost yard (10) for the work of cleaning tubes of evaporator, pan and wash heater
Tender For the work of inspection of water wall tubes & corrosion mapping by remote field electromagnetic test (rfet) in boiler unit # 7, 500mw during coh at cstps, chandrapur.
Tender For w.p. 21kg/cm2, cap.- 20 t/hr., live steam temp. 320 0c, replacement of both side bottom headers with stub and tubes of both side headers replacement of boiler no. mp-4637, w.p. - 45kg/cm2, cap.- 40 t/hr., live steam temp. 450 0c, bank tubes