Tender For procurement of stationery and printed materials including registers and other items d d - air compressor house log book , bulk reporting register , market return cylinder record with carbon copy , bulk tanker safety check by security , valve changing check record , cylinders counting as on , deployemnt roster for bcwe , daily safety audit dsa 3 pages , dg set log book , deployemnt of contract labores , daily consumables materials , filling m c accuracy check record , fire pump house log book , gate pass book labour,driver,contractor , haulage electrical supervisor work book , check scale accuracy record , tare weight correction control record , labour entry attendanec register , lpg pump and compressor house log book , machine hourly reaading log book , packed tts in out register , pmcc log book , packed bulk truck security check , patrolling record , pump house log book , night shift security deployment , cylinder counting register gate 2 , rqc book , shift activity report with carbon copy , cylinder receipt tally register , material demand books with carbon copy , packed truck security safety check , sticker for nd cylinders , before after tld check report by tld employee , vld old cvt calibration records , inventory register gate 1 , attendence register staff officer , record of quality inspection satutatry tested cylinders , lpg cylinders acceptence check record , bin cards store , route cards stp , gauge book sandd , gate pass card contarctor labour , daily security checklist for packed bulk tts with carbon copy , quarterly safety checklist for packed tts with carbon copy , quarterly safety checklist for bulk tts with crabon copy , stock register , a4 paper reams , cylinder found fit for repair with carbon copy , trem card bulk tts , trem card packed tts , saftey kit card , letter head iocl , sop booklet bilingual , sop handbook , certificate of periodic testing of lpg cylinders , flex normal quality , star flex panel sheet , vinyl flex , butterflow blue pen cello , use and throw pens blue , red pens , cd marker , black marker , gum tube small , fevistick , pencil , erraser , stappler pins small , alpin , cobra file , box file , register 200 page , carbon papers , calculator , whitener pens , white tape 2 inch , khakee tape 2 inch , note pads spiral , note pad blank , sharpner , board marker blue , stepllers , l folder , button folder , white chalk
Tender For corrigendum : providing of custom bid for services - custom bid for services - valce salvaging job; f work covers salvaging of defective sc valves and restoring them for reuse as per standard procedures and instructions of the officer-in-charge. the contractor shall carry out the following activities in a safe, systematic, and accountable manner: 1. salvaging operations salvaging of defective sc valves shall be carried out as per laid-down procedures using the valve test bench and/or any other equipment or method advised by the officer-incharge. the contractor shall collect defective sc valves from the store after obtaining necessary approvals. 2. cleaning & preparation clean all defective sc valves in the ultrasonic valve cleaning machine and/or other approved valve cleaning systems. ensure all valves are thoroughly cleaned to remove dirt, oil, or contaminants before testing. segregate cleaned valves properly for further inspection and testing. 3. segregation & testing segregate valves based on their source (e.g. hot repair, defective, pin leak, scrapable cylinders, etc.). perform low pressure and high pressure testing of the valves as per laid-down procedures and test parameters. identify valves that are fit for reuse and those that are defective/rejects. 4. salvaging & assembly replace the old o -ring washer of all good salvaged valves with new o -ring washers (to be provided by hpcl). fit safety caps and back covers on the salvaged valves to protect them from dust and contamination. ensure salvaged valves are clean, properly assembled, and ready for storage. 5. storage & documentation arrange salvaged valves type-wise in a countable and organized manner and deposit them in the stores. ensure proper handling to avoid damage or mixing of valve categories. maintain shift-wise records of: o number of valves received, o number of valves cleaned, tested and salvaged, o number of valves rejected. 6. manpower & productivity contractor shall provide minimum one manpower per shift. a minimum target of 400 sc valves shall be salvaged per manpower per shift. inventory of defective valves pending salvaging shall not exceed one day s generation. 7. materials & consumables hpcl shall provide o -ring washers, safety caps, back covers, and other reusable fittings. kerosene and other cleaning consumables shall be supplied by the vendor. contractor shall ensure availability of all tools and accessories required for smooth execution. 8. certification & payment the shift officer shall certify the salvaged quantity at the end of each shift. payment shall be made strictly on actual quantity salvaged and accepted by hpcl. any deviation or failure to meet daily targets may attract penalty as per tender terms. 9. safety & compliance all activities shall be carried out in compliance with hpcl safety norms and oisd guidelines. personnel shall wear required ppe (gloves, goggles, shoes, helmet) during operations. all salvaging and testing activities shall be conducted under the supervision of hpcl personnel.