Tender For rate contract for 1) sand, gravel, metal, grit, coir dust, rubble price per ton 2) it price per piece 3) cement 53 grade, one bag 4) paver block (60 to 150 mm) per brass 5) pvc pipe (90, 110, 150, 200mm) kg isi as well as water workers, plumbing goods per piece 1) voter repairing 2ph, 3ph, 5ph, 7.5ph, 10ph (sonar/mono nosode) and starter 7) streetlights/repairs, led lights, switches, etc. 8) rcc pipe (300, 450, 600, 900, 1200 mm) hole cover fencing pole, per piece 9) windows, doors, marble, kota stone, shutter tiles, sanitary items, per piece 10) tractor, tanker (5, 10km) per round 11) jcb and hitachi machines, as per requirement, 1,000 per hour price 12) door to door garbage collection monthly (labor tempo will be of the contractor). 13) c.c. road block paving, slab, masonry, plaster tiles, shuttering, sewer line, pipeline, excavation, slab drain, sheet shed, three-phase bore motor work, hand pump etc. labor cost per foot 14) steel, galvanized, gi sheet per kg 15) price per piece of cleaning equipment 16) price per piece of sports equipment and equipment for public garden facilities 17) revolving chair and table price per piece
Tender For rate contract for 1) sand, gravel, metal, grit, coir dust, rubble price per ton 2) it price per piece 3) cement 53 grade, one bag 4) paver block (60 to 150 mm) per brass 5) pvc pipe (90, 110, 150, 200mm) kg isi as well as water workers, plumbing goods per piece 1) boots repairing 2ph, 3ph, 5ph, 7.5ph, 10ph (sunshine/mono blod) 7) streetlights/repairs, led lights, switches, etc. 8) rcc pipe (300, 450, 600, 900, 1200 mm) hole cover fencing pole, per piece 9) windows, doors, marble, kota stone, shutter tiles, sanitary items, per piece 10) tractor, tanker (5, 10km) per round 11) jcb and hitachi machines, as per requirement, 1,000 per hour price 12) door to door garbage collection monthly (labor tempo will be of the contractor). 13) cc road block paving, slab, masonry, plaster tiles, shuttering, sewer line, pipeline, excavation, slab drainage, sheet shed, three mix bore motor labor cost per foot for work, hand pump etc. 14) steel, galvanized, gi sheet per kg 15) price per piece of cleaning equipment 16) the price of sports equipment and equipment for public garden facilities is extremely high. 17) revolving chair and table price per piece 18) all cctv camera related equipment
Tender For repair of waterproofing of station building , provision of staff toilets including separate ladies toilet at power house no. 04 , construction of two toilet complexes at dli end of parcel shed for rpf staff , provision of four rpf security check posts and other allied works related to rpsf barrack at second floor of anand vihar terminal and replacement of old corroded gi water pipeline for washing lines 1 to 5 and stabling lines 1 to 3,including allied works related to sick line and washing line complex at anand vihar terminal in the supply of sse/w/anvt under aden / ndls.