Get complete information related to latest Climbing Wall Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Climbing Wall Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Climbing Wall Tenders.
Tender For supply of glass for end wall door of lhb coaches as per drawing no. - lw 56369 alt-a or lates t [ warranty period: 30 months after the date of delivery ]
Tender For ohe modification in connection with extension of dead end in halvad, platform extension & retaining wall around foundation at different locations in ahmedabad division
Tender For supply of locking pin internal (for end wall sliding door complete) to rcf drg no : l w56359 alt : nil. [ warranty period: 30 months after the date of delivery ]
Tender For providing of custom bid for services - supply installation testing and commissioning of indoor led video wall video codec end points av equipments and other accessories for the establishment of video conference hall and auditorium at ao building ntpl
Tender For corrigendum : supply of embryology model and gross anatomy model - first meiotic division , second meiotic division , changesoccurring in primordial follicle during 1st half of ovariancycle , grafian follicle ovulation corpus luteum , relationshipof fimbriae and ovary , schematic representation of thethree phases of oocyte penetration , schematicrepresentation of a section through a human blastocystrecovered from the uterine cavity , schematicrepresentation of the events taking place during the firstweek of human development , schematic representation ofthe changes taking place in the uterine mucosa correlatedwith those in the ovary , human blastocyst 9 days , humanblastocyst of approx 12 days , human blastocyst 13 days ,development of the villus , villus at the end of the thirdweek of the development , presomite embryo and thetrophoblast at the end of the third week , presomite embryoof a 16 days , presomite embryo of a 19n days , presomiteembryo of a 20 days , human embryo at 22 days , 14somite embryo approx 25 days , 25 somite embryo 28 days, transverse sections the development of the mesodermalgerm layer day 17 19 20 21 days , extra and intra-embryonic vascularization in an embryo at the end of 3rdweek , transverse section through embryo at various stagesof development to show the effect of the lateral folding onthe endoderm lined cavity connection between the gut andthe yolk sac , human embryo at the beginning of the secondmonth of development , structure of the villi at variousstages of development , relation of the fetal membranesand the wall of the uterus , placenta in the second half ofpregnancy , full term placenta , development of dizygotictwins each embryo normally has its own chorion andplacenta , relation of fetal membranes in monozygotic twins , skull of new-born , development of the limb buds at the primitive gastro intestinal tract 25 days , developmentof liver , development of stomach , development ofpancreas , dorsal view of a late presomite embryo anddorsal view of human embryo 18 days and 20 days , varioustypes of spina bifida , ventrolateral view of the optic cupand optic stalk of 6 week embryo , frontal aspect of the faceat five week embryo and six weeks seven weeks and tenweeks development of face , development of eye ,development of ear , ventral view of the palate gum lip andnose , development of a hair and a sebaceous gland at fourmonths six months and newborn , development mammarygland at the third and eighth months and the positions ofaccessory nipples , formation of the tooth at successivestages of development at 8 weeks 10 weeks 3 months 6months eight months and after eruption , sagittal midlinesection of embryos at various stages set of four models onstand 3d , successive stages in development of therespiratory four gut 3d at the end of the third week at the fourth week , lateral view of human embryo showing
Tender For lws pp-2 shell kit (a) one coach set of roof, sidewall and end wall for amrit bharat l ws/pp2 (754) 1. roof assembly to drg no 75416001, alt nil- 1 no, 2. end roof assembly to drg no 9721 6008, alt 'a'- 2 nos 3. side wall to drg no 75414001,alt 'a'- 1 no welding pin arrangement to drg no 58 110037 alt 'nil' has to be assembled on roof and sidewall while supplying. 4. end wall to drg no 75415 001, alt 'b'- 2 nos the firm shall fulfil the requirement as per icf//md/specn.200, issue status01, re v 04 with amendment no 01. the firm shall fulfil the requirement as per icf/md/spec-315,i ssue status-01,rev.00 firm has to supply roof and sidewall without applying etch primer and the fir m has to apply etch primer on roof and sidewall in icf after shell assembly. (b) one coach set of bo dy shell items and partition frames for lws/pp2 (754) coaches to drg nos, 1. 75410041, alt ni l - 1 no 2. 75410002, alt 'b' - 1 no 3. 75410006, alt nil - 2 nos 4. 58110054, alt 'e' - 1 no 5. 67010011, alt 'a' - 2 nos 6. aaa10488, alt 'c' - 6 nos 7. 58110017, alt 'b' - 2 nos 8. aab10338, alt nil - 24 nos 9. a ai10188, alt nil - 4 nos (c) under frame arrangement to drg no. lws pp 67011001, alt 'l'. specia l condition : a) -packing as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1 867, alt. 'nil' -packing as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk- 1865, alt "a". c)packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe sh ould be supplied as normal side up and side bearer side down. [safety item ]
Tender For lwlrrm shell kit (a) lwlrrm - roof, sidewall and end wall one coach set of roof, 2 mm side wall and end wall for lwlrrm coaches with noise reduction feature 1) roof c omplete to drg. no. 53816018, alt 'c' - 1 no 2) final roof element to drg. no. 83416016, alt ' a'-1 no 3) roof end part complete to drg. no.83416017, alt 'a' -1 no 4) end roof assy to drg no. 58116066, alt 'g' - 1 no, 5) ss trough arrangement to drg no. 53816023 alt 'a'- 1 no 6) side wall right complete to drg. no. lp14110, alt a anx. 6 -1 no 7) side wall left complete to drg.n o. lp14111, alt a anx.6 -1 no 8) sidewall npp-end right complete to drg.no.1.10113.0.20.110. 004, alt b anx.3 -1 no 9) side wall coach end complete to drg.no. 1.10113.0.20.110.003, alt b anx.4 -1 no 10) side wall pp end left cpl to drg.no. 1.10113.0.20.110.005, alt nil anx.3 -1 n o 11) side wall pp end right cpl to drg .no. 1.11012.0.20.110.003, alt nil anx.3 -1 no 12) end wall complete for lhb power car to drg. no. 1.11012.0.20.120.003, alt a anx.9 - 1 no with l atest detail drgs 1.11012.0.20.120.004-alt b anx-4 and mi007721_a_anx-2 13)end wall compl ete for lhb power car to drg. no. lp15103, alt nil anx-2 -1no 14) door cut out to drawin g no. lr10295-1 no & lr10296, alt a-1 no, 72914089, alt c- 1 no, 729 14 091, alt c- 1 no, 15) car l ine nos 1.11012.0.20.110.007, alt r - 1 no and 1.11012.0.20.110.008, alt r - 1 no. the end wall sha ll be assembled with cover sheet and shutter complete to item no.1 & 2 of drg.no.3.1011 3.0.20.120.183, br and item 6,7,8,10,12 of drg.no.2.10113.0.76.300.002, alt c and tail lamp br acket to drg no.2.10113.0.10.300.001. the firm shall fulfill the requirement as per.icf/md/ specn.200, issue status-01, rev-04 with amendment no-01. for end wall the firm shall fulf il the requirement as per icf/md/spec-315,issue status-01, rev.00. firm has to supply roof and sidewall without applying etch primer and the firm has to apply etch primer on roof and sidewall in icf after shell assembly. (b) body shell items & partitions for lwlrrm shell kit supply and insta llation of body shell items and partition frames for lwlrrm coaches to drg. no. 1) aaa1 0488, alt. c- 2 nos (rain water gutter) 2) 2 11012.0.20.110.100, alt.nil-2 nos.(rain water gutter) 3) lp 10107, alt. nil - 2 nos,(sheeting) 4) lp10136, alt d anx-4 -1no. (welding parts car body) 5) lp10125 alt b anx-10, item-33 - 14 nos.(ledge) 6) lp10108, alt a anx-1- 8 nos.(duct assy) 7) aaa10278, alt . nil-4 nos.(hand hold arrangement) 8) 1.11012.0.03.095.001 alt a -1 no (w/p in u/f incl. 53810070 & 53810035) 9) lp10139, anx-5 - 1 no (partition frames) the above items to be supplied as set and install the same at the body shell assembly stage to assembly drg.no. lp10125, alt b anx -10 (c) under frame arrangement -613-lp11103 alt 'd' anx-7 the manufacturing facility as pe r icf/md/spec-147, issue status-01 rev.02 with amendment no.01 special condition : a) -packin g as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1867, alt. 'nil' -packin g as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk-1865, alt "a". installa tion required as per assy.drg.& annexure-a, dtd 13-09-2023 to be followed. supply rates a nd installation rates to be quoted separately. c)packing condition as per drg.no.icf/j&t /misc-2487, alt 'b' the underframe should be supplied as normal side up and side bearer s ide down. [safety item ]