Get complete information related to latest Combined Heat Plant Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Combined Heat Plant Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Combined Heat Plant Tenders.
Tender For supply of piano type modular domestic electrical sockets - is 1293 (q3) , heating element (bhel) (q3) , dol starter (q3) , piano type modular domestic fan regulator as per is 11037 (q3) , modular piano type domestic electrical switches as per is 3854 (q3) , fixed capacitors (fixed capacitor for single phase ac electric fan) as per is 1709:1984 (q3) , rigid plain conduits of insulating materials as per is 9537 (part 3) (q3) , fuse wire as per is 9926 (q3) , foot valve 50 mm , foot valve 80 mm , foot valve 100 mm , nrv 50 mm , nrv 80 mm , nrv 100 mm , nrv 150 mm , butterfly valve 50 mm , butterfly valve 80 mm , butterfly valve 100 mm , butterfly valve 150 mm , butterfly valve 200 mm , mechanical joint kit 100 mm , mechanical joint kit 150 mm , mechanical joint kit 200 mm , automatic dolta starter 10 hp , automatic dolta starter 30 hp , automatic dolta starter 20 hp , glass pane 4x4x4 mm thick plain modiguard , glass pane 4x4x4 mm thick frosted modiguard , foam cushion of size 580x520x100 mm thick of density 40 mm , cover only for foam cushion 580x520x100 mm , led driver for 150 watt led fitting , led driver for 70 watt led fitting , led driver for 80 watt led fitting , led driver for 90 watt led fitting , led driver for 45 watt led fitting , led driver for 25 watt led fitting , led driver for 30 watt led fitting , bwr plywood commercial 8x4x4 mm , bwr plywood commercial 8x4x4 mm , bwr plywood commercial 6x3x12 mm , bwr plywood commercial 8x4x12 mm , bwr plywood commercial 8x4x6 mm , bwr plywood commercial 8x4x18 mm , bwr plywood commercial 8x4x9 mm , six ft fully operated cloth drying stystem 22 mm , air release valve 80 mm , air release valve 50 mm , air release valve 100 mm , air release valve 150 mm
Tender For mudhalvarin grama salaigal membattu thittam mgsmt 2025-26 phase- i package no. tn05-02 3 nos in oddanchatram block of dindigul district - name of the work : 1. upgradation of the road from veeralapatty - velur bt road km 0/0 - 1/060 (r 102)estimate amount : rs. 35.23 lakhs, a. construction work clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp., km 0/0 -1/060, earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per ss20a, km 0/0 -1/060, providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete., km 0/0 -1/060, providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification., km 0/0 -1/060, providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.., km 0/0 -1/060, bituminous concrete 25 mm thick using cmp (grade-ii) providing and laying bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of vg30/vg40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t cmp with bitumen boiler, tipper trucks,paver finisher/9m
Tender For mudhalvarin grama salaigal membattu thittam mgsmt 2025-26 phase- i package no. tn05-04 3 nos in oddanchatram block of dindigul district - name of the work : 1. strengthening of the road from vadamadurai - oddanchatram road to thippampatty km 0/0 - 1/550 (r 131)estimate amount : rs. 55.40 lakhs, a. construction work clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp., km 0/0 -1/550, earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per ss20a, km 0/0 -1/550, picking the existing worn - out wbm / bt surface using 5 - 10 cm thick including allcost andconveyance of all materials and all labour charges etc complete, km 0/0 -1/550, providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete., km 0/0 -1/550, providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification., km 0/0 -1/550, providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.., km 0/0 -1/550, bituminous concrete 25 mm thick using cmp (grade-ii) providing and laying bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of vg30/vg40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roll
Tender For mudhalvarin grama salaigal membattu thittam mgsmt 2025-26 phase- i package no. tn05-06- 2 nos in oddanchatram block of dindigul district - name of the work : 1. upgradation of the road from k.keeranur - kallimandayam road to perumal karadu road. km 0/0 - 0/870 (r 439)estimate amount : rs. 30.37 lakhs, a. construction work clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp., km 0/0 -0/870, earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per ss20a, km 0/0 -0/870, providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete., km 0/0 -0/870, providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification., km 0/0 -0/870, providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.., km 0/0 -0/870, bituminous concrete 25 mm thick using cmp (grade-ii) providing and laying bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of vg30/vg40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t cmp with bitumen boiler, tipp
Tender For mudhalvarin grama salaigal membattu thittam mgsmt 2025-26 phase- i package no. tn05-01 in oddanchatram block of dindigul district - name of the work : 1. strengthening of the road from dindigul - mysore road to lakkaiyankottai km 0/0 - 0/800 (vpr 63)estimate amount : rs. 28.67 lakhs, a. construction work clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp., km 0/0 -0/800, earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per ss20a, km 0/0 -0/800, picking the existing worn - out wbm / bt surface using 5 - 10 cm thick including allcost andconveyance of all materials and all labour charges etc complete, km 0/0 -0/800, providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete., km 0/0 -0/800, providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it.. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification., km 0/0 -0/800, providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1 for 10sqm for preparatory to another bituminous construction over it including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.., km 0/0 -0/800, bituminous concrete 25 mm thick using cmp (grade-ii) providing and laying bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of vg30/vg40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the r
Tender For mudhalvarin grama salaigal membattu thittam mgsmt 2025-26 phase- i package no. tn05-09 in oddanchatram block of dindigul district - name of the work : 1. upgradation of the road from sindalaipatty west street to natchiyappagoundanvalasu road km 0/0 - 1/750 (r 628)estimate amount : rs. 57.29 lakhs, a. construction work clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp., km 0/0 - 1/750, earth work excavation from borrow pits for filling in all classes of soil except sand and hard rock etc with initial lead and lift for raising and widening the existing road sidedrain etc, complete.as per ss20a, km 0/0 - 1/750, providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete., km 0/0 - 1/750, providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface preparatory to another bituminous construction over it., km 0/0 - 1/750, providing and laying tack coat over wmm surface(treated with primer) using 2.5kg of bitumen emulsion rs-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,, km 0/0 - 1/750, bituminous concrete 25 mm thick using cmp (grade-ii) providing and laying bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of vg30/vg40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t cmp with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using cmp as per clauses 507 of morth part-5, km 0/0 - 1/750, providing and laying gravel soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete., km 0/0 - 1/750, provision for km stone, hm stone,guardstone,name board, logo board and cautionary sign boards etc., km stone, hm stone, provision for information board, provision for sign board, provision for road white marking, gst amount for providing service to government contract works for the above construction & maintenance works. { gst amount is the total gst amount for overall quoted amount (both construction and maintenance) above this row in column "bb" for all works in this package}(refer clause 13.2 & 13.3 of section 2 o