Get complete information related to latest Commutator Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Commutator Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Commutator Repair Tenders.
Tender For supply of sa of pipe nn hose , sa of fuel pipe feed pump to filter , clutch sleeve cylinder , major repair kit for motor cycle , bearing bush inner bkt , air compressor repair kit , fuel feed pump , joint , copper washer 18 dia , clamp hose , banjo belt
Tender For supply of door hinge -door hinge , oil dip stick , mounting pad , exhaust fan with motor , engine control unit , overflow pipe , fuel filter , voltmeter , ampere meter , fuel pipe tank to feed pump , fuel pipe pump to filter , fuel pipe filter to pump
Tender For corrigendum : supply of mechanical items at bnpm plant, mysore--, shaft for mixed flow pump, paper primary clarifier recirculation pump shaft, nitric acid pump shaft, paper daf centre support wheel, paper daf drive wheel, paper daf front wheel, pulp daf front wheel, wilo pump shaft, wilo pump shaft sleeve, paper daf scoop support wheel, toothed pulley for overlapping top rubber roll (item no.2), article:, 03790906, moc: ms, toothed pulley for overlapping top rubber roll (item no.1), article: 03790907, moc: ms, toothed drive pulley for stepped shaft b/w cc-1 & cc-2, article: 03701265, moc: ms, toothed drive pulley for paddle shaft,, article: 03721001, moc: al alloy,, hardness: 65hrb, drive timer pulley for sheeter overlapping motor, shaft for rewinder baby roll core adapter, bearing housing for rewinder baby roll core adapter,, end cover for rewinder baby roll core adapter bearing housing,, fly wheel (infeed drum) for sheeter in feed section,, roller for gate 2 & 3, article no: 03040137, roller for double gate, moc: en-19,, support plate for overlapping paddle shaft nde,, sliding rail for cross cutter motor,, inner shaft for paddle shaft in sheeter, paddle shaft for sheeter, sheeter gate frame
Tender For procurement of electrical gadgets for different units of otdc - electrical gadgets, supply & installation of equipments for different units of otdc across odisha including transportation. the quantity may vary as per requirement., supply, installation,testing and commissioning of stainless-steel body hood type automatic commercial dishwasher, pressure, single skin minimum capacity 60 rake/ hour etc as required of approved make complete with all materials, labour & transportation as per the direction of engineer-in-charge. technical details - archimedes drain technology (efficiency 83%), double flow pump, hitchtechnology wash arm should available in the commercial dish washer. ( make- ifb/ electrolux / dihr), supply, installation,testing and commissioning of commercial washer extractor with high spin, soft mount, bottom suspension, plc controlled stainless steel cabinet having 15kg capacity etc as required of approved make complete with all materials, labour & transportation as per the direction of engineer-in-charge. features like energy saving ie 3 motor, vfd controlled, 4 compartment automatic soap dispenser through plc, suspension with shock absorber & springs, door limit switch, electric interlock and emergency stop for safety & trouble-free operation, 2 hp, 3 ph, make fuji / equivalent, fully programmable logic controller (plc) with minimum 24 programs storage capacity with minimum 8 steps in each program, to customize the wash programs according to the type of the linen, 7 touch screen color display to visualize the step by step working process, easy to understand and program should available in the washer extractor. (make-ifb/ stefab/ electrolux), supply, installation, testing and commissioning of stainless-steel cylinder plc controlled, reversible 15kg capacity drying tumblers etc as required of approved make complete with all materials, labour & transportation as per the direction of engineer-in-charge. features like energy saving 0.5 hp ie3 motor. hem / equivalent make, tumble dryer has vfd for variable speed control, display: 7" touch screen color display, safety: magnetic door sensor, magnetic lint sensor & emergency push button, ss fine mesh for collect lint, energy saving 0.5 hp ie3 motor. hem / equivalent make of drive motor and and blower motor, vfd & plc are fully programmable logic controller and is equipped with the ability to store 25 programs with 6 steps in each program. to customize the programs according to the type of the linen, 7 touch screen color display to visualize the process temp. and time, provided 3 nos of wedges/lifter, made of stainless-steel self collecting lint screen, easily accessible front side (make- ifb / stefab / electrolux), supply, installation,testing and commissioning of front feed and front return type dry and ironing calander machine having roller size 1600mm x 400mm with roller speed 1 7 mtr/min (depends on fabric gsm (grams per square meter) etc as required of approved make complete with all materials, labour & transportation as per the direction of engineer-in-charge. features like 4.3 touch screen color display, front feeding tray should be provided with emergency finger guard, which automatically stops the machine. emergency stop buttons shall be provided on both side of themachine, 1 hp vfd provided for speed control, roller should be fully polished and hard chrome plated. (make-ifb / stefab / electrolux)
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin