Tender For supply of compositionbrakeblocks - high friction brakeblock for wdg4/wdp4 locomotives to drg. no. sk-dp 3630, alt.2, specification no. mp.0.0100-10 (rev- 05) febuary-2021 or latest. [ warranty period: 30 months after the date of delivery ]
Tender For supply of housing for traction bar as, per clw drg.no. 1209.01.113.002, alt-8 and rdso smi no.rdso/2006/el/0241, rev-0 dt.24.10.06 note: rites/tpi inspection is mandatory. each material to be tested separately and test repot to be submitted along with material. [ warranty period: 30 months after the date of delivery ]
Tender For supply of non-asbestos l type compositionbrakeblock for freight stock with 1000 mm wheel dia. drawing no. : rdsos drg. no. wd-99062-s-01, alt. 4. material and specification : rdsos spec. no. wd-13-abr-2019. [ warranty period: 18 months after the date of delivery ]
Tender For corrigendum : supply of non-asbestos "l" type compositionbrakeblock for freight stock for 840 mm wheel dia. as per drg.no. drg. no. contr-9404-s/11, alt-07. as per specn. wd-13-abr-2019. [ warranty period: 18 months after the date of delivery ]
Tender For corrigendum : supply of high pressure hydraulic system 2500 bar for pinion mounting and extraction for three phase traction motor as per annexture.. [ warranty period: 30 months after the date of delivery ]
Tender For supply of non-asbestos 'k' type compositionbrakeblock for blcs/boxns wagon to rdso drg. no. wd-15023-s-01, alt. nil conforming to rdso specification no. wd-14-abr-2019, specification as per annexure attached. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of traction bar/metal rubber bush for vande bharat train set coaches to gmt drg. no.65081502 rev-05. items are to be manufactured as per ms. ec engineering rubber metal elements specification no mt18br2001468-03. type drg: m/s gmt. [ warranty period:30 months after the date of delivery ]
Tender For corrigendum : supply of igbt based 3-phase drive propulsion equipment with physical medium i.e. esd/emd/ofg for multi functional vehicle bus (mvb) as per iec 61375, terminal bracket, bus bar link and cu braid required for connection between main transformer and traction converter, auxiliary converter, interfacing connectors,cables and cable loom required for connection from vcu 1/2 to sb1/2 panel. as per specification no. i) rdso/2008/el/spec/0071,rev.5 for igbtbased 3-phase drive propulsion equipment, ii) clw/es/3/ 0458 alt.e for control cables iii) clw/es/3/0459 alt.c for screened cable iv) clw/es/3/0124 alt.o. in addition to above description, the propulsion system should also comply requirement mentioned in "schedule of requirement" (sor).(warranty period:- 72 months after the date of delivery). make: atil only [ warranty period: 72 months after the date of delivery ]