Get complete information related to latest Compound Walling Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Compound Walling Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Compound Walling Tenders.
Tender For nagercoil corporation construction of sidewall raising and cover slab in mutharamman kovil theru and waiting shed arrangements at sannathi theru pds shop in ward no . 27
Tender For supply of set of lavatory sidewall for amrit bharat ac coaches (without primer). as per drawing no. a) 829-1-4-006 alt. nil: 1 no. b) 829-1-4-007 alt. nil: 1 no. c) 829-1-4-008 alt. nil: 1 no. d) 829-1-4-009 alt. nil: 1 no. note: a) drawing number: aaa51072 to be read as mvmc15013 alt. nil. b) in drawings "mig welding (131) is to be read as tig welding (141)" as per rcf design letter no md46231 dated 16.03.2024. packing instruction:p1030 rev. 0 [ warranty period: 84 months after the date of delivery ] ]
Tender For (for vande bharat) supply and fitment of matalic stainless steel pipe of dia 40mm along with adhesive as per make, weld on 45/ cresta bond m1-05/ loctite aah3151/ sikafast 3311/ plexus ma530 and provision of drain holes in sidewall of rmpu drain in vande bharat coaches. as per icf cai no. a-2023/06 [ warranty period: 30 months after the date of delivery ] ]
Tender For shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]
Tender For corrigendum : shell kit for memu tc2,tc3,tc4 jk 942,943,945 a. roof assembly 94516001 000 01 alt 'nil' - 1 no. location of sidewall 94514001 000 01 alt 'nil' - 1 no. end construction pail end 94515001 000 01 alt 'a' - 1 no. end construction non pail end 94515002 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status.01, rev.04 with amendment no.01 firm shall fulfill themanufacturing facility as per icf/md/spec- 315, issue status.01, rev.00 with amendment no.01. b.supply of one coach set of body shell items and partition frames for memu/tc/jk 941 to drawing nos: 1. 94410076 000 01 alt 'nil' - 2 nos. 2. 94510007 000 01 alt 'b' - 1 no. 3. 94510002 000 01 alt 'a' - 1 no. 4. 94410072 000 01 alt 'nil' - 2 nos. 5. 94410054 000 01 alt 'nil' - 4 nos. c. under frame arrangement 94211001 000 01 alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/spec-147, issue status.01, rev.02with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'f'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt 'a'. (a)raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : supply of set of lavatory sidewall for amrit bharat ac coaches (without primer). as per drawing no. a) 829-1-4-006 alt. nil: 1 no. b) 829-1-4-007 alt. nil: 1 no. c) 829-1-4-008 alt. nil: 1 no. d) 829-1-4-009 alt. nil: 1 no. note: a) drawing number: aaa51072 to be read as mvmc15013 alt. nil. b) in drawings "mig welding (131) is to be read as tig welding (141)" as per rcf design letter no md46231 dated 16.03.2024. packing instruction:p1030 rev. 0 [ warranty period: 84 months after the date of delivery ] ]
Tender For corrigendum : interlocking and sidewall construction work from the old hostel (hanuman temple) towards teacher colony in government inter college in orai city
Tender For supply of one coach set of sidewall details for lhb ac composite coaches to drg. nos. 1)frame work to drg. no 83214004, alt 'b' - 1 no. and 83214005, alt 'b' - 1 no. all the items to be supplied as loose. angle to drg no.aaa14809 alt'nil' in the roof flange assembly to besupplied as loose. 2) carline assembly to drg. nos. 83214008, alt 'c' - 1 no. and 83214009, alt'c' - 1 no. single piece crf carline to drg no 83214010 alt 'a' and 83214011 alt 'a' to be followed. 3) welding parts to drg. no. 83214003, alt 'g' - 1 no. and 83214018, alt 'c' - 1 no special condition : packing drawing: i. for frame work and welding parts icf/j&t/sk-1865, alt 'a' to be followed. ii. for carline icf/j&t/sk-1882, alt 'a' to be followed. to be supplied in packages of individual coach sets only. - all the threaded holes shall be provided with suitable dummy bolts to safeguard the threads to avoid clogging while painting.. [ warranty period: 30 months after the date of delivery ][quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]