Get complete information related to latest Contact Piece Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Contact Piece Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Contact Piece Tenders.
Tender For den/south/sbc sec : cess repair/widening work in connection with the work of (a) sbc-sa sec : complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60 kg/90 uts rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. (b) baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months or one monsoon period whichever is later.
Tender For chikbanavara - hassan section : sw i : construction of rcc drain for a length of 2.2 km in scattered locations between km 5/500-55/300 in aden/kunnigal section. sw ii : construction of rcc side drain 1000m and ballast retaining wall 1000m in connection with the work of baw-has : through ballast recoupment for a length of 110km from km 14/000-124/000 (sl). maintenance period is 6 months
Tender For sw i : bengaluru-salem section : construction of rcc drain 600m in connection with the work of sbc-sa sec : strengthening of bank by providing standard width and improving drainage at isolated locations from km 68/100 to 143/400 sl for a length of 17.26 km. sw ii : bengaluru - salem section : construction of rcc drain 3000m and ballast retaning wall 1900m in connection with the work of sbc-sa sec: complete track renewal (p) of existing 52kg rails on 52kg psc of 1540 nos/km with 60kg/90 uts rails and 60 kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (sl) in aden/dpj section. maintenance period is 6 months
Tender For bangalore - mysore section: construction of rrm drain and ballast retaining wall 1000m in connection with the work of complete track renewal (ctr(p)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in sse/p.way/kgi section. maintenance period is 6 months or one monsoon period whichever is later
Tender For providing of repair and overhauling service - 4034 surface preparation and maintenance painting work of ballast tanks fdn 2; ballast tanks fdn 2; yes; buyer premises
Tender For supply of contactpiece complete (contact tips for cgr) for n-32 tap changerspecification :- bt drg no-ag-540123-p1, bt pt.no.--s2529 aal drg no-9910383694001, aal pt.no.--g2529