Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - delivery at iti chh sambhajinagar; schedule1; no,repair, maintenance, and installation of plant/ systems/equipments (version 2) - delivery at iti chh sambhajinagar; schedule1; no,repair, maintenance, and installation of plant/ systems/equipments (version 2) - delivery at iti chh sambhajinagar; schedule1; no,repair, maintenance, and installation of plant/ systems/equipments (version 2) - delivery at iti chh sambhajinagar; schedule1; no,repair, maintenance, and installation of plant/ systems/equipments (version 2) - delivery at iti chh sambhajinagar; schedule1; no,repair, maintenance, and installation of plant/ systems/equipments (version 2) - delivery at iti chh sambhajinagar; schedule1; no,repair, maintenance, and installation of plant/ systems/equipments (version 2) - delivery at iti chh sambhajinagar; schedule 2; no,repair, maintenance, and installation of plant/ systems/equipments (version 2) - delivery at iti chh samb - steel rule-150mm,graduated both in metric and english unit , plier flat nose 100mm , hammer ball peen 250gms.with handle , screwdriver set of 5 pieces , adjustable spanner different sizes , neon (phase) tester 230 volt 05nos. , electric soldering iron 15/25watt pencil tip , tube cutter , allen key set (metric) set of six. , allen keyset(english set of six , soldering station temp. controlled , screwdriver 200mm , philips screwdriver 200mm , round nose pliers 150mm , fire extinguishers , wire type strain gauge (load cell/cantilever beam) , load cells of various ranges , digital type tachometer , digital panel meters voltage & , current , digital line frequency indicator , d.c. regulated power supply , digital insulation tester , digital multimeter , 51/2 digit bench top digital , multimeter , digital l.c.r. bridge , dso , decade resistance boxes , decade capacitance boxes , decade inductance boxes , operational amplifier trainer , trainer on basic digital electronics , trainers on power supplier's half , wave rectifier, full wave rectifier , scr driven/controlled power , discrete component trainer with , following seven basic modules , trainer on rs485 to rs232 , converter. , potentiometer/thermocouple test , set , auto transformer1and3 , calibration test bench for ac , and dc voltmeter, ac and dc , ammeter, ohmmeter , u tube manometers , well type manometer , inclined limb manometers , bourdon tube type gauges of , various ranges , capsule type pressure gauges , dead weight tester & comparator , pressure regulators with filter and , input & output gauges , differential pressure , transmitter (pneumatic) , differential pressure transmitter , (electronic-hart/field bus type , sensor trainer kit containing , following sensors , diaphragm type pressure gauges of , various ranges , pressure transducers training kits , experimental setup for pressure , measurement , hart device communicator and , calibrator , pneumatic calibrator , pressure switches of various ranges , p to i and i to p converters training , platform , vacuum tester with pump , vacuum gauge , simple tank type quantity meter , impeller type flow meter , helical and turbine flow meter , orifice type flow meter , venturitube flow meter rota meter , magnetic flow meter , vortex flow meter , flow control loop set with flow , controller recorder, , complete experimental set-up for flow measurement flow , measurement , experimental closed loop set up for , solid flow measurement , coriolis mass flow meter , flow nozzle , static pressure and air purge , type level indicator , level transmitter , interface)(hart/field bus/profi , bus compatible/rs485 ) , level control set up with level , transmitters controller & control , valve complete experimental setup , or level simulator , level measurement equipment for , solid, sonic solid level, microwave, , capacitance probes, point level , detector, vibrating for k type , mercury in glass thermometer ,
Tender For corrigendum : scope of workscope of work: - (at firms workshop):-1. dismantling of pump and internal checking of pump to analyse the defects.2. checking of impeller, cleaning of impeller and other internal parts.3. checking of stator and rotor can, replacement of ss seamless cans.4. proper fitting of impeller and balancing of impeller.5. checking of stator and rotor windings, rewinding of the same as per requirement.6. checking of bearing, voltage coils, rewinding of coils with class #h# insulation.7. replacement of defective internal parts, components, such as bearings, sleeves, washers, etc.8. testing of motor pump and painting of the body.9. successful trial of pump.10. material & service guarantee shall be applicable for 12 months from the o/h of pump.11. rewound stator shall be tested for winding resistance and compared with original.12. winding resistance of individual phase should not have more than 2% deviation to other phases.13. ir value of motor shall be recorded, before and after completion. complete test report with type of instrument used to be submitted at the time of handing over of the motor.14. motor assembly should be carried out by contractor so that no any damage to overhang portion of winding happen otherwise contractor shall be responsible and will have to repair again.terms and conditions: -1. all man power, t&p, consumables etc. shall be arranged by the firm.2. the firm have to make his own arrangement for transportation of defective pumps from the site to firm's workshop. similarly, the repaired pumps shall be delivered to our site.3. completion period: 5 days for to and fro transportation and 10 days for repairing work. total 15 days.4. payment term: 100 % payment shall be made within 45 days after completion of work satisfactorily on actual work done basis.5. contractual period: 18 months.6. the firm shall submit the gst invoice for payment of service through ra bill. however, release of bills of work as well as supply, the repaired / serviced pumps shall be run on trial for at least 01 hours continuously.7. penalty: penalty will be imposed @rs.1000/-per day or part thereof due to delay in work but limit to 10 % of order value if delay in completing the work.8. in the case of work at site/ plant premises.9. all safety precautions & safety rules shall be followed by the contractor, also necessary safety appliances like gloves, masks, helmet, shoes etc. shall be available to their labour during execution of work.10. if any labour of contractor meets with an accident because of not using the safety appliances, in such cases, if any fine/penalty is imposed on the occupier/factory manager of the power station, than the payment of amount of such fine/penalty or all legal compliance shall be meet out by the contractor.se (turbine)1x500 mw, cspgcl, kwb
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit; dismantling inspection overhauling assembly testing commissioning of emergency stop valve esv of drive turbine boiler feed water pump of sgp; as per scop..