Tender For corrigendum : expression of interest for preparation of detailed project report, tender documents for designing, detailed project report for construction of 10 mld water treatment works with complete automation and scada comprising of rcc inlet from kanwala minor, rcc storage & sedimentation tank, raw water pumping sump & pump house,water treatment plant comprising of stilling chamber, parshall flume or ventury flume, flash mixer for rapid mixing, clariflocculators for flocculation and settling swith sludge withdrawl, rapid gravity filters, chlorination, underground clear water tank, pump chamber and requisite pumping machinery, rising main from proposed s&s tank to wtp including cost of transformer, dg set, electrical, mechanical instrumentation works complete in all respect in sector – 24, urban estate ambala city.
Tender For sirsa town (p-2): augmentation of w/s scheme sirsa town constructing b/stns., additional structures and laying the internal distribution pipe lines at sirsa town district sirsa. (under amrut-2) “construction of 3rd w/w structures, mbs-1, mbs-2 and boosting stations including clear water tanks, pump chamber, boundary wall, pumping machinery, d.g set, electric transformer, gas chlorinator, rising main lines, fhtc and laying the distribution pipe lines etc. o and m during defect liability period of 12 months after successful completion of 3 months trial run and thereafter for 5 years complete in all respect
Tender For dnit name :sirsa town (p-1): augmentation of w/s scheme sirsa town constructing b/stns., additional structures and laying the internal distribution pipe lines at sirsa town district sirsa. (under amrut-2) “construction of 4.50 mld wtp at exist. 1st w/w, raw water pumping station and boosting stations including brick lined s/s tank, balancing capacity reservoir, inlet pipe, clear water tanks, pump chamber, boundary wall, pumping machinery, d.g set, electric transformer, gas chlorinator, rising main lines, fhtc and laying the distribution pipe lines etc. o and m during defect liability period of 12 months after successful completion of 3 months trial run and thereafter for 5 years complete in all respect.”
Tender For corrigendum : package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep