Get complete information related to latest Demolishing Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Demolishing Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Demolishing Work Tenders.
Tender For corrigendum : extra ordinary repair of ibb roads in the stretches under ibbr- 56,57,62,64,67,68,69,70,75 and link road (total length - 200.05 km), culvert repair 236 nos. and bridge painting -10 nos. in the state of west bengal and assam along ind-bangladesh border (ibb)). sh: earth work, culvert work, toe wall, dismantling and demolishingwork, road work and bridge painting in the stretches under ibbr 62,64,67,70,75 (package-i of length-112.37 km). sw- providing/supplying 01(one) no. inspection vehicle with driver for the use of assistant engineer, tufanganj border fencing sub-division, cpwd, cooch behar.
Tender For (a)transporting of all electrical equipment and dismantling of structure and all from material like ( switch and t/r etc.) from golden s/s to s/s at durga mandir of south tisra and (b) shifting of equipment at kalisthan sub-station jeenagora section - (a)(i) h.t. switch ( dismantling erection & re-installation of h.t. 7 nos.switch)- h.t. tape steelgrip tape copper nut bolt iron materials earthing patti, un-skilled 4 head x 1 shift (4 head x 7 nos=28 head), skilled 2 head x 1 shift ( 2 headx 7 nos=14 nos, semi-skilled 1 head x 1 shift, re-installing/arrangment of cable and switch, (ii) h.t. switch (dismantling erection & re-installation of l.t. 6 nos switch)- l.t. tape steelgrip tape copper nut bolt iron materials earthing patti, re-installing, un-skilled 2 head x 1 shift (2 head x 6 nos=12 head), skilled 1 head x 1 shift, semi-skilled 1 head x 1 shift, (iii) transformer -(dismantling erection & re-installation of 2 nostransformer )l.t. tape steelgrip tape copper nut bolt iron materials earthing patti & iron materials, re-installing/arrangment of cable and switch, un-skilled 2 head x 2 shift ( 4 head x 2 nos.), skilled 1 head x 2 shift ( 2 head x 2 nos.), semi-skilled 1 head x 2 shift ( 2 head x 2 nos.), (iv) cabal dismantling - cable dismantling, cable erection, dismantling of ab switch, erection of ab switch, dismantling of l type angle (40 nos) un-skilled 9 head x 2 shift, semi-skilled 9 head x 2 shift, dismantling of gate no.5 un-skilled 5 head x 2 shift, semi-skilled 5 head x 2 shift, dismantling of gi sheet ( 40 nos.) un-skilled 6 head x 2 shift, semi-skilled 6 head x 2 shift, (b) cable dismantling 120 sqmm, (i) (dismantling erection & re-installation of 2 nos. h.t.switch ,ht tap steelgrip tape copper nut bolt iron materials earthing patti 2 nos )- un-skilled 4 head x 2 shift, skilled 2 head x 2 shift, semi-skilled 1 head x 2 shift, re-installing/arrangment of cable and switch, (ii)dismantling 65mmx65mmx8mm(6mtrs) 15 nos. skilled 2 head x 2 shift, semi-skilled 4 head x 2 shift, (iii)cutting j huck & dismantling cgi sheet along with lowering all above sheet top to surface ( 10 feet x 3 feet)40 nos. skilled 2 head x 3 shift, semi-skilled 4 head x 3 shift, (iv)demolish rcc coloum for dismantling 4 nos. window clapsible gate skilled head x 4 shift, semi-skilled 5 head x 4 shift, total impact of gst for the purpose of ctc