Tender For complete manufacturing of the esp components, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet stores - complete manufacturing of hanging hook- 8x60x96 for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of ee holder dia 8mm for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of deflector - var 01 for esp , as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of shield for 400mm pitch for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of attachment iron for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of defl. plate for gd screens for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of shim for cedrive assy- var-01 for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete machining of shim for cedrive assy- var-02 for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of shim for cedrive assy -var-03 for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of atmt for ce sus agmt -var-02 for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of atmt for ce sus agmt -var-04 for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of ladder - 61720103 for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 120 days from po date., complete manufacturing of spanner for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of scoffolding bracket for esp, as per bhel approved drawings with vendors own raw material procured from bhel approved suppliers and supply of finished product directly to bhel bap ranipet/stores. delivery within 90 days from po date., complete manufacturing of grab bar - ii for esp, as per bhel approved drawings with vendors own raw material p
Tender For provision of ballast retainers on rub no. 88,92 & 94, replacement of protection screens on rob no. 219,220,221 & 239 and rcc side railing on rob no. 218a, 253a, strengthening of pier/pier cap, desilting of sump well and other minor repairs in the section of aden/sre.
Tender For replacement of damaged mother/liner plates in all the chutes of surge hoppers, vibrating screens, crushers, bypass chutes and belt feeder chutes and carrying out various patch welding works for all the chute leaks by welding with ms plates for all the chutes available in maint.-i (crushers) sub-divn. /chp (mm)-i&ii/dr.nttps as and when required during the period from 01.04.2025 to 31.03.2026.
Tender For corrigendum : set of different isolation cock screens of lhb coaches as per annexure-a (sample to be appro ved before bulk supply) [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : design, development,implementation,operation and maintenance of digital full colour led display screens at multiple locations in maharashtra
Tender For corrigendum : fabrication and replacement of mother plates and liner plates for discharge chutes of conveyor 1c,1d,3c,bfc,3d,3e,3f,4c ,rsfd,6c, uc2,crushers and screens discharge chutes, jt-7, jt-8, jt-9, rbf-1,2&3, conveyor 5c,5d,5e discharge chutes available in mmsd-ii/ mmd/chp/ rtpp for the year 2025-26