Web Analytics Made Easy - StatCounter

Ducting Assembly Tenders

Get complete information related to latest Ducting Assembly Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ducting Assembly Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ducting Assembly Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :38076006 Due date: 27 Nov, 202427 Nov, 2024 45.00 Lacs
Tender For repair replacement to central and package type air conditioning plants duct line and allied work at lc-i lc-ii and lc-iii site a site b and site c area at itr chandipur and repair replacement to central and package type air conditioning plants

State Government

CTN :38211416 Due date: 28 Nov, 202428 Nov, 2024 2.11 Lacs
Tender For scope of the work covers carrying out comprehensive annual maintenance contract of blue star make duct and packaged split type ac units installed at mghe power house, kpcl jog falls 577435 which includes preventive maintenance, breakdown maintenance, spares to be provided for maintaining continuity of work and replacement of defective parts of complete air conditioning system for a period of one year.

Central Government/Public Sector

CTN :37752530 Due date: 20 Nov, 202420 Nov, 2024 42.00 Lacs
Tender For corrigendum : sitc of 2 x 33 tr air cooled package type air conditioning plants - supply, installation, testing , commissioning of 33 tr capacity air cooled airconditioner , supply, installation, testing commissioning of 33tr capacity ,13200 cfm horizontal floor mounted double skin air handling unit , supply, installation, testing and commissioning of 3 phase vfd drives , supply and laying of 19 g copper pipe of size one and one eighth inches copper pipe for suction line with nitrile rubber insulation of 19mm thick , supply and laying of 19 g copper pipe of size five eighths inch with 13mm thick insulation for liquid line , supply, installation and testing of gss construction of 16g opposed blade volume control dampers , supply and installation of g.i perforated cable tray with top cover with supports , modification of existing plenum chamber , supply and installation of 32 mm dia cpvc or upvc drain piping insulated with 9mm nitrile rubber for ahu , supply installation testing and commissioning of electric control panel , supply and installation of remote status indication panel at control room , earthing , providing heat insulation treatment in ac plant room , providing under deck insulation , providing iron angle platform arrangement for outdoor condensing units , supply of 2 ft x 2 ft return air grills , provision of indicators for filter clogging and condenser clogging , dismantling and shifting of existing units , cooling towers, ahus , any other materials or works requirement to complete the sitc , belts for blower , pressure gauges for refrigerant and oil , dial type thermometer , air-filters , empty gas cylinder with regulating valve adopter and pressure gauge. , liquid line strainer , whirling psychro meter , anemometer , thermometer , valve key , thermal insulation of exposed duct out side the building bid number/ ( ( ) ): gem/2024/b/5460049 dated/* : 03-10-2024 bid document/ 2 1 / 28

State Government

CTN :38151293 Due date: 21 Nov, 202421 Nov, 2024 3.28 Lacs
Tender For comprehensive annual maintenance contract of total 13nos. of split type ac and 2 units duct ac installed at control room, turbine floor and generator hall at lph and chief office, hospital and guest houses located at talakalale and kargal 577421, sagar talluk, shimoga dist,karnataka.the scope of contract shall be to keep the air conditioners in normal working condition. attending to all breakdown and preventive maintenance of acs at lph, talakalale, kargal office,ib & hospital without any delay.the contractor shall supply and install the parts found defective for satisfactory maintenance of acs without any delay during the contract period as per the schedule list of spares. the contractor shall note down the equipment & accessories that are in service in present system.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract.compressors shall be replaced only when the existing compressor is found irreparable.spares to be provided for maintaining continuity of work.the successful service provider has to maintain ready stock of requisite spares in good condition throughout the comprehensive annual maintenance contract period to facilitate immediate replacement of defective parts.preventive maintenance for air conditioners.preventive maintenance shall be provided at least once in 3 months during prime shift hours of coverage at no extra cost. the firm shall monitor the performance of the systems, monitoring and cleaning, topping up of refrigerant gas, greasing of moving and running equipment, cleaning of filters etc., and give a report to the executive engineer(o&m)lph division head, kpc ltd.,breakdown maintenance for air conditioners-the agency should attend to all the breakdown call promptly & immediately.however in extreme case, if the spares not available immediately, repair shall be carried out within 2 weeks. efforts shall be made to rectify the system within 2 weeks. during the contract period the firm shall supply and install all parts found defective for satisfactory maintenance of air conditioners at no extra cost. it is the responsibility of the firm to bring all components to working condition. any leakage of gas in the piping/system shall be attended by the agency. filling up of refrigerant gas is also included in the scope of work. all repairs/rewinding/services related to the air conditioning system, electrical circuits, stabilizers, compressors or motors and all the accessories connected to ac system etc., are covered under comprehensive annual maintenance contract. all the spares and compressors are under the responsibility of the firm during contract period.replacement of defective parts-the firm shall supply and install all parts found defective during the comprehensive annual maintenance contract period in respect of acs at their own cost. original spares and compressors shall be used during contract period. in case of suitable replacement not available for defective components of air condition plant the firm shall undertake to provide a higher version components at no extra cost and the defective parts and components shall be handed over to kpcl.contract will be comprehensive in nature and maintenance and supply of spares, consumables and any component that is needed to keep system in healthy working condition is automatically covered in the scope of contract. compressors shall be replaced only when the existing compressor is found irreparable.

State Government

CTN :38092334 Due date: 20 Nov, 202420 Nov, 2024 25.75 Lacs
Tender For provision of false ceiling and renovation of air conditioning duct at rabindra bhavan auditorium umder s.d.d.mpty.
 Loading, Please wait...

Connect us via What's Up