Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
Tender For corrigendum : repair/maint of pump/ motor set and allied services and repair/maint of fire hydrant system and other connected work at air force station jaisalmer
Tender For supply of complete vehicle servicing washing and changing of engine oil diesel filter oil filter air filter and fitting , wheel alignment balancing and tyre rotation , replace of clutch plate pressure plate with clutch bearing , engine tunning and tappit settings , greasing of vehicle with unsv bearings sets , repair of gear lever assembly by replacing rubber joints , repair replacement of rear brake cylinder assembly , rapair of noisy differetail box assembly , repair replace of shaft penion joint assembly with bearing set 02 nos , new fittings of unsv tarpoline defence , replacement of wipper motor assembly , replacement of unsv brake linear front and rear , welding work on tail board joints , repair replace of air pressure maintain valve , minor denting painting work right mudguard , replacement of rear brake light assembly right
Tender For supply of complete vehicle servicing washing and changing of engine oil diesel filter oil filter air filter and fitting , wheel alignment balancing and tyre rotation , replace of unsv master brake cylinder assembly , repair of front spring leaf suspension with rubber bush joint arm ends and iron bushes , replacement of wipper motor , rapair of cracking noisy differential box with oil replacement , repair of noisy reverse gear assembly , repair of power steering assembly with oil leakage fault , replacement of mud flapes set , engine tunning and tappit settings , replacement of unsv horn , replacement of rear unsv shocker , wheel greasing with replacement of noisy bearings , replacement of unsv foot mat set
Tender For tender for supply and maintenance of drinking water supplies materials for 5 villages under kotehal gram panchayat including sc and st colonies 2025 26 - vrd_ktl_dw//ball vale pvc p 63 mm , vrd_ktl_dw//pvc pipe 6kg finolex 40 mm , vrd_ktl_dw//p v c pipe finolex 63 mm 4kg , vrd_ktl_dw//j k solution 100 ml , vrd_ktl_dw//repair coller finolex 75 mm , vrd_ktl_dw//reapere coller finolex 63 mm , vrd_ktl_dw//bore cap 2x10, vrd_ktl_dw//shallac , vrd_ktl_dw//pvc elbow (thread) 75x63 mm , vrd_ktl_dw//g i bend isi 50 mm , vrd_ktl_dw//g i nipple 50x1 mm , vrd_ktl_dw//gi coller heavy 50 mm , vrd_ktl_dw//ashirvad ci top & bottom adopter 50mm , vrd_ktl_dw//ashirvad column pipe 50mm , vrd_ktl_dw//g i nipple h 50x6, vrd_ktl_dw//trangel boll valve 50 mm , vrd_ktl_dw//moterunnati 7.5 h p 12 stg , vrd_ktl_dw//aluminium coil 300ft 10 mm , vrd_ktl_dw//clamp double nut bolts 2 heavy , vrd_ktl_dw//panel box big , vrd_ktl_dw//sub cable 4.0 sq mm , vrd_ktl_dw//pvc service shaddal finolex 63x25 mm , vrd_ktl_dw//spanner 22 mm , vrd_ktl_dw//pvc tee finolx 75 mm 6kg , vrd_ktl_dw//no-volt coil , vrd_ktl_dw//pvc elbow finolex 75 mm 6kg , vrd_ktl_dw//sj relay 20-32 a , vrd_ktl_dw//4kg pvc pipe finolex 75mm , vrd_ktl_dw//meet ball valve p 65 mm , vrd_ktl_dw//j k solvent 500 ml , vrd_ktl_dw//pvc elbow finolex 63 mm 6kg , vrd_ktl_dw//reapere coller 110 mm , vrd_ktl_dw//reapere coller 90 mm , vrd_ktl_dw//fta pvc 90 mm , vrd_ktl_dw//pvc coller 90 mm , vrd_ktl_dw//pvc coller 75 mm , vrd_ktl_dw//g i elbow 2 isi , vrd_ktl_dw//sp2 preventer , vrd_ktl_dw//motor panel board , vrd_ktl_dw//m t a pvc 63 mm , vrd_ktl_dw//amps fuse 100 , vrd_ktl_dw//flanz 110 mm , vrd_ktl_dw//sp 3 preventer , vrd_ktl_dw//auto starter , vrd_ktl_dw//gi tata pipe 50 mm , vrd_ktl_dw//finolex sub cable 2.5 sq mm , vrd_ktl_dw//bolt nut 12 mm , vrd_ktl_dw//stand assembly , vrd_ktl_dw//g i b nipple 20x24, vrd_ktl_dw//g i b nippe h 20x12, vrd_ktl_dw//g i coller 20 mm , vrd_ktl_dw//taper cock 20 mm , vrd_ktl_dw//pvc shaddle finolex 75x25 mm , vrd_ktl_dw//axel blade , vrd_ktl_dw//air valve , vrd_ktl_dw//aluminium coil 1000 feet 10 mm , vrd_ktl_dw//g i nipple 50x12 mm , vrd_ktl_dw//g i bend 50 mm , vrd_ktl_dw//g i coller 20 mm , vrd_ktl_dw//g i elbow 20 mm , vrd_ktl_dw//g i nipple 6inch 20 mm , vrd_ktl_dw//g i nipple 18inch 20 mm , vrd_ktl_dw//g i nippl 24inch 20 mm , vrd_ktl_dw//pvc ball valve 25 mm , vrd_ktl_dw//pvc ball valve 20 mm , vrd_ktl_dw//pvc ball valve 75 mm , vrd_ktl_dw//pvc coller 25 mm 8kg , vrd_ktl_dw//pvc coupler 90 mm 4kg , vrd_ktl_dw//g i coller 50 mm , vrd_ktl_dw//pvc r f t a 75x63 mm , vrd_ktl_dw//s l valve 65 mm , vrd_ktl_dw//pvc ball valve 40 mm , vrd_ktl_dw//pvc m t a 90 mm 6kg , vrd_ktl_dw//pvc thread elbow 90x75 mm , vrd_ktl_dw//pvc ball valve plane 110 mm , vrd_ktl_dw//pvc tee 90 mm 6kg , vrd_ktl_dw//pvc elbow 90 mm 6kg , vrd_ktl_dw//pvc end cap 63 mm 6kg , vrd_ktl_dw//f t a pvc 63 mm , vrd_ktl_dw//pvc elbow 75 mm 6kg , vrd_ktl_dw//l&t starter , vrd_ktl_dw//pvc fta 75 mm , vrd_ktl_dw//pvc fta 63 mm , vrd_ktl_dw//pvc rmta 75x63 mm , vrd_ktl_dw//pvc rmta 90x75 mm , vrd_ktl_dw//pvc rmta 90x 63 mm , vrd_ktl_dw//repair saddle 90 mm , vrd_ktl_dw//repair saddle 110 mm , vrd_ktl_dw//repair saddle 63x15 mm , vrd_ktl_dw//mtrering panel , vrd_ktl_dw//flanz 65 mm (slv) , vrd_ktl_dw//flanz 50 mm (slv) , vrd_ktl_dw//end cap 20 mm , vrd_ktl_dw//r c 75x63 mm , vrd_ktl_dw//m t a 15 mm , vrd_ktl_dw//f t a 15 mm , vrd_ktl_dw//f t a 25 mm , vrd_ktl_dw//ashirvad column pipe 32 mm , vrd_ktl_dw//g i nipple 36inch 20 mm , vrd_ktl_dw//gi nipple 6inch 15 mm , vrd_ktl_dw//g i nipple 6inch 50 mm , vrd_ktl_dw//g i elbow 50 mm , vrd_ktl_dw//pvc pipe 15 mm (1/2) , vrd_ktl_dw//pvc pipe 25 mm (3/4) , vrd_ktl_dw//g i nippl 18inch 50 mm , vrd_ktl_dw//pvc ball valve 90 mm , vrd_ktl_dw//pipe w.rench 14inch, vrd_ktl_dw//pipe w.rench 12inch, vrd_ktl_dw//dol starter (13-21a) , vrd_ktl_dw//l&t stater delta , vrd_ktl_dw//mangalam h d p pipe 3inch, vrd_ktl_dw//h d p g i nippal 3inch, vrd_ktl_dw//out door typ
Tender For supply of air filter screw compressor : : - 666500050301 air filter screw compressor c , 666500050302 oil filter element screw compressor c , 666500050303 motor grease screw compressor c , 666500050304 pre filter screw compressor c , 666500050305 air oil separator screw compressor c , 666500050306 coolant oil screw compressor c , 666500050307 coupling element screw compressor c , 666500050308 actuator repair kit screw compressor , 666500050309 nc intake valve screw compressor c , 666500050310 minimum pr valve kit screw compr c , 666500050311 service kit for bdv screw compr c , 666500050312 solenoid valve screw compressor c
Tender For corrigendum : supply of spares and repair of gem air dryers : -gem temperature controller for air dryer , valve auto drain 0.5 inch bsp for lp air dryer , valve auto drain 0.5 inchbsp for hp air dryer , electronic hot gas bypass valve solepcid 0.25 inch evu2 w coil , compressor kcm511 cal-e 510h for hp air dryer , motor fan -230mm, with impeller for lp air dryer , motor fan-300mm with impeller for hp air dryer , compressor kce432hag-s230h for lp air dryer , relay for gem make air dryer , service or repairing work