Tender For corrigendum : supply of mhpl pumps with vfd incl e & c spares and special tools tackles asper mr no. 1. a, 1. b & 1. c , mandatory spares as per mr sl. no. 1. d , spare strainer as per mr sl. no. 1. f , supervision of erection & commissioning of pumps as per mr sl. no. 1. g , comprehensive annual maintenance charges for 1st year as per mr sl. no. 1. h i , comprehensive annual maintenance charges for 2nd year as per mr sl. no. 1. h ii , comprehensive annual maintenance charges for 3rd year as per mr sl. no. 1. h iii , comprehensive annual maintenance charges for 4th year as per mr sl. no. 1. h iv , comprehensive annual maintenance charges for 5th year as per mr sl. no. 1. h v , comprehensive annual maintenance charges for 6th year as per mr sl. no. 1. h vi , comprehensive annual maintenance charges for 7th year as per mr sl. no. 1. h vii , comprehensive annual maintenance charges for 8th year as per mr sl. no. 1. h viii , training charges at site as per mr sl. no. 1 i , training charges at vfd works as per mr sl. no. 1 j , rgpl pumps with soft starter incl e&c spares & special tools tackles- as per mr no. 2. a, 2. b, 2. e , mandatory spares as per mr sl. no. 2. c , spare strainer as per mr sl. no. 2. f , supervision of erection and commissioning of pumps as per mr sl. no. 2. g , training charges at site as per mr sl. no. 2. h
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - non comprehensive annual maintenance contract on call out basis of schneider make vfd and soft starter installed at nmdc steel limited nagarnar; as per tender; as per te..
Tender For corrigendum : survey investigation design supply installation testing and commissioning of tank filling scheme head works consisting of construction of intake well with connecting pipe jack well cum pump house vertical turbine pumps coupled to motors pump house elec works necessaty valves delivery pipe manifold system electrical panel soft starter capacitors 11kv transformer 11 or 0.433 kv substation kv power line and 11kv terminal bay rising main pressure distribution for filling up of 5 nos of mi or zp tanks by lifting water from bhadra river near donabaghatta village of bhadravathi taluk including operation and maintainance for a period of 5 years after successful completion of work for donabaghatta tank filling scheme on turn key basis
Tender For repair and maintenance of various lwss/lis schemes under jal shakti division nahan in tehsil nahan distt. sirmour, hp (sh:-providing and fixing soft starter 40 hp and p/supplying of submersible cable single core cable busbar to panel 6 mm , 4 mm , 2.5 mm at lwss kotri, lis khajurna under section shambhuwala) job-i
Tender For repair and maintenance of various lwss/lis schemes under jal shakti division nahan in tehsil nahan distt. sirmour, hp (sh:-providing and fixing soft starter 30 hp and p/supplying of submersible cable single core cable busbar to panel 6 mm , 4 mm , 2.5 mm at lwss kotri, lis khajurna under section shambhuwala) job-ii
Tender For repair and maintenance of various lwss/lis schemes under jal shakti division nahan in tehsil nahan distt. sirmour, hp (sh:-providing and fixing soft starter 25 hp and p/supplying of submersible cable single core cable busbar to panel 75 mm at lwss dhakwali ganesh ka bag under section shambhuwala) job-iii
Tender For survey, investigation, design, supply, erection, testing and commissioning of required number of vertical turbine pumps coupled to ht motor for providing irrigation facility to suffering atchkat 2847 ha. of lateral no.27 to 32 of dy.no.6 of shahapur branch canal from karnal nala under karnal lis in shorapur taluk yadagir district viz., construction of diversion weir, intake forebay, jackwell cum pump house, manifold along with electrical panel, soft starter, capacitor, 11 kv power transformers, ht bus bar / cabling, 11/6.6 kv sub-station, power line and 11 kv terminal bay, ms rising main, valves and construction of delivery chamber, erm to lateral 27 & 31 of d-6 (selected reach) supply of spare, accessories and tools including operation & maintenance of the entire system for five years from the date of successful commissioning of karnal lift irrigation scheme on turnkey basis.