Tender For corrigendum : consultancyservices for preparation of detailed project report for development of samba mansar udhampur road to four/six lane nh standards in the ut of jnk.
Tender For corrigendum : consultancyservices for preparation of detailed project report (dpr) for four laning of ka-tn border-coimbatore section (tentative length 120 km) of nh-948 in tamil nadu
Tender For corrigendum : consultancyservices for preparation of detailed project report for four laning of ramanathapuram-dhanushkodi section (tentative length 74 km) of nh-87 in tamil nadu
Tender For corrigendum : consultancyservices for preparation of detailed project report (dpr) for construction of a new 4-lane outer ring road around latur city in the state of maharashtra-2nd call
Tender For carrying out a geotechnical survey, soil investigation and submission of a detailed geotechnical investigation report for a proposed project located at cotton green and surrounding area, mumbai, covering an approximate area of 320 hectare.
Tender For carrying out a geotechnical survey / soil investigation and submission of a detailed geotechnical investigation report for a proposed project located at cotton green and surrounding area, mumbai, covering an approximate area of 320 hectare.
Tender For revision of master plan and concept design and preparation of detailed design and detailed project report (dpr) for the development of the baba hariharnath temple corridor in saran district.
Tender For inviting request for proposal for appointment of consultant for preparation of detailed project report of mixed / residential land use project for chhata awasiya yojna, mathura
Tender For appointment of pmc for feasibility studies, detailed project report, ppp advisory, supervision and bid process management for establishment of state-of-the-art wholesale fish market, aqua park and fish processing unit
Tender For corrigendum : recruitment of consulting firm for preparation of pre-feasibility report, detailed project report including cost estimates, tender document for the project of increasing the capacity of stp, construction of pumping station, recycling of treated was