Web Analytics Made Easy - StatCounter

Evaporator Blower Tenders

Get complete information related to latest Evaporator Blower Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Evaporator Blower Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Evaporator Blower Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government / Public Sector

CTN :39587396 Due date: 20 Mar, 202520 Mar, 2025 NA
Tender For supply of scavenge blower to tm/oil cooling

Central Government / Public Sector

CTN :39587435 Due date: 14 Mar, 202514 Mar, 2025 NA
Tender For supply of scavenge blower to tm/oil cooling

Central Government / Public Sector

CTN :39587449 Due date: 25 Mar, 202525 Mar, 2025 NA
Tender For supply of scavenge blower to mr blower including

Central Government/Public Sector

CTN :39587495 Due date: 17 Mar, 202517 Mar, 2025 NA
Tender For supply of scavenge blower to mr blower including

Central Government / Public Sector

CTN :39588152 Due date: 20 Mar, 202520 Mar, 2025 NA
Tender For supply of scavenge blower to tm/oil cooling unit

CTN :39446340 Due date: 04 Mar, 202504 Mar, 2025 15.62 Lacs
Tender For tender for supply of maintenance of pac and vrf ac units - conducting pressure hold testing of ac units for identification of leaks as per sl.no. 1 of scope of work. , arresting of leaks in pac and vrf refrigeration circuits by brazing as per sl.no. 2 of scope of work , charging of refrigerant in refrigeration circuits as per sl.no. 3 of scope of work , supply and installation of 0.37kw capacity new condenser fan motor with leaf as per sl.no. 4 of scope of work , supply and installation of 1.1kw capacity condenser fan motor with leaf. as per sl.no. 5 of scope of work , supply and installation of pac units mother boards with step down transformer and related circuit board. as per sl.no. 6 of scope of work , supply and installation of refrigerant dryers in refrigeration circuits as per sl.no. 7 of scope of work , supply and installation of lp and or hp switches in pac units. as per sl.no. 8 of scope of work , daily switching on and switching off of pacs and vrf ac units in old admin building , psb and simulator building as per sl.no. 9 of scope of work , replacement of belts and alignment of motor with evaporator blower as per sl.no. 10 of scope of work. , cleaning of filters from pac units and fixing back to original location as per sl.no. 11 of scope of work. , fabrication and installation of vrf condenser unit support structure at simulator building as per sl.no. 12 of scope of work. , supply and installation and commissioning of r22 compatible 5.5tr scroll compressor in pac units as per sl.no. 13 of scope of work. , supply and installation and commissioning of r410a compatible 6tr scroll compressor in vrf ac units as per sl.no. 14 of scope of work. , supply and installation of remote controller with control boards for pac units as per sl.no. 15 of scope of work.

CTN :39403666 Due date: 12 Mar, 202512 Mar, 2025 NA
Tender For supply of evaporator blower motor for tat ac 2 ton

Central Government / Public Sector

CTN :39349748 Due date: 10 Mar, 202510 Mar, 2025 NA
Tender For supply of scavenge blower for machine room as per as per clw spec.no. clw/es/3/0022 alt-h or lates t and motor for scavenge blower(mr) (wound with corona resistance wire) as per rdso spec no.e 10/3/09 motor with amnd 01 to 06 or latest, clw spec.no. clw/es/3/0022 alt-h or latest. note: blower vendors mus t offer only clw approved brands for motor or vice-versa duly coupled as set, indicated above. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39264744 Due date: 07 Mar, 202507 Mar, 2025 NA
Tender For supply of scavenge blower to tm/oil cooling unit including motor (wound with corona resistance wire ) to specn. no.(i) clw/es/3/0021 alt-h & (ii) rdso spec/e-10/3/09 with amendment 1 to 6 (motor) [ warr anty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up