Web Analytics Made Easy - StatCounter

Field Preparation Tenders

Get complete information related to latest Field Preparation Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Field Preparation Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Field Preparation Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :43302722 Due date: 13 Jan, 202613 Jan, 2026 27.50 Lacs
Tender For welcome maintenance and repair/replacement of fencing, hardstanding and other connected miscellaneous br works at site (r) in af stn thane under ge (af)thane

Central Government/Public Sector

CTN :43063102 Due date: 02 Jan, 202602 Jan, 2026 27.21 Lacs
Tender For corrigendum : special repair to building no. ewt-24 at 114 inf bn (ta) jat fatehgarh cantt site-iii area

State Government

CTN :43339949 Due date: 09 Jan, 202609 Jan, 2026 NA
Tender For in-situ repair of worn out bowl hub by undercut/ metal filling / machining and fitment of split sleeve at site at bm-iii unit 8&9,cstps, chandrapur

State Government

CTN :43313080 Due date: 07 Jan, 202607 Jan, 2026 2.91 Lacs
Tender For repair of faulty power transformers 5, 8, 10 & 12.5mva, 33/11kv of various makes available at various 33/11kv sub-station of mescom jurisdiction including transportation from site to repair bay and from repair bay to site as decided by mescom along with testing and commissioning after repair on percentage basis under rate contract.

Central Government And Public Sector

CTN :43317379 Due date: 29 Dec, 202529 Dec, 2025 NA
Tender For repair and renovation work at site elgin bridge under ursd cwc, gonda

State Government

CTN :43328472 Due date: 22 Jan, 202622 Jan, 2026 13.27 Lacs
Tender For annual operation and maintenance of iep (pressure type)hw site and 3rd site, day to day operation, maintenance and emergent repair at uttar nazirpur distribution zone in english bazar block under malda arsenic area w/s divn, phe dte. for one year.

State Government

CTN :43297266 Due date: 30 Dec, 202530 Dec, 2025 12.70 Lacs
Tender For maintenance and repair to dhaderakoppa, jeevapur, hooli (site-2), hooli (site-3) barrage/bcb in savadatti taluka, dist-belagavi (2702/2025-26) (category-2a)

corporations/Associations/Others

CTN :43261557 Due date: 26 Dec, 202526 Dec, 2025 7.15 Lacs
Tender For tiruppur corporation_z1_gf_maintenance and special repair work and providing and fixing of equipments tools and plants to the micro compost centre at athupalayam in ward no 10 - supply and fixing of sanitary napkin destroyer machine machine with storage capacity of 100 napkins per day with dimension of 220mm x 220mm x 360mm of wall mounting style no 1 pcs etc., complete., supply and fixing of pest controller of 64w with 360 inser killer etc., complete., dismantling the existing plain cement concrete including removing the debris from the site and stacking useful material at work site for reuse etc., complete complying with standard specification., earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete., plain cement concrete 1:4:8 [one cement, four m-sand and eight course aggregates] using 40mm size hard broken/machine crushed granite stone jelly including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., complete complying with standard specification., supply and delivery fixing of pvc chamber 2way 90 with cover size of 315mm x 110mm with chamber riser size of 315mm x 200mm including transporting etc.,, chambers, riser, plastering with cement mortar 1:4 mix (one cement four p-sand), 20mm thick in all floors using clean screened m-sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification., plastering with cement mortar 1:5 mix (one cement five p-sand), 12mm thick in all floors using clean screened m-sand and including cost of curing for fifteen days from the completion of the work and surface should free from undulations and including the cost of preparing the surface for plastering and protecting from other damages till setting of mortar etc., complete complying with standard specification., painting two coats with ready mixed plastic emulsion paint (weather proof) of approved quality and colour over a priming coat, including thorough scraping, clean removal of dirt and including necessary plaster of paris, putty wherever required etc., complete as per standard specifications., wring with 2 x1.5 sqmm (22/0.3) pvc insulated sc unsheathed cu conductor of 1100v grade in suitable pvc rigid pipe concealed in wall and ceiling with pvc accessories in flush with wall with 3mm thick hylum sheet cover with tw switch box and 5a f.t switch with continous earth wire connection of 14 swg tc wire for making good of the concealed portion with suitable color of pvc concealed light point / fan point (for electronic regulator ), supply and fixing of 200w 4 feet led fitting as per standard specificatin., supply and fixing of 1200mm (48") sweep ac ceiling fan complete with stepped electronic 300w regulator with 1 metre down rod with fan clamp with side plates and cross arm of size 450mm (18")., supply and fixing of wall mounting 450mm sweep fan etc.,, supply and fixing of roof ventilator fan etc.,, replacement of underground utilities hdpe pipe damaged during earthwork excavations for pipe laying works including cost of additional earthwork excavation in all soils, including bt cutting, cc roads , removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of hdpe pipes, couplers, jointing materials and required specials, cutting, threading, conveying , laying, jointing and

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin
 Loading, Please wait...

Connect us via What's Up