Web Analytics Made Easy - StatCounter

Fire Protection Equipments Tenders

Get complete information related to latest Fire Protection Equipments Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Fire Protection Equipments Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Fire Protection Equipments Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government / Public Sector

CTN :44738412 Due date: 17 Apr, 202617 Apr, 2026 NA
Tender For auction sale of rolling stock - coaches - scrap cond. under aged/over aged, burnt bg 8-wheeler icf/rcf/beml/lhb coaches without wheel sets cum trolleys and other mechanical, electrical rc items. coach nos are (1) 93736 re, 2] 037106 wgaccn, 3] 997424 gs, 4] 997728 gslr, 5] 05410 c gs, 6] 216660 ls, 7] er218640 lvph, 8] nr 215392 lvph. ds-8 nos 013778-25-37431,37427 dt. 12.03.2026, 013778-25-35481, 35474, 35485, 35491,35456, 35454, dt.25.02.2026. total weight of 08 coaches - 198.6719 mt approx. [ms-120.7286 mt approx., aluminum=5.0007 mt approx., copper=0.1997 mt approx, ss=2.327 mt approx., decolums, compreg sheet, wool and limpet, berths, seats and rexene=13.2 mt approx., corten/mild steel-26.3195 mt approx., ss ferritic 409 m-24.6026 mt approx., ss austenitic 304 -6.2938 mt approx.,]. loc- lying on the track at tata siding mly. note- 1] the purchaser is strictly instructed to stack all the rc items at one location well away from the cut-up parts of the coaches and the custodian is advised to lift the same on the day of delivery affected. [before affecting/ commencing/starting of the delivery itself]. 2] the purchaser is responsible for providing adequate safety firefighting equipment on the spot at the time of cutting and delivery. the purchaser shall be liable to make good any damage/loss caused to railway property during cutting or delivery. 3] railways are not responsible for any shortage. 4] any reclaimable items found in excess to the below, at the time of cutting and delivery of coaches should be returned to railways 5] the purchaser is instructed to remove all debris arising from cutting of the lot purchased, from the cutting/loading spot and keep the delivery spot neat and clean before the final lorry delivery, failing which, the final lorry will be stopped. 6] it is advised that all witnessing officials has to sign the debris clearance certificate at the time of closing delivery order. 7) delivery by number basis.8] as per railway boards letter dt.23/12/2021, 3 days advance intimation is to be given to rpf for witnessing of deliveries. the same has been reiterated by dsc/rpf/sc vide letter dated 22/09/2025. firms are therefore requested to take this period into consideration while uploading their requests for delivery so that deliveries are completed on time, well within the fdp. pl no. 98111061. hsn code 72042910. available under sse cnw sc, state tg dist. hyb

CTN :44334479 Due date: 06 Apr, 202606 Apr, 2026 21.69 Crore
Tender For corrigendum : replacement and upgradation of critical building infrastructure and systems at rites shikhar, including dismantling of old hvac and ff system and supply, installation, testing and commissioning of hvac system along with associated equipment and services, ff,fda and integration with bms system - replacement and upgradation of critical building infrastructure and system at rites, shikhar, plot no. 1, sector 29, gurugram including dismantling of old hvac and fire firefighting and sitc of hvac system along with associated equipment and services, firefighting system, fire detection system and integration with bms system.

CTN :44611458 Due date: 01 Apr, 202601 Apr, 2026 1.37 Lacs
Tender For maintenance of electrical installation & fans in all residential and non-residential buildings, o/m of electrical and mechanical equipments including repair and maintenance of pump sets, substation equipments, dg sets and oh lines at svpnpa, shivarampally, hyderabad. sh: operation of 33 kv substation, operation & maintenance of 11 kv substation, iei & fans, street lights pump sets, fire alarm, firefighting equipment during the year 2025-2026. sh: supplying, installation, testing and commissioning of 2 kva online ups at substation of site-b of svp npa, hyderabadsubwork/packages:supplying, installation, testing and commissioning of 2 kva online ups at substaiton of site-b of svp npa, hyderabad

CTN :44651955 Due date: 30 Mar, 202630 Mar, 2026 3.36 Lacs
Tender For maintenance of electrical installation & fans in all residential and non-residential buildings, o/m of electrical and mechanical equipments including repair and maintenance of pump sets, substation equipments, dg sets and oh lines at svpnpa, shivarampally, hyderabad. sh: operation of 33 kv substation, operation & maintenance of 11 kv substation, iei & fans, street lights pump sets, dg sets, fire alarm, firefighting equipment during the year 2025-2026. sh: inspection of hydraulic lift and miscellaneous works at old library of svp npa, hyderabad.subwork/packages:sh: inspection of hydraulic lift and miscellaneous works at old library of svp npa, hyderabad.

CTN :44553234 Due date: 19 Mar, 202619 Mar, 2026 3.23 Crore
Tender For firefighting works including the installation of firefighting equipment, construction of a pump house, and an underground water tank in various buildings of the civil judge (cjm) court premises and district judge (dj) court premises in the civil court, jamui.

CTN :44561918 Due date: 10 Apr, 202610 Apr, 2026 NA
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - commercial; electrical system or installation, furniture, medical equipment and devices, construction work, power generators, air purifier, pipelines, firefighting syste..

Corporations And Associations And Others

CTN :44499659 Due date: 06 Apr, 202606 Apr, 2026 NA
Tender For open tender for hiring of quick response vehicles (qrv) along with firefighting equipment, tools and tackles and dedicated manpower to respond to fire and gas emergencies across sgl operational area for a period of 3 years.
 Loading, Please wait...

Connect us via What's Up