Web Analytics Made Easy - StatCounter

Kashipur Tenders

Get complete information related to latest Kashipur Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Kashipur Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Kashipur Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :42035444 Due date: 27 Oct, 202527 Oct, 2025 NA
Tender For work of replacement of punctured disc insulators string by anti-pollution polymer disc insulator strings at various towers at 132 kv kashipur-ramnagar(d/c) line connected to 132 kv sub-station, ramnagar

CTN :42035450 Due date: 27 Oct, 202527 Oct, 2025 NA
Tender For supply and fixing of fire extinguishers system in cable vault of control room building at 400kv substation kashipur

CTN :42035446 Due date: 27 Oct, 202527 Oct, 2025 NA
Tender For work of strengthening of earthing at various tower locations of 132kv transmission line associated with 132 kv sub-station, ramnagar.

CTN :42035440 Due date: 27 Oct, 202527 Oct, 2025 NA
Tender For work of annual hotspot scanning of 132kv lines connected to different substations under 132kv oandm division, kashipur

CTN :42035445 Due date: 27 Oct, 202527 Oct, 2025 NA
Tender For work of construction of new protection wall for protection of tower no 33 of 132 kv kashipur(400 kv)-bazpur d/c line connected to 132 kv sub-station bazpur.

CTN :42035439 Due date: 27 Oct, 202527 Oct, 2025 NA
Tender For work of making new protection wall for safety of tower no. 92 of 400kv d/c kashipur-dhampur line and various tower revetment related work for 400kv dhampur-nehtaur s/c line at 400kv substation kashipur

CTN :42035449 Due date: 27 Oct, 202527 Oct, 2025 NA
Tender For work of construction of new open store shed at 132kv substation bazpur

CTN :42035442 Due date: 27 Oct, 202527 Oct, 2025 NA
Tender For work of providing and fixing of cctv camera alongwith related accessories at 132 kv sub-station, bazpur & 132 kv sub-station, ramnagar

CTN :42035470 Due date: 15 Oct, 202515 Oct, 2025 1.29 Crore
Tender For construction work of 20 nos shops at proposed land at mpacks jhabreda kisan sewa sahakari samiti ltd.,district haridwar (block-d)

corporations/Associations/Others

CTN :42063030 Due date: 06 Oct, 202506 Oct, 2025 1.00 Crore
Tender For supply of electric slaughterhouse (for animals) - primary & secondary chamber primary chamber* single chmber furnace of size 4270 mm x 1980 mm x 1820 mm.* plate thickness- 5 to 8 mm.* lining of interior of furnace- 400 mm wall cermaic blanketk, high aluminia refractory brick is-8-1994 line with insulation brick is 2042-2006* operation temperature- 800o c to 1000o c.* top smoke discharge for secondary chamber.* ash removal doors to be provided for ash collection after combustion.* ingtion- automatic.* temperature control- automatic* material loading- front gate- automaticsecondary chamber* operating temperature - 1050o c to 1250o c.* material of construction- mild steel with high aluminia refractory brick is-8-1994 line with insulation brick is 2042-2006.* made from is 2062 grade mild steel materials (or better) duty lined with insulation bricks, refractory bricks, hysil boards.* burner mounting arrangement with refractory burner block.furnace door:furnace door charging & discharging side fabricated from 5mm to 6 mm thickness door opening & closing automatic.ash door:* ash door (with casted cement lining) to remove nonhazardous ash from the chamber.* top inlet bottom smoke discharge for longer gas residence time.* furnace door charging & discharging side fabricated from 5mm to 6 mm thickness.* door opening & closing automatic/manual.refractory:{complete set of refractory shaped bricks for construction electric cremation of i.s. 8 bricks (approx. 1007nos bricks,insulation 4000 nos. refractory slid for construction of flue duct , as required, refractory heat resistant fire clay , ceramic blanket hysil board, asbestos ropes etc. as required for outer side of the furnace shall be constructed by red bricks by sand and cement as mortars and construction of chimney from basement of roof level including painting i.e. bricks portion shall be painted by two coats of red oxide as primer and to coats of synthetic enamel. (a) complete lining & assembling of entire cremation chamber according to standard size with proper arrangement of accommodation of heating elements, resting of dead body with sufficient opening for falling of ashes to the ash chamber & sufficient ventilation for fresh air spraying. (b) complete lining and assembling of entire cremation chamber according to standard size with provision of drawing out aces from the rear side and sufficient ventilation for fresh air injection. complete lining and assembling of entire cremation chamber according to the standard size with provision of air inlet supplying by fresh air blower and arrangement of multi ventilation path for fresh air}. osspl make, thermocouple heat sensor supply & fixing the thermocouple of heat sensing range 0 - 1200 c (cr.-al) sensor housed in s.s 304 casing of dimension 1200 mm long 22 mm od complete encased to and fitted terminal on other and for connection of compensating of 2 cores 0.5 aq. mm cr- al for heat sensing from thermocouple to temperature controller covered with asbestos embedded rope about 50 m length as per direction of eic., f.d. fan/centrifugal air blower with electric motor * supply and delivery at site, installation, testing and commissioing.* of fresh air injection system forced draft fan mild steel.* type: centrifugal.* capacity:- 500 cmh.* pressure:- 220 mmwg.* motor rating:- 2hp (kirloskar/crompton), burner assembly * total 2 nos. of lpg/cng/png fired automatic burner required.* the burner should be provided with comprising diffuser plate/ burner plate, photo cell housing electrodes with holding brackets, solenoid valve, electrodes caps, flexible hose pipes, spary nozzles, oil filter, blower, etc. connected with electric motor (each burner) & in built air regulator.* burners will work on auto on/off as per the set temperature for the combustion chambers.* the in-built bolwer will provide continuous air flow to the burners to prevent demages due to high temperature., supply and fixing of manifold with a p
 Loading, Please wait...

Connect us via What's Up