Tender For supply of engg allowance list phase ii for y12651 of p17a - case for using chem samples make dewalt y 12651 , box for storage of chemical samples dewa y 12651 , ear defenders 3m peltor x series over y 12651 , paint spraying equipment 230v model pilo y 12651 , heavy duty hot wire cfm thermo anemomete y 12651 , sight flow funnel indicator dia 32mm y 12651 , sight flow funnel indicator dia 65mm y 12651 , sight flow funnel indicator dia 20mm y 12651 , portable digital multimeter fluke 179 y 12651 , pen drives sandisk 2tb extreme pro ssd p y 12651 , induction heater linmast part no lbh4 y 12651 , helmet with torch helmet with head lamp y 12651 , optic fiber optical repair kit proskit y 12651 , oscilloscope metrix tetronix tbs1052c y 12651 , boiler disinfection bajaj auto ketiles c y 12651 , high voltage class b elastomer insulat y 12651 , portable welding machine yeswelder ar y 12651 , arc sensitive welding helmet roebll au y 12651 , table for pc s y 12651 , floor cleaning detergent 5 ltr jerry can y 12651 , mop handle holder andpads make upyog spin y 12651 , set of tools for milling machine for ste y 12651 , inspection lamp facom model 779 eye y 12651 , sets of drilling bits for drilling mach y 12651 , see thru gauges for use in tank level in y 12651 , recordable dvd verbatim y 12651 , various chemicals for lab potassium dic y 12651 , silver rods for brazing y 12651 , recordable cd verbatim cap 4 7 gb y 12651 , infrared camera fluke 726 precision mul y 12651 , photo luminiscent sticker strip with bla y 12651 , mild steel phoenix platform scales mode y 12651 , lan tester fluke network tester msr ttk y 12651 , ethernet connection with cap rj45 shiel y 12651 , hot air gun with temperature control exc y 12651 , kent supreme plus 2020 11112 zero wa y 12651 , facom chipping hammer set v 321ah pneu y 12651 , floor cleaning machine eureka e51 pr y 12651 , fluke 381 clamp meter with iflex tong y 12651 , s wrap polymer sticks sealing compound y 12651 , s wrap polymer general purpose y 12651 , industrial laser cleaning machine mapis y 12651 , sonic industrial imager to detect gas le y 12651 , valve refacer machine pathak industries y 12651 , frequency generator fluke 789 y 12651 , laptop hp victus intel core i7 13th gen y 12651 , refrigerant analyser cosmos xp 704 ill r y 12651 , electric tricylce mahindra treo zor 10hp y 12651
Tender For supply of laboratory and scientific equipment - repair of thermal evaporator system, qsv 4 butterfly valve (details as per sl no 1 at annexure-a)., qsv 1 butterfly valve (details as per sl no 2 at annexure-a)., variac : required for controlling (increasing & decreasing) the voltage of the power from lt & ht transformer (details as per sl no 3 at annexure-a)., ht board : required for operating the discharge current for ion cleaning of the substrate by ion bombardment gadget. (details as per sl no 4 at annexure-a)., replacement of o rings : set of neoprene o rings required for the valves, chamber gadgetry, kf clamps, dp, lnt & collar. (details as per sl no 5 at annexure-a)., needle valve : manually operated fine control needle valve provided for controlled admittance for inert gas into the chamber (details as per sl no 6 at annexure-a)., quartz tube adopter : ss adopter for fixing on both sides of the quartz tube with provision for fixing valve, pressure gauges and pipeline to vacuum pump. (details as per sl no 7 at annexure-a., to pu 10 ball valve (details as per sl no 8 at annexure-a)., servicing of rotary pump (details as per sl no 9 at annexure-a)., servicing of pirani and penning gauges. (details as per sl no 10 at annexure-a)., servicing charges of the coating unit (details as per sl no 11 at annexure-a).
Tender For supply of nylon bristle brush with long handle grip for cleaning of equipment in repair s ection. [ warranty period: 30 months after the date of delivery ]
Tender For custom bid for services - pdm1b24334 agency for hydro testing and ibr liaison during repair maintenance schedule testing of boilers hrsg ibr exchanger ibr vessels and other ibr equipment for power plant and other units of refinery during normal operation and shutdown-1) carbon steel piping for hydrocarbon services (with welding electrode e-6010 / e-7018) - units transportation of all piping items from owner's storage points to work site and / or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawing etc., threading, laying, erection and alignment of pipes upto a height of 5 meters on sleepers, pipe racks etc. or upto 5 meters depth in trenches, anchoring wherever required, connecting with equipment, nozzles, steam traps, strainers, orifice assemblies (including tapping upto first block valve), spray nozzles, rotameters; tapping for instrument connections like pressure gauges, thermowells, sample connections, vents, drains etc. including fixing of all types of sw valves, gaskets, nuts and bolts, all inline instruments, elbows, tees, flanges, reducers, full coupling or half coupling, reinforcement pads, earthing strip wherever required; welding prefabricated shoes and supports (including alignment) as per the drawings including preparation of small bore isometrics upto 1.5 inch nb, specifications, codes etc. and as per the instructions of the engineer-in-charge to his entire satisfaction. the scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, flushing wherever required, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the engineer-in-charge., 2) provision of reinforcement pad (with welding electrode e-6010 / e-7018) transportation from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation as per the instructions of the engineer-in-charge to his entire satisfaction. the scope also includes supplying of all types of tools and tackles, lifting arrangements, equipment, machineries, all consumables and labour etc. to complete the work in all respects including area preparation for hot jobs, area cleaning after completion of work, pneumatic testing, cleaning of pipes externally off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the engineer-in-charge. 3) extra for ibr grade carbon steel piping joints. for ibr piping jobs, the scope of contractor shall be liasoning with ibr authorities including approval of drawings / documents from ibr authorities and also getting the final approval of the job from ibr authorities including payment of any fee or charges to ibr authorities for this purpose (20% of joints). 4) alloy steel piping (astm a335 gr. p22) units- transportation of all piping items from owner's storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, grinding, edge preparation of pipes and fittings, like flanges, elbows, tees, reducers etc. to match the mating edges of different thickness; fit-up, bending, welding using approved welding electrodes as per owners quality requirements etc. as per codes/specifications, drawings etc. (alloy steel joints shall be welded by doing root run using tig welding followed by filler passes by manual / semi-automatic arc welding. the job is to be pre-heated prior to welding and all joints to be stress relieved and fully radiographed, however, charges for st
Tender For custom bid for services - comprehensive annual maintenance contract of cs12 eakon cold store located at doddanekundi plant acd for a period of 3 years -summary: comprehensive annual maintenance contract includes maintenance, repair/replacement of all the components of the cold stores as follows: a) compressor, condenser unit, evaporator unit, suitable refrigerant, power supply system, control system, all safety features, operator panel, different type of sensors, interconnecting piping including drainage water pipes, cold room panels, coil and drain heaters, doors, lighting, temperature recording panels, and all other electrical, mechanical as well as electronics components of the systems & eurotherm electronic recorder.b) detailed scope of work:1 vendor should take over the cold stores for camc, in as-is-conditions., 2) preventive maintenance (pm) of the units to be carried out every month in consultation with user / maintenance dept, and detailed pm schedule to be drawn up and a copy of the pm carried out (service report) should be forwarded to purchase department duly endorsed by maintenance dept. for the reference and records. this pm should be carried out apart from periodical servicing and attending the breakdown calls. 3) servicing of the units should be carried out once in every three months, within two weeks of commencement of the quarter. this should be carried out preferably on sundays/ holidays. this servicing involves cleaning of condensers, cooling coils, filters (if any) leakage testing & rectification; and any/all other works required to ensure proper functioning of the units. a copy of the service carried out (service report) should be forwarded to purchase dept. duly endorsed by user/ maintenance dept for the reference and records. 4) the firm should monitor the temperature/ attend breakdown / preventive maintenance or any other request from user/ maintenance /quality dept. & monitor the functioning of all the cold stores. the firm should monitor and record the cold store chamber temperature every hour during shift hours and should take signature on recorded values by user, quality dept /maintenance dept. daily. the camc vendor s scope of work will be active for three shifts per day/round the clock, including sundays & holidays, i.e. all days throughout the camc period. 5) the firm should inform all the three departments user/qa/maint. in the event of malfunctioning of the equipment is noticed. they also should ensure safety of the materials stored in the event of failure of the cold stores. 6) the firm should report any abnormality, breakdown, or any bypass made immediately to all the three dept viz user, maintenance and quality dept. the equipment uptime should be greater than 95% without any interruption. 7) the firm should inform to the maintenance department in the case power failure, so that maintenance dept. can arrange for switching on the dg supply. 8) the firm should able to read the temperature in the electronic temperature recorder. 9) the firm should attend any number of breakdown complaints as and when reported by user/ maintenance dept/ quality dept during the contract period. the breakdown complaints should be attended within 8 hrs from the receipt of oral or written complaints and the system should be rectified within a day, except for the major breakdowns. 10) the firm should bring all the tools and tackles necessary including consumables for the repair / servicing. 11) the firm should hand over the cold stores in good working condition after the completion of camc, failing which necessary remedial actions will be taken to recover loses to acd-hal by deducting equivalent amount from the due amount. c) monthly checks: checking and servicing of cold stores.- (a) compressors- condensing units, solenoid valves and all gauges, drier, globe valves and all gauges, hp/lp switches, oil pressure switches ., expansion valve and mixture., refrigerant level and top-up if required., oil le
Tender For providing of custom bid for services - sch a1 cleaning of return air filter and drain pipe and testing of cab ac,custom bid for services - sch b1 fault diagnosis and troubleshooting of cab ac,custom bid for services - sch b2 repairs to cab ac units in locomotives and fault findings and testing and brazing of copper pipes and gas charging in to ac equipment gasr407c,custom bid for services - sch b3 evaporator coil repair,custom bid for services - sch b4 condenser coil repair,custom bid for services - sch b5 rewinding of blower and condenser motors of roof mounted cab ac units,custom bid for services - sch c1 supply and fitment of hermetically sealed scroll compressor with make emerson climate zr28k3e tfd522,custom bid for services - sch c2 supply of condenser fan propeller type,custom bid for services - sch c3 supply of skf make bearing and overhauling of condenser and blower motor with skf make bearing,custom bid for services - sch c4 supply and fitement of control transformer 415 110v,custom bid for services - sch c5 s