Web Analytics Made Easy - StatCounter

Fuel Oil Pump Tenders

Get complete information related to latest Fuel Oil Pump Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Fuel Oil Pump Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Fuel Oil Pump Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :45021511 Due date: 11 May, 202611 May, 2026 2.40 Lacs
Tender For bm-divn:vibration analysis and laser aligment of pa/fd/id fans mills and fuel oil pumps of ktps vii stage for the year 2026 27

State Government

CTN :44906637 Due date: 05 May, 202605 May, 2026 1.54 Crore
Tender For procurement of m/s sakhi engineers private limited make various valves installed in foph (fuel oil pump house) area of 2x660 mw,ph-ii, sstpp , dongalia

Central Government/Public Sector

CTN :44184058 Due date: 20 Apr, 202620 Apr, 2026 NA
Tender For corrigendum : supply of fuel oil pump package_ bpcl bina_ all items as per price format annexure 4-i

CTN :44868984 Due date: 13 May, 202613 May, 2026 NA
Tender For routine, preventive, breakdown maintenance and overhauling jobs (mechanical works) of pressure parts, wind box and burners, air pre-heaters, scaphs, esps, aux. prds, ducts, dampers , gates, coal pipes, soot blowers, safety valves, hp/lp piping and - routine, preventive, breakdown maintenance and overhauling jobs (mechanical works) of pressure parts, wind box and burners, air pre-heaters, scaphs, esps, aux. prds, ducts, dampers & gates, coal pipes, soot blowers, safety valves, hp/lp piping and manual valves, fuel firing system (including fuel oil pump house) etc. of boilers of 2x210 mw and 2x250 mw bhel make units of ghtp, lehra mohabat.

CTN :44842599 Due date: 17 Apr, 202617 Apr, 2026 10.15 Lacs
Tender For replacement of damaged/worn-out ldo (80/ 100) pipe lines with newly fabricated bends, reducers, different sizes of fuel oil pump house area to unit -1 boiler along with necessary preparation of steam blowing and water flushing of ldo pipe lines during the year 2026-2027

CTN :44470492 Due date: 17 Apr, 202617 Apr, 2026 NA
Tender For corrigendum : stabilization of soil layers underneath the proposed additional kulti pump house 2400 cusec by providing poly urethane pu curtain grouting and cement bentonite grouting including soil exploration at kulti, haroa, north 24 parganas - - stabilization of soil layers underneath the proposed additional kulti pump house (2400 cusec) by providing poly urethane (pu) curtain grouting and cement bentonite grouting including soil exploration at kulti, haroa, north 24 parganas.

Central Government/Public Sector

CTN :44548941 Due date: 13 Apr, 202613 Apr, 2026 NA
Tender For corrigendum : tender ref bhel/cpc/krd/c_bop2_fgd/26/101 for civil, structural and architectural works of bop 02 and fgd at 2x660 mw mahagenco koradi project tps - unit 11 and 12 - civil, structural & architectural works of lime storage silos, lime wet grinding & processing house, lime slurry tanks, lime slurry recirculation pump house, auxiliary absorbent tanks, primary hydro cyclone feed tank, gypsum dewatering building, reclaim/ filtrate water storage tank, secondary hydro cyclone feed tank, fgd waste water tank, fgd process water tank, fgd filter/clear water tank, fuel oil pump house, fuel oil tanks, etc. at 2x660 mw mahagenco koradi project (unit 11 & 12)

Central Government/Public Sector

CTN :44736841 Due date: 17 Apr, 202617 Apr, 2026 NA
Tender For request of budgetary quote for supply, installation, testing and commissioning of safety circle inside port premises near immigration center 1). signage led screen with metal fabrication support metal fabrication for screen & logo providing and installing branding led circular shape screen, including supply of led display. panel. ms fabrication frame structure with proper support, anchoring and alignment, internal wiring, power supply arrangement, weather protection, testing and commissioning. complete in all respects as per approved design and site requirements. 2). turbine tree 3). fountain providing, supplying, installing. testing and commissioning of 10 nos. 1" foam nozzles with accessories and 16 nos. 12v, 18w underwater rgb led lights. supply and installation of 2 nos. kirloskar brothers limited make 5hp, 440v open well pumps with related fittings. providing and commissioning of 2 nos. electrical control panels with dol starter, elcb and overload protection system. complete upvc astm plumbing inside pond and 150 meters of 0.5 sq.mm x 4 core isi flexible cable for pump and lighting work. 4). mosaic tiles in fountain/pond area 5). providing and fixing mosaic tiles in fountain/pond area, including cleaning and surface preparation, application of waterproof adhesive, proper laying with alignment, epoxy grouting of joints, edge finishing and curing, complete in all respects as per site requirements water proofing providing and applying waterproofing treatment to fountain/pond area, including surface preparation, crack filling, application of approved waterproofing chemical/compound in required coats, curing, and testing for leakage, complete in all respects as per site requirements. 6). light pole providing and erecting metal street light pole of approved height and design, base plate, anchor bolts, internal wiring provision, painting/coating for corrosion protection, and complete installation in all respects as per site requirements. 7). acrylic signage providing and fixing acrylic signage, including laser-cut acrylic letters, uv printing as required, ms frame for support, led backlit provision. proper alignment and mounting, complete in all respects as per approved design and site requirements. 8). rcc work providing and laying rcc slab of m25 grade having thickness 250 mm to 300mm 9). bermuda carpet effect grass with plants providing and executing landscape work including preparation and dressing of soil, supply and plantation of approved shrubs, ornamental plants and trees with manure and watering system, laying of natural/lawn grass with proper leveling and rolling, and decorative pebble work around plants and pathways for aesthetic finish, complete in all respects as per approved layout and site requirements. 10). granite top & wall cladding with required wall & plaster work providing and fixing granite top and wall cladding work, including required surface preparation, necessary wall construction plastering, adhesive fixing, proper alignment, joint filling, edge polishing and finishing. complete in all respects as per approved design and site requirements. 11). electrical lights & points providing, supplying. installing. testing and commissioning of electrical main line including supply and laying of required cables, conduits, distribution connections, and complete wiring for all lights, along with supply of fixtures, fittings, accessories, labour charges and testing, complete in all respects as per site requirements. 12). main line of water supply & return providing, supplying. installing. testing and commissioning of main water supply and return line system, including excavation, supply and laying of approved quality pipes, fittings, valves, joints, supports, connection to pumps/tanks, pressure testing and commissioning, complete in all respects as per site requirements. 13). ss metal logo on top providing and installing 12 feet height ss-(stainless steel) metal revolving logo structure, including

State Government

CTN :44730296 Due date: 21 Apr, 202621 Apr, 2026 1.42 Lacs
Tender For dismantling & grouting of foundation bolts and other allied works in ash slurry pump house at dspm tps, cspgcl korba east

corporations/Associations/Others

CTN :44467320 Due date: 02 Apr, 202602 Apr, 2026 17.21 Lacs
Tender For corrigendum : maint of rota side wagon tippler e e -repl of main rails and raising of rails , tightening, repl. of all bolts, clits , repl,re fixing of bushes , repl of spur gear assembly , repl of rack pinion , oh of reduction gear box , replacement of sector gear , alignment, grouting of tippling base rollers , repl,repairing of hopper grill , alignment of tipplers , repl,repairing of outboard stool , dismantling,repl of top pivot housing , repl of wooden block , matching of teeth of sector gear , re-fixing lock lever , repl of top stop locking gears assly , side beam fixing of tippler , alignment of motors of wagon tippler , servicing of spray line valve size 4 inch , servicing of spray line valve size 3 inch , servicing of spray line valve size 2 inch , oh of overhead spray pumps , servicing of spray nozzles , lifting, proper fixing of vf tray , changing, fixing of side packing , to provide the patches , repl of plates of vf tray, chutes , removal of foreign , fillings oil in gear box , servocoating,tightening, repl of damaged bolts , greasing of all the nipple point , repl of break shoe liner , repl of main rail beam of wagon tippler , provision of backup in main rail beam , work on central platform , repairing of main rail beam , repairing of rollers of coal spill plates , fab, erection of back support of vf mouth chute , fab., installing of vf tray supports , repl of coal spill plate , repairing of pit platform of main rail beam , repl of damaged beam of vf , repairing of counter balance beam , repairing of mdu base structure , repairing of damaged split spur gear , fab., of mouth piece of vf , erection of new fabricated mouth piece of vf , oh of hoisting system , oh of hopper spray pump, line , provision of hopper liners, in coal hopper of vf , fab. erection of coal hopper partition stool , raising and re-fixing of mouth piece of coal liner chute of vf , repl of back,side plate of mouth piece , to attend the coal leakage from top mouth piece , re-fixing,repositioning of side and back supports , repairing,reposition of side guards of mouth piece , repl of buffer block and buffer pads of counter balance beam , repl of brake drum of thruster brake assly , repl of input,output,intermediate pinion of gear box , fab. and erection of counter balance beam , repairing of wagon tippler plate form by cutting and welding , removing the fallen loaded wagon in pit , inserting the side beam pins in bracket , dismantling,removing the broken shafts of wagon tippler , installation of drive and adjacent intermediate shaft , cutting, fabricated and installation of resting outer rail beam bottom plate
 Loading, Please wait...

Connect us via What's Up