Web Analytics Made Easy - StatCounter

Gi Strip Tenders

Get complete information related to latest Gi Strip Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Gi Strip Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Gi Strip Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :38350074 Due date: 18 Dec, 202418 Dec, 2024 84.03 Lacs
Tender For corrigendum : provision of tyre killers hydraulic bollards and boom barriers at dabh airport indore - sitc of electro- hydraulic bollard systems completed as required. , design,sitc of automatic boom barrier vehicle gate - 6.8 mtrs. , design,sitc of automatic boom barrier main entry gate - 7.1 mtrs. , design,sitc of automatic boom barrier exit gate - 7.3 mtrs. , design,sitc of automatic boom barrierrefueller gate - 6.0 mtrs. , design,sitc of automatic boom barrier new fire station gate - 10 mtrs. , sitc of electro hydraulic tyre killermain entry gate - 7.1 mtrs. , sitc of electro hydraulic tyre killer exit gate - 7.3 mtrs. , sitc of electro hydraulic tyre killer new fire station gate - 10 mtrs. , supply of 4p, 63 a mccb 25 ka in suitable size enclosed box . , supply of 4x25 sqmm xlpe insulated, 1.1 kv grade power cable , supply of 63 mm dia od size hdpe pipe. , laying of hdpe pipe up to 63 mm dia , laying of xlpe power cable upto 35 sq. mm , laying of xlpe power cable of 1.1 kv grade up to 35 sq. mm. , laying and fixing xlpe power cable of 1.1 kv. up to 35 sq. mm. , supplying and making end termination. 4 x 25 sq. mm 28mm. , earthing with g.i. earth pipe 4.5 metre long. , supplying and laying 25 mm x 5 mm g.i strip. , providing and fixing 25 mm x 5 mm g.i. strip. , providing and fixing 25 mm x 5 mm g.i. strip on surface.

CTN :38560765 Due date: 24 Dec, 202424 Dec, 2024 12.00 Lacs
Tender For work of supply, installation, testing and commissioning earthing for transformer center with maintenance free, ready capsule, pipe-in-cage(pic) type earthing and connections to the various parts of transformer center using gi strip and gi nut bolts at adajan & pal subdivision under rander division. and if it is required work to be carried out in other scheme & other sub division under rander division.

corporations/Associations/Others

CTN :38513929 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s jari distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s jari distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38513944 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect

corporations/Associations/Others

CTN :38513945 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s gaura distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s gaura distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with c

corporations/Associations/Others

CTN :38513947 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s hathigan distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s hathigan distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect

corporations/Associations/Others

CTN :38513948 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s hata distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s hata distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38513949 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s dahi distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s dahi distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38514414 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s jhirilakashipur distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s jhirilakashipur distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories i

CTN :38473901 Due date: 18 Dec, 202418 Dec, 2024 65.00 Lacs
Tender For corrigendum : supply of ivss for hpcl tirunelveli ird - fixed flp camera , dome camera flp , ptz non flp camera , cctv server , vms software , client ws without led , 55in led tv , 8 port network switch , 4 port network switch , 24 port network switch , junction box , liu with fiber mgmt , galv 8 mt pole , 4c x 2.5 sqmm cbl , laying of cables , s and l of arm cat , s and l of cat6 cable , ofc cable 6 core , laying of ofc , frls earthing wire , 50 mmx6 mm gi strip , pcc , s and f of structl steel , s and l of bolt nut , integration w exist system , camc 1st yr , camc 2nd yr , camc 3rd yr , camc 4th yr , camc 5th yr
 Loading, Please wait...

Connect us via What's Up