Get complete information related to latest Graphite Grease Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Graphite Grease Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Graphite Grease Tenders.
Tender For supply, installation, testing & commissioning of microprocessor based digital automatic karl fischer titration system for coulometric determination of water content in insulating oil of main tra nsformer & gr of electric locomotives as per els/bza technical specifications no. b/trs/spec/4/238, s heets 1, 2, & 3. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of abb make lv drive - abb make lv drive gear lubricants for enclosed industrial gear drives conforming to is 8406, servo control drive - servo motor operated lvc as per is 9815 (part 1), heavy fuel oil as per is 1593, morpholine (v3) for bulk supply as per is 12084, biscuits as per is 1011, self priming centrifugal pump as per is 5120 , acetone as per is 170, xlpe cable for working voltages up to and including 1.1 kv as per is 7098 (part 1), neela jhabba (up), insulating oil for transformer as per powergrid ts
Tender For dry lubricant spray (graphitegrease) molycote d321r (or) lubricote s21 in 400 ml/ 500 ml spray can (or) anabond m321 400ml / 500 ml (or) stanvac to be supplied in 400ml / 500ml s pray can. sample to be approved by consignee before supply. [ warranty period: 30 months after th e date of delivery ]
Tender For supply of inhibited mineral insulating transformer oil as per is: 335/2018 (type-ii) and railways required as per rdso letter no.ti/psi/nsoil/policy/07 dt.27.02.2007 & letter no.ti /psi/nsoil/policy/08 dt.06.02.2008 and letter no.ti/psi/trnpwr/policy/16/01 dt.28.10.2016 an d letter no.ti/psi/nsoil/policy/19 dt.26-07-2019. [ warranty period: 30 months after the date of delivery ]
Tender For supply of inhibited mineral insulating transformer oil as per is: 335:2018 and railways requirement as per rdso letter no.ti/ psi/ insoil/ policy/19/01-18 dated 26.07.2019. [ warra nty period: 24 months after the date of delivery ]