Get complete information related to latest Horizontal Silo Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Horizontal Silo Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Horizontal Silo Tenders.
Tender For supply of tyre 17 point 5 x 6 point 25 6-10 120 mph tube type , tube 6 point 00-6 , brake disc , limit switches , hydraulic oil mil prf 5606h , spherical bearing rod end-right hand , spherical bearing rod end-left hand , reservoir assembly , master cylinder assembly , brass male branch tee 272 p- 03x02 , brass male connector 268 p - 03x02 , nyloflow nylon tubing , tire storage rack
Tender For corrigendum : supply of spares and deputation of service engineer for mechanism overhauling of of 400 kv cgpisl make sf6 cb - o ring p18 , o ring p7 , control valve seat , 3 bond compound 1 pkt 10 gms , air reservoir o ring , al. pipe o ring iap 100 , set of circlips split pins dowelpins etc , darina grease 1 pkt 250 gms , anabond 680silastic1080 100 gm , drain valve , check valve nrv , safety valve , resistor 3.3 k ohm , trip latch spring , antipumping spring , holding latch with roller bearing , bearing for barpin where holding latch gets latched , bearing for holding latch barpin mechframe , fornt rear door gaskets , operation counter , cap seal with o ring , shockproof rubber with hardwares , chemistic , bronze washer , filter pad for louvers , blind caps for gas stop valvedilo valve cap , thermostat , gas pressure gauge , air pressure gauge , air pressure switch with adopter , space heater 250w , lr switch 7 pole , tnc switch 4 pole , window glass with gasket cord , aux. switch shaft with lever , trip coil 220v dc , close coil 220v dc , 3no2ncdc contactor with add on block 4 no , 3 no2nc dc contactor with add on 2no 2nc , motor contactor 415v ac , overload relay 4 to 6a , mcb 4 pole 415v ac , mcb 2 pole 230v ac , compressor belt a63 , compressor tuneup kit , o ring iap40 , o ring iap 90 , shock absorber oil , emery pad , overhauling charges for mech of 400 kv cgl make cb type 400fm40a
Tender For custom bid for services - service order for pm of 20nos blt wj as per scope of work -types of servicing:- 1. check the hydraulic oil level in the reservoir. it should be between 'run' and 'high' limit with the bridge loaded. , 2. replace hydraulic oil completely. , 3. check the return line and pressure line filters for clogging indication. , 4. examine the hydraulic pipelines for leakages inside and outside the . , 5. unload the bridge, start the main pump and operate all cylinders in and out. pressurize them to the working pr.(300 bar) and watch for any leakages. leakages on rotary joints should also be observed. 6. put on the master switch and power-on-switch on different control , panels. , 7. start the main pump and operate no.1 and no.2 cylinder to extreme end condition. keep operating the cylinder in the end position. read pi pump pressure. if should be 300 bar. , 8. operate the no.3 or locking cylinder to its extreme position and check the pressure of p2 pump. the pressure should be 280 bar. 9. operate the levers of pvg-32 valve after starting the pump. the levers should move freely. check up all the joints and circlips. 10. start the auxiliary engine and check the rpm setting. it should be 2500. also check, start and stop button for their functioning. 11. remove the air cleaner of the auxiliary engine. 12. check the blower driving belts. , 13. start the auxiliary engine and load the auxiliary pump to 300 bar by operating no.2 cylinder. observe the exhaust of the auxiliary engine. , 14. drain the oil from the reduction gear box of the auxiliary engine. 15. visually inspect the launching mechanism compnents mainly spade, , box, arm for any cracks / deformation (plate / welds). , 16. check the connecting pins of the launching mechanism f r lubrication. for excess play, dsmantle and check for wear. , 17. check the fixing of the rotary joints and the pipe clamps and the limit switches. , 18. check the haunch and the pin on arm assembly for cracks/ , deformation. , 19. check the securing of the trunion pins of no.3 cylinder, the linkage assembly pins and the cylinder mounting pins. , 20. check the rotation of the cylinder no.3 roller for free movements. , , san , -2- , 21.operate the locking cylinder and check the linkages locking the , bridge. , 22. operate the locking cylinder 'in' and 'out' and check the limit switches on the locking cylinder box for their operation, , 23. put the bridge back on the resting pads and see the cone position (alignment). , 24. with the bridge resting on the pads, check the operated condition of limit switches (switch should close). , 25. check the bridge hinge joint for weld cracks and proper securing of the main pins. , 26. check for any damage on top surface of trackways, entry to the bridge (bridge ends), anti-skid strip and 'w' strips (welded , underneath the bridge) for damages. , 27. check the torr ropes and the gudie ropes for their serviceability. , 28. hook the bridge to the launching mechanism and engage the hook of no.3 cylinder with moving crossbeam of the bridge and tighten the , ropes. the moving crossbeam should be parallel. , 29. check the moving crossbeam for any damage / crack. also observe the main pin, slide blocks and bolts securign the sliding blocks. 30. pulley blocks to be checked for weld crack/ deformation. 31. check the pulley and the pin securing them for wear and lubrication. , 32. check the lever connecting the larger pully and also the roller , retaining the rope with the larger pulley. , 33. check the guide pates retaining the rope for its wear / proper unting. , 34. check the end bracings and tube bracings for any deformation / , cracks. , 35. check the beta light markers for any deformation / functioning. 36. inpsect the bridge from underneath for any cracks / rust spot. ii) description of servicing job: , 1.if found low, top up. , (2).replace hydraulic oil completely , 3.if found clogged clean 'or' replace the element. , 4.any leakage noticed should be preve
Tender For change of main transformer oil pipeline assembly from transformer to choke (rectifier side) and change of auxiliary reservoir of memu at rsw/dhd
Tender For supply of bush bonnet hinge - bush bonnet hinge , speedometer kilometer , return fuel pipe line , air pressure gauge , assy steering oil reservoir , vane pump , oil pressure gauge prical , tail light vehicular