Web Analytics Made Easy - StatCounter

Hydrometer Scrap Tenders

Get complete information related to latest Hydrometer Scrap Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Hydrometer Scrap Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Hydrometer Scrap Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :39622920 Due date: 31 Mar, 202531 Mar, 2025 NA
Tender For providing of repair and overhauling service - 4362 calibration of laboratory equipment and glassware with anticipatory consumable spares; laboratory equipment and glassware with anticipatory consumable spares; yes; buyer premises

Central Government/Public Sector

CTN :39555888 Due date: 25 Mar, 202525 Mar, 2025 7.00 Lacs
Location: Goa - Goa Goa - Goa
Tender For custom bid for services - annual maintenance contract for ground support equipment- this scope of work for is for the engagement of a technical person qualified with a minimum diploma in mechanical engineering, for the amc of ground support and equipment (gse).the technical person will be deployed to manage and maintain all gse items. the scope of workinclude preventing, maintenance, repairs the scope of work under proposed amc comprises of:- (a) painting of all items of gse at least twice in a year or whenever required will be carried out bythe contractor. the paint will be supplied by the contractor. (b) the consumables spare including lubrication oil (servo 68, air compressor lub oil), hoses,filters, cables, plugs, seals, washers, pins, circlips, brushes for painting, cleaning material (includingsoap/ detergent, cloth, rag pieces, etc), gauges, sight glass, other plastic/rubber components,adapters, wheels, tyres, bearings, bushes, beading, all jack consumable spares (o-ring, springs,metallic bearing, bushes, metallic washers & grease), required for undertaking scheduled/ periodicalservicing and repair of the gse enclosed are to be supplied by the contractor. (c) the scheduled/periodical servicing of gse as per list attached and repairs- wheneverwarranted. (d) the cost of consumable require for scheduled/ periodical servicing of gse will be borne by the contractor. (e) the contractor shall cater for one in number qualified technician(diploma in mechanica!engineering) for five days in a week for carrying out routine inspection and servicing of gse. all the maintenance and repair activities are to be undertaken by suitable qualified technical personnel and within reasonable time frame as decided mutually by customer and contractor. working hours of unit(icgae goa/ 800 sqn) will be followed by the contractor's repair/ maintenance team. the leaverelief is to be provided by the contractor well in advance and the same is to be intimated to the unit.the leave relief needs to be qualified, knowledgeable and well conversant with the available gse. (f) calibration of gauges as per servicing schedule by nabl accredited laboratory is to beundertaken within contract and calibration certificate needs to be provided. (g) hydro static test (hst) of nitrogen cylinder and lp compressor is to be undertaken withincontract, if due. (h) replacement of gauges if unserviceable is to be undertaken within contract. -msme exemption - yes | startup exemption - no

CTN :39195007 Due date: 03 Mar, 202503 Mar, 2025 NA
Tender For corrigendum : tender for supply of cold and cool rooms for yard 3037 to 3040 ngopv - supply_all components of cold and cool room_590000010001_1000056861_3037 , tools / special tools_590000018500_1000056861_3037 , installation and commissioning spares_590000018300_1000056861_3037 , onboard spares for 2 years use_590000018000_1000056861_3037 , submission of binding drgs , manuals and docu_590000019000_1000056861_3037 , as-made drawings , manuals and documents_590000019001_1000056861_3037 , inspection and tests certificate_590000019002_1000056861_3037 , dqa(n)/ iacs approved classification_590000019003_1000056861_3037 , mtc from nabl accredited laboratory/iacs_590000019004_1000056861_3037 , type approval certificate_elec items_590000019005_1000056861_3037 , guarantee certificate_590000019006_1000056861_3037 , design of cold and cool room_ser06398_1000056861_3037 , complete installation of cold and cool room_ser06399_1000056861_3037 , chalk test of door and air pressure test_ser06400_1000056861_3037 , heat input test of cold and cool room_ser06401_1000056861_3037 , handing over of cold and cool room_ser06402_1000056861_3037 , commissioning of cold and cool room onboard_ser06403_1000056861_3037 , service of engineers for stw_ref.plant_ser06404_1000056861_3037 , service_engineers for hat of ref. plant_ser06405_1000056861_3037 , operational and maintenance training_ser06406_1000056861_3037 , supply_all components of cold and cool room_590000010001_1000056862_3038 , tools / special tools_590000018500_1000056862_3038 , installation and commissioning spares_590000018300_1000056862_3038 , onboard spares for 2 years use_590000018000_1000056862_3038 , submission of binding drgs , manuals and docu_590000019000_1000056862_3038 , as-made drawings , manuals and documents_590000019001_1000056862_3038 , inspection and tests certificate_590000019002_1000056862_3038 , dqa(n)/ iacs approved classification_590000019003_1000056862_3038 , mtc from nabl accredited laboratory/iacs_590000019004_1000056862_3038 , type approval certificate_elec items_590000019005_1000056862_3038 , guarantee certificate_590000019006_1000056862_3038 , design of cold and cool room_ser06398_1000056862_3038 , complete installation of cold and cool room_ser06399_1000056862_3038 , chalk test of door and air pressure test_ser06400_1000056862_3038 , heat input test of cold and cool room_ser06401_1000056862_3038 , handing over of cold and cool room_ser06402_1000056862_3038 , commissioning of cold and cool room onboard_ser06403_1000056862_3038 , service of engineers for stw_ref.plant_ser06404_1000056862_3038 , service_engineers for hat of ref. plant_ser06405_1000056862_3038 , operational and maintenance training_ser06406_1000056862_3038 , supply_all components of cold and cool room_590000010001_1000056863_3039 , tools / special tools_590000018500_1000056863_3039 , installation and commissioning spares_590000018300_1000056863_3039 , onboard spares for 2 years use_590000018000_1000056863_3039 , submission of binding drgs , manuals and docu_590000019000_1000056863_3039 , as-made drawings , manuals and documents_590000019001_1000056863_3039 , inspection and tests certificate_590000019002_1000056863_3039 , dqa(n)/ iacs approved classification_590000019003_1000056863_3039 , mtc from nabl accredited laboratory/iacs_590000019004_1000056863_3039 , type approval certificate_elec items_590000019005_1000056863_3039 , guarantee certificate_590000019006_1000056863_3039 , design of cold and cool room_ser06398_1000056863_3039 , complete installation of cold and cool room_ser06399_1000056863_3039 , chalk test of door and air pressure test_ser06400_1000056863_3039 , heat input test of cold and cool room_ser06401_1000056863_3039 , handing over of cold and cool room_ser06402_1000056863_3039 , commissioning of cold and cool room onboard_ser06403_1000056863_3039 , service of engineers for stw_ref.plant_ser06404_1000056863_3039 , service_engineers for hat of ref. plant_ser06405_1000056863_3039 , operationa
 Loading, Please wait...

Connect us via What's Up