Get complete information related to latest Illumination Work Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Illumination Work Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Illumination Work Tenders.
Tender For providing of custom bid for services - dismantling of existing 33kv 33kv switchgear and relay control panels repair maintenance of malangir pump house substation pump motorized valve control panels lt distribution electrical wiring workilluminationwork install..
Tender For corrigendum : construction of nodes, drinking water facility, toilet, landscaping, parking, pathway, repairing of facade and beatification of betwa bridge and development work including internal, external electrification and illuminationwork at orchha niwari
Tender For corrigendum : tender for supply of equipment design erection tetsing and commissioning for sop to 4g bsnl tower authority by providing single phase lt line at lagga chalga along with augmentation of existing dtr under esd chamba no ii - supply of lt line with acsr 6/1/2.59 mm sq. on steel poles (0.060 km)vill. lagga and aug. of 11/.4 kv 25 kva to 63 kvs s/stn. lagga section sahoo esd chamba-ii t.s.no. 97/24-25), acsr 6/1/2.59 (30mm ) {includes 2 conductor lengths for 1 and additional 1% (sag, jumpering and wastage}, prov. steel tubular poles.8mtrs, muff for steel tubular pole (1800mm long) with concrete filling, shackle insulator with d-iron, stay set complete in all respect, stay wire (7/3.15 mm) (8.0 kg per stay set), prov. g.i. wire 8swg, prov. egg insulator, prov. eye hook, nut & bolts off size, aluminium paint, erection of lt line with acsr 6/1/2.59 mm sq. on steel poles (0.060 km)vill. lagga and aug. of 11/.4 kv 25 kva to 63 kvs s/stn. lagga section sahoo esd chamba-ii t.s.no. 97/24-25), acsr 6/1/2.59 (30mm ) {includes 2 conductor lengths for 1 and additional 1% (sag, jumpering and wastage}, prov. steel tubular poles.8mtrs, muff for steel tubular pole (1800mm long) with concrete filling, shackle insulator with d-iron, stay set complete in all respect, stay wire (7/3.15 mm) (8.0 kg per stay set), prov. g.i. wire 8swg, prov. egg insulator, prov. eye hook, nut & bolts off size, aluminium paint, supply of aug. of 11/.4 kv 25 kva to 63 kvs s/stn. lagga, prov. 11/.4 kv, 63 kva s/stn., pipe earthing with gi,charcoal & salt, prov. lt distribution panel with mccb (160 a, 10 ka, 4p,1 no.) & sfu (32 a 5 no. rewireble) for 63kva trf. as per specification, lt cable 3-1/2 core-70mm sq., surge arrester, 9 kv station class, aluminium thimbles, copper thimble, energy meter (3-phase, 4-wire) dlms compliant 1000/5 a ct type for 63 kva transformer, erection of aug. of 11/.4 kv 25 kva to 63 kvs s/stn. lagga, prov. 11/.4 kv, 63 kva s/stn., pipe earthing with gi,charcoal & salt, prov. lt distribution panel with mccb (160 a, 10 ka, 4p,1 no.) & sfu (32 a 5 no. rewireble) for 63kva trf. as per specification, lt cable 3-1/2 core-70mm sq., surge arrester, 9 kv station class, aluminium thimbles, copper thimble, energy meter (3-phase, 4-wire) dlms compliant 1000/5 a ct type for 63 kva transformer, mannual carriage of existing & new transf.(25 & 63 kva) 2.00 km back to store, supply of lt line with acsr 6/1/2.59 mm sq. on steel poles (0.650km) vill. chalga section chaned esd chamba-ii t.s.no.96 /24-25), acsr 6/1/2.59 (30mm ) {includes 2 conductor lengths for 1 and additional 1% (sag, jumpering and wastage}, prov. steel tubular poles. 8mtrs, prov. steel tubular poles. 9mtrs, muff for steel tubular pole (2000mm long) with concrete filling, shackle insulator with d-iron, stay set complete in all respect, stay wire (7/3.15 mm) (8.0 kg per stay set), prov. g.i. wire 8swg, prov. egg insulator, prov. eye hook, nut & bolts off size, coil earthing, aluminium paint, erection of lt line with acsr 6/1/2.59 mm sq. on steel poles (0.650km) vill. chalga section chaned esd chamba-ii t.s.no.96/24-25), acsr 6/1/2.59 (30mm ) {includes 2 conductor lengths for 1 and additional 1% (sag, jumpering and wastage}, prov. steel tubular poles. 8mtrs, prov. steel tubular poles. 9mtrs, muff for steel tubular pole (2000mm long) with concrete filling, shackle insulator with d-iron, stay set complete in all respect, stay wire (7/3.15 mm) (8.0 kg per stay set), prov. g.i. wire 8swg, prov. egg insulator, prov. eye hook, nut & bolts off size, coil earthing, aluminium paint
Tender For repair and renovation of 8 (eight) no. cottage including pathway illuminationwork in the campus of morgan house tourism property in the district of kalimpong during the year 2024-25